My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
212
>
2200 - Hazardous Waste Program
>
PR0514288
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 3:48:59 PM
Creation date
8/17/2020 8:43:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0514288
PE
2229
FACILITY_ID
FA0010339
FACILITY_NAME
H&H ENGINEERING CONST INC
STREET_NUMBER
212
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
STOCKTON
Zip
95206-3920
APN
17728019
CURRENT_STATUS
01
SITE_LOCATION
212 INDUSTRIAL DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�. <br /> AIW 1011or <br /> Forward Inc INVOICE <br /> 1145 West Chader Way , ►' Invoice Date 05115/2020 <br /> Stockton. CA 952+006 Invoice No 4204-OON55169 <br /> REPUBLIC customer-No 4-4204-0010317 <br /> SERVICES <br /> L2tsTTDTU OMMI, Paige No 1 of 2 <br /> auu�4aau�luaaruu � �ua�ruauu���®�llu�lu�ull��ru�allrlr��a���u��J�la Daae Date 06/4412020 <br /> H &H ENGINEERWG CONSTROCTI0N Current Charges Total Amount Due <br /> MARIA JAIIMES <br /> 212 INDUSTRIAL DRIVE $797.80 $797.80 <br /> STOCKTON,CA 9.5206 <br /> Tease Ray Totail Amount Daae <br /> Billing Questions? Call 209-466-4492 <br /> IMPORTANT!!!To erasure your payment is posted to the correct invoice,we need <br /> the torn remittance from your invoice. Thank you. <br /> - Oalle -Code —�--- ---- - _ Refere--oe Rile Amas d <br /> 0904 VS SW-TIMBOUTREATED101-11) Y8 i464= 67.73 1055 IN 71455 <br /> (6104 VS Reference:6146648 <br /> 10 05/04 VS Vehicle:DCC 3354 ,DCC 40YD <br /> fl <br /> 05104 VS Contract:4204122008 <br /> Z 05/04 VS Generator Name.H&H ENGINEERING <br /> z 45104 {1 ENVIRONMENTAL FEE 1 SC983177 18.00 100 18.00 <br /> z -18.00/Ticket ENVIRONMENTAL FEE 1 1 <br /> Z 05/04 }1 FUEL RECOVERY FEE SC983178 4130 100 41.30 <br /> z (5.78%/Ticket)FUEL RECOVERY FEE <br /> Z SJ Cnty I AB 939 Fee at 2.00/TN 000 10.55 21.10 <br /> z SJ Cnty I Rd Mitigation Fee at 0.181TN Uj� �. 000 10.55 1.90 <br /> SJ Cnty/Env Health Fee at 0 09/TNJ N 000 10-55 0.95 <br /> --—Material Summary <br /> SW-TIMBERfTREATEDIOLD �� 10.55 <br /> MAY �6 2020 PI� bE Tq�E D <br /> ACCOUNT STATUS �\ <br /> currewt n Duets Over 9i Days Tata-Mwuel Due <br /> $797.80 _— 0.00 0.00 000 $-797.80 <br /> J. 4,Please return this portion below with your payment.Do not attach check to stub. 4, 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.