Laserfiche WebLink
W 11 <br /> _J II <br /> T O GENERAL NOTES: <br /> cn <br /> w 1. COORDINATION OF WORK: LAYOUT OF MATERIALS, EQUIPMENT AND SYSTEMS ARE GENERALLY DIAGRAMMATIC <br /> z 0 UNLESS SPECIFICALLY DIMENSIONED. SOME OF THE WORK MAY BE SHOWN OFFSET FOR CLARITY. THE ACTUAL <br /> Q z LOCATION OF ALL MATERIALS, PIPING, DUCTWORK, FIXTURES, EQUIPMENT, SUPPORT, ETC. ALL DUCT AND PIPE <br /> J - <br /> 0- w ELBOWS AND ELEVATIONS ARE NOT SHOWN, CONTRACTOR TO ENSURE BID COVERS ELEVATION CHANGES TO <br /> W It INTERFERENCE WITH OTHER UTILITIES. ALL WORK SHALL BE CAREFULLY PLANNED PRIOR TO INSTALLATION OF ANY <br /> O DWORK TO AVOID ALL INTERFERENCES WITH EACH OTHER, OR WITH STRUCTURAL, ELECTRICAL, ARCHITECTURAL OR <br /> O OTHER ELEMENTS. VERIFY THE PROPER VOLTAGE AND PHASE FOR ALL EQUIPMENT WITH THE ELECTRICAL PLANS. <br /> W <br /> i ALL CONFLICTS SHALL BE CALLED TO THE ATTENTION OF THE ARCHITECT AND ENGINEER PRIOR TO THE <br /> ■ <br /> 20 INSTALLATION OF ANY WORK OR ORDERING OF ANY EQUIPMENT. <br /> 0 Q 2. CUTTING, BORING, SAW CUTTING OR DRILLING THROUGH THE NEW OR EXISTING STRUCTURAL ELEMENTS TO BE <br /> zDONE ONLY WHEN SO DETAILED IN THE DRAWINGS OR ACCEPTED BY THE ARCHITECT AND STRUCTURAL ENGINEER II <br /> i WITH THE APPROVAL OF THE DSA REPRESENTATIVE OR AUTHORITY HAVING JURISDICTION. <br /> QO <br /> 3. ALL WASTE PIPES THAT ARE SMALLER THAN 4" MUST HAVE A MINIMUM SLOPE OF 2% 1465 North Van Ness Avenue <br /> Fresno, Califorina 93728 <br /> 0 Z 559 442.4642 <br /> O uwi TITLE 24 MECHANICAL& PLUMBING REQUIREMENTS: <br /> o 0 1. ALL AIR COOLED HVAC UNITS SHALL HAVE MINIMUM EFFICIENCIES PER TABLE 110.2-A. <br /> 2. ALL FURNACES SHALL HAVE MINIMUM EFFICIENCIES PER TABLE 110.2-J. 559.485.9081 <br /> Oj 2 3. ALL FURNACES SHALL HAVE STAND BY LOSS CONTROLS PER SECTION 110.2 (d). <br /> www.itarchinc.com <br /> w 4. ALL THERMOSTATS SHALL COMPLY WITH 110 (b)OR(c)AS APPLICABLE <br /> o 5. ALL HVAC SYSTEMS SHALL HAVE OUTSIDE (VENTILATION)AIR PER 120.1 (b)2. ALSO SEE MECHANICAL PLANS FOR <br /> = 0 MINIMUM OUTSIDE AIR SETTINGS. <br /> z <br /> 6. WHEN CO2 VENTILATION DEMAND CONTROLS ARE SPECIFIED, PROVIDE IN ACCORDANCE WITH 120.1 C. <br /> D <br /> ) 3 7. MINIMUM VENTILATION RATES SHALL BE INITIATED ONE HOUR PRIOR TO SCHEDULED OCCUPANCY PER 120.1 (c)2. <br /> LL O J 8. EACH HVAC SYSTEM SHALL HAVE SHUT-OFF AND