Laserfiche WebLink
r"�, rlti <br /> H&H ENGINEERING CONSTRUCTION <br /> 4-4204-0010317 Page 2 of 2 <br /> Ogle Code i __-- <br /> -- ----—- R+ oe Rabe QNMrAmount <br /> 12113 11 EWRONMENTAL FEE 1 SC81 9836 16.25 t-'O0 - --- 16.25 <br /> -16.25/Ticket EWRONMENTAL FEE 1 1 <br /> 12113 )l FUEL RECOVERY FEE SC819837 53.73 1-00 5373 <br /> (7.67%/Ticket)FUEi L;RECOVERY FEE <br /> SJ Cnty/AB 93.9 Fee at 2:001TN 0.00 20.57 4114 <br /> SJ Cnty/Rd.Mitigation Fee at 0.16(TN 000 20..57 3.29 <br /> SJ Qity,/Erni Health Fee at 0.091TN 0 DO 20.57 1.86 <br /> ----Material Summary------- <br /> SW-T1 MBER/TREATED/OLD 20,57 <br /> ToW CaTw Chmpas =_________> $1,494.68 <br /> 0 <br /> 0 <br /> 0 <br /> a <br /> 0 <br /> - <br /> .. - <br /> "�t3 "3P '1 - <br /> �, <br /> i ;.{`F <br /> .e <br />