Laserfiche WebLink
&,,H ENG(NEERING CONSTRUCTION <br /> 4-4204-00ID311 7 <br /> 02104 PAe QudJV <br /> EINl\\Al.'R,.0,'N!MENTAL!FEE I <br /> -16-00 J Ticket ENMIRWIMENTAL FEE 1 1, 036 18.00 1'.0.018.00 <br /> 02tG4 )I, IFUE[L REC:0VERS'IFEE <br /> ffi..80%J Twket)RUEL REWWERY FEE SC955037, 46-06 1.100 46.06 <br /> Ulf. vs SwTweaww'"ejaz <br /> DTVI I VS Refaretxe:4457759 S446XG 6773 677.30 <br /> ®2J11 VS Vah,icte:,HJElJM J19 <br /> 02J11 W Contract:42041MG8 <br /> 02111 VS Generator iName:H&,H ENGINEERING <br /> 02/11 (1 ENVIRG N!M E NTAL FEE I SC957532 18.00 11-00 <br /> -118-00.1 Ticket ENVIRON-MENTAL-FEE 1 1 <br /> 02111 )1 FUEL.,RECOVERY FEE SC957533 46..,D6 1.00 46.06 <br /> �6-80%1 Ticket)FUEL RECOVERY FEE <br /> SJ Cnty I AB 939 Fee at 2.00/TN 0.00 26,11 52,22 <br /> SJ Cnty/Rd Mitigation Fee at 0.18/TN 0-100 26.11 4�71 <br /> SJ Cnty/Env Health Fee at 0,09ITN 0.00 2611 2.34 <br /> ----- Matedal Summary-- <br /> SW-TIMBERITREATED/OLD <br /> 26.11 <br /> Total Current Charges > $2,382 45 <br />