RESET CONTROLS COMPLYING WITH 120.2 (e). <br /> M 9. ALL OUTSIDE AND EXHAUST DAMPERS SHALL AUTOMATICALLY CLOSE PER 120.2 (f). <br /> Z rn 10. ALL SYSTEMS GREATER THAN A NOMINAL 54 MBH COOLING CAPACITY SHALL HAVE ECONOMIZERS EQUIPPED WITH <br /> Z FAULT DETECTION AND DIAGNOSTICS PER 120.2 (i). <br /> w 11. ALL DUCTWORK INSULATION SHALL COMPLY WITH 120.4 <br /> U d 12. SET UP ALL THERMOSTATS WITH A DEAD BAND OF NO LESS THAN (3) DEGREES TO PREVENT CYCLING BETWEEN <br /> � <br /> HEATING AND COOLING. <br /> 0 - 13. ACCEPTANCE TESTS REQUIRED PRIOR TO GRANTING OCCUPANCY. <br /> 0_ 0 •OOUTDOOR AIR VENTILATION SYSTEMS PER NA 7.5.1. Arch IteCt <br /> 0 LJ <br /> W • CONSTANT VOLUME SINGLE ZONE SYSTEM CONTROLS PER NA 7.5.2. ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ <br /> w w • AIR ECONOMIZERS PER NA 7.5.4. <br /> L • DEMAND CONTROL (CO2) CONTROLS, WHEN REQUIRED, PER NA 7.5.5. TE (:FD 4": <br /> d W • FAULT DETECTION & DIAGNOSTICS (FDD) PER NA 7.5.11. <br /> (nO <br /> EQUIPMENT ANCHORAGE: <br /> 0 KEYNOTES: <br /> = z ALL MECHANICAL, PLUMBING AND ELECTRICAL COMPONENTS SHALL BE ANCHORED AND INSTALLED PER THE DETAILS ON 2) CO OV CW FOR VESSEL RINSER, TO P3SHEET A-3.0 <br /> THE APPROVED CONSTRUCTION DOCUMENTS. WHERE NO DETAIL IS INDICATED, THE FOLLOWING COMPONENTS SHALL BE <br /> 3) DRAIN CONNECTION COUNTER, REFER TO P6 ON SHEET A-3.0 <br /> 3 0 ANCHORED OR BRACES TO MEET THE FORCE AND DISPLACEMENT REQUIREMENTS PRESCRIBED IN THE 2016 CBC, 4) WATER AND DRAIN CONNECTION FOR DIPPER WELL WITH RINSE, REFER TO P1 ON SHEET A-3.0 <br /> zo o SECTIONS 1616A.1.18 THROUGH 1616A.1.26 AND ASCE 7-10 CHAPTER 13, 26 AND 30. O <br /> 5) WATER AND DRAIN CONNECTION FOR VESSEL RINSER, REFER TO P2 ON SHEET A-3.0 <br /> � � 6) WATER AND DRAIN CONNECTION FOR RAPID RINSER, REFER TO P3 ON SHEET A-3.0 <br /> 00- 1. ALL PERMANENT EQUIPMENT AND COMPONENTS. O <br /> Z W 7) CONNECT(N)4"W TO (E)SEWER <br /> 2. TEMPORARY OR MOVABLE EQUIPMENT THAT IS PERMANENTLY ATTACHED (E.G. HARD WIRED)TO THE BUILDING 8) 4" S, 2"V 4 3/4" CW FOR FLOOR MOUNTED TANK <br /> z UTILITY SERVICES SUCH AS ELECTRICITY, GAS OR WATER. 