My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
6100
>
4800 – General/Other Program
>
PR0535193
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:46:01 PM
Creation date
8/17/2020 8:09:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4800 – General/Other Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0535193
PE
1862
FACILITY_ID
FA0009271
FACILITY_NAME
OAK RIDGE WINERY, LLC
STREET_NUMBER
6100
Direction
E
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95240
APN
04912034
CURRENT_STATUS
01
SITE_LOCATION
6100 E HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Process Hazard <br />K1304•] <br />question, scenario, possible consequences/hazards, and engineering and <br />administrative controls for a specific item, the team would rank the risk. The <br />process being studied is partitioned into sections to make the study more <br />manageable and focus the study team. <br />A risk -ranking scheme was used for three reasons: <br />• To evaluate the risk of each hypothesized scenario <br />• To assess whether additional safeguards are required for scenarios with <br />unacceptable levels of risk <br />• To allow a means to prioritize recommended actions <br />Ranking the risk was a simple process: <br />1. Compare the scenario, consequences, and hazards for an item against the four - <br />tiered qualitative consequence ("C") range provided with the matrix and select <br />number, 1 to 4, which matches most closely the consequence / severity for that <br />scenario. Note that engineering and administrative controls were not considered <br />when assigning a consequences value, i.e., the consequence value was selected <br />under the assumption that engineering and administrative controls fail. <br />2. Compare the scenario, the consequences, hazards and the engineering and <br />administrative controls for an item against the four -tiered qualitative frequency <br />("F") range provided with the matrix and select a number, 1 to 4, that matches <br />most closely the likelihood for that scenario. <br />3. Use the consequence value and the frequency value to document the risk ranking <br />("RR"), A to D, using the matrix. <br />The purposes of the recommendations are: <br />• To reduce the probability of occurrence of an incident <br />• To reduce the severity of the consequences, in the event the incident were <br />to occur; <br />• Request an update or addition of a document; or <br />• To request further information, when the scenario could not be fully <br />described owing to a lack of data. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.