9) 2"W, 1-1/2"V 1/2 CW& 1/2 HW FOR WALL HUNG LAV, L-1 E <br /> OZ 3. MOVEABLE EQUIPMENT WHICH IS STATIONED IN ONE PLACE FOR MORE THAN 8 HOURS AND HEAVIER THAN 400 l <br /> 10) VENT TO RISE FROM BELOW GRADE <br /> K T POUNDS OR HAS A CENTER MASS LOCATED 4 FEET OR MORE ABOVE THE ADJACENT FLOOR OR ROOF LEVEL THAT <br /> _ _ _ _ _ _ 11) 3/4"CW&3/4 HW DOWN WALL FOR 3 COMPARTMENT SINK 4"J <br /> DIRECTLY SUPPORT THE COMPONENT ARE REQUIRED TO BE ANCHORED WITH TEMPORARY ATTACHMENTS. <br /> Z O 12) 2"W& 1 1/2"V FOR FLOOR SINK, REFER TO P8 ON SHEET A-1.0 <br /> 13) 2"W,1-1/2", 1/2" CW& 1/2" HW FOR HAND WASH SINK. REFER TO P4 ON SHEET A-1.0 &A-3.0 FOR MORE INFO <br /> < 0 THE FOLLOWING MECHANICAL AND ELECTRICAL COMPONENTS SHALL BE POSITIVELY ATTACHED TO THE STRUCTURE, BUT 101 ro <br /> 14) 2"W& 1 1/2"V FOR TRENCH DRAINS. REFER TO P11 ON SHEET A-1.0 FOR MORE INFO <br /> Z Z THE ATTACHMENT NEED NOT BE DETAILED ON THE PLANS. THESE COMPONENTS SHALL HAVE FLEXIBLE CONNECTIONS <br /> Seating -1 15) 3"W&2"V FOR LARGE FLOOR DRAIN. REFER TO P7 ON SHEET A-1.0 FOR MORE INFO (� <br /> w Z PROVIDED BETWEEN THE COMPONENT AND ASSOCIATED DUCTWORK, PIPING AND CONDUIT. 101 16) WATER HEATER ON WALL STAND, WH-1 N <br /> cn Q (E)4"Sewer17) 3"W 2"V 3/4" CW&3/4" HW FOR FLOOR MOUNTED MOP SINKMS-1 J <br /> DW A. COMPONENTS WEIGHING LESS THAN 400 POUNDS AND HAVE A CENTER OF MASS LOCATED 4 FEET OR LESS ABOVE • , , , N <br /> 0 Q THE ADJACENT FLOOR OR ROOF LEVEL THAT DIRECTLY SUPPORT THE COMPONENT. <br /> LL W B. COMPONENTS WEIGHING LESS THAN 20 POUNDS OR IN THE CASE OF DISTRIBUTED SYSTEMS, LESS THAN 5 POUNDS (E)2"CW 7 GJ Ln <br /> 0 O PER FOOT, WHICH ARE SUSPENDED FROM A ROOF OR FLOOR OR HUNG FROM A WALL. <br /> 0 w Z'J Q GJ . <br /> z PIPING MATERIALS: <br /> wF <br /> W C) 1. SANITARY SEWER AND VENT PIPING BELOW GROUND: JOHNS-MANVILLE RING-TITE OR EQUIVALENT, POLYVINYL <br /> 0 :] CHLORIDE (PVC)GRAVITY PIPE, WHERE PERMITTED BY CODES. <br /> PLUMBING FIXTURE AND EQUIPMENT SCHEDULE 4-J L <br /> Z m 2. SANITARY SEWER AND VENT PIPING ABOVE GROUND: ABS SCHEDULE 40 PIPE AND FITTINGS PER ASTM D2661 & 2" V7 5 (V0 <br /> Q 0_ ASTM D2680 PER TABLE 701.2 <br /> °w 0 3. WATER PIPING ABOVE GROUND: HOT WATER, COLD WATER, AND FILTER WATER: TYPE 'L' COPPER WITH LEAD-FREE Hall 4 I TAG FIXTURE DESCRIPTION HW CW VENT WASTE/ O �~ <br /> SEWER " 4-J> z SOLDERED JOINTS OR PEX PIPE PER 2016 CPC TABLE 604.1 MM M <br /> V) 4. DOMESTIC WATER BELOW GRADE, SLAB, PAVED AREAS: POLYVINYL CHLORIDE (PVC) PRESSURE RATED SCHEDULE 106 W <br /> > 40, ASTM D 2241, WITH RUBBER RINGS, ASTM D 1869. GALVANIZED MALLEABLE IRON, GALVANIZED STEEL, TYPE "M", KINGSTON 1.28 SPT K-25077. ANITIMICROBIAL <br /> W Z OR TYPE "L"ARE PROHIBITED MATERIALS FOR WATER SUPPLY AND BUILDING WATER PIPING BOTH UNDERGROUND - <br /> °w w AND IN BUILDINGS 2 - - - - un n n - 2 WATER CLOSET FINISH, TWO PIECES TOILET, DURABLE METAL �' a--J <br /> Q Q 5. INSULATION OF DOMESTIC HOT WATER SUPPLY AND RETURN, CONDENSATE DRAIN PIPING: GLASS FIBER PIPE --- - ---- WC-1 (ADA) POLISHED CHROME TRIP LEVER, STANDARD 12" 1" 2" 4" � O <br /> w INSULATION WITH FACTORY APPLIED WHITE JACKET, J-M MICRO-LOK 750AP, 1 INCH THICK FOR PIPE SIZES 1 INCH 1 / 0 C=m o QD O <br /> 0 D AND SMALLER, AND 1-1/2" INCH THICK FOR PIPE SIZES 1-1/4" INCHES AND LARGER. HOT WATER PIPE INSULATION 2 3 I 4 ROUGH-IN 0 Ln N J <br /> WD IM SHALL HAVE MINIMUM WALL THICKNESS OF NOT LESS THAN THE DIAMETER OF THE PIPE FOR A PIPE UP TO 2 U ® KINGSTON K-2700 WALL HUNG LAV, VITREOUS <br /> o INCHES IN DIAMETER. INSULATION WALL THICKNESS SHALL NOT BE LESS THAN 2 INCHES FOR A PIPE OF 2 INCHES I CHINA WALL MOUNT INSTALLATION MOUN MODEL <br /> M 3 OR MORE IN DIAMETER <br /> V 0 Q 3" <br /> „ Back of House WALL HUNG 8884 .05 GPM M-PRESS CHROME ONE HANDLE <br /> Q z L-1 1/2" 1/2" 1-1/2" 2" <br /> Q APPLICABLE CODES AND REGULATIONS: 3 102 - LAVATORY (ADA) METERING LAVATORY FAUCET WITH <br /> vi 3 3"FCO 14 14 14 I UNDERCOUNTER MIXING VALVE LEONARD LF 170 <br /> O z z CALIFORNIA CODE OF REGULATIONS (C.C.R.) / 102T I 3"FCO I ASSE 1070 COMPLIANT MIXING VALVE, MV-2 <br /> • + 0 PART 1 -2016 CALIFORNIA STANDARDS ADMINISTRATIVE CODE, TITLE 24, C.C.R. <br /> PART 2 -2016 CALIFORNIA BUILDING CODE (C.B.C.), TITLE 24, C.C.R. VOLUMES 1-3. �� 3"VTR CAST IRON ENAMELED CORNER FLOOR SINK „ „ „ „ <br /> / MS-1 MOP SINK 3/4 3/4 2 3 <br /> z U PART 3 -2016 CALIFORNIA ELECTRICAL CODE, TITLE 24, C.C.R. /// 4��� --- WITH ZURN Z843M1-XL FAUCET <br /> Oil PART 4 -2016 CALIFORNIA MECHANICAL CODE (C.M.C.), TITLE 24 C.C.R. 105 _��r747 <br /> I 2 _ __ --- - LEONARD LV-20-E-LF THERMOSTATIC MIXING <br /> W PART 5-2016 CALIFORNIA PLUMBING CODE (C.P.C.), TITLE 24, C.C.R. _- ---- <br /> O PART 6 -2016 CALIFORNIA ENERGY CODE, TITLE 24, C.C.R. I � 4 5 MV-1 MIXING VALVEVALVE ASSE 1017 COMPLIANT 1 GPM MIN FLOW <br /> 73 V W0 PART 9-2016 CALIFORNIA FIRE CODE, TITLE 24, C.C.R. __� I I 1 CAPACITY, LOCKING TEMPERATURE <br /> O Q - - - - o•- - - - - I REGULATING HANDLE SET TO 125°F <br /> D (K z 8 WC-1 LEONARD 170A-LF EXPOSED POINT OF USE > <br /> 03 O <br /> a- PLUMBING LEGEND 6 - MIXING VALVE, ASSE 1070 TO CONTROL DOWN Q <br /> 0 0 4 L-1 g 3 �u 4 MV-2 MIXING VALVE TO 0.25GPM ECO-MIX CERTIFIED LEAD-FREE <br /> Q) Z w SYMBOL ITEM ABBR. - 0- [ INTEGRAL INLET CHECKS AND STAINLESS STEEL - m <br /> W <br /> / SCREENS <br /> Z z SOIL OR WASTE S or W y RHEEM LIGHT DUTY COMMERCIAL ELECTRIC w V <br /> _ WATER HEATER MODEL # ELD52-TB 50 GAL 3000 Ln <br /> LL VENT V a° co J 4' I WH-1 WATER HEATER �� <br /> LL O- W/MIN, 12 W MAX 15516 SHIPPING WEIGHT. <br /> --- g L-1 -------J ` APPROX 420LB TOTAL. 21" X 59" TALL f6 <br /> -� / <br /> .- <br /> VTR VENT THRU ROOF WC- <br /> 11A 1 O 10� � <br /> - - <br /> I 0 DOMESTIC COLD WATER CW 4 2'VTR <br /> Q Oa O O L <br /> U Q O - - DOMESTIC HOT WATER HW - V <br /> Q Z 12"VTR <br /> 0 DOMESTIC HOT WATER RETURN HWR i \\ O <br /> CD CONDENSATE DRAIN CD <br /> 103 <br /> 7 w = EXISTING PIPING (E) I CO <br /> (� <br /> Q (E) EXISTING I V QQ 4- 1 <br /> a I }' <br /> IO (N) NEW I N <br /> N Z 5 - - - - office 0 rl <br /> Z 0 FLOOR CLEANOUT FCO 103 <br /> O mWALL CLEANOUT WCO <br /> o! <br /> O 00- PIPING TURN UP rn <br /> Publishing Status <br /> \ <br /> 3w <br /> PIPING TURN DOWN <br /> 0 Fr 4"FCO Schematic <br /> \ w 3 \7 POINT OF CONNECTION <br /> N <br /> 0 F SHUT OFF VALVE BELOW GRADE Design Developm't, <br /> Z � <br /> Q o SHUT OFF VALVE Site Plan Review <br /> OLJ <br /> W3 <br /> • 9 WW Bidding <br /> 0 <br /> Ln � � <br /> m = Plan Check 05-21-18 <br /> W3 <br /> •j P <br /> Z cn <br /> uwi ° G E E Revisions <br /> � W <br /> a- <br /> w } <br /> irz <br /> O ir Q <br /> Off <br /> 00 <br /> Q LL <br /> � z <br /> J QO <br /> 0 <br /> Q <br /> s z °� <br /> 0 MECHANICAL�Flklz <br /> J <br /> DESIGN <br /> U 0- 0 Fresno, CA 93727 <br /> 1 <br /> zff 559-656-1170 <br /> Q � <br /> O � o Scale <br /> r W ly rr <br /> /pq As indicated <br /> 11A } PLUMBING PLAN yLJN QQ m Project Manager <br /> o SCALE: 1/4" = 1'-0" M3784 * TODD CLARK <br /> Exp. 03-31-20 LJ <br /> QF <br /> O w �rF Fo�� Project Number <br /> U) N OF CAIS <br /> Z f! fOHAN1r, N. <br /> 00 <br /> 1 - _Lodi <br /> N (n 0 <br /> O o o Sheet <br /> N .� <br /> J Qo <br /> 0 PZ . o <br /> z w } <br /> m <br /> - 0 <br /> J V) <br /> < ::) <br />