My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
212
>
2200 - Hazardous Waste Program
>
PR0514288
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2026 7:51:19 PM
Creation date
8/17/2020 8:43:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0514288
PE
2229 - GEN 50<250 TONS PERMIT
FACILITY_ID
FA0010339
FACILITY_NAME
Rail Works Track Systems
STREET_NUMBER
212
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
STOCKTON
Zip
95206-3920
APN
17728019
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
212 INDUSTRIAL DR STOCKTON 95206-3920
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colt ion 1nic Managing Universal Waste <br /> 212(ndusftW Dirt ve <br /> Stockton, <br /> on Ca,95206 40 CFR 273 & 22 CCR 66273 <br /> H&H Ernguneenirng Consbuction Inc_ strives to provide its employees with a safe and <br /> healthful workplace. lln order to achieve this goal, all levels of management and <br /> supervision are required to ensure that the guidelines of this Managing Universal <br /> Waste Plan are followed. <br /> Purpose - _ `—�-----��--®--�----------.._ <br /> 2 1.. This document has been designed to: <br /> 2 1.1. Implement a system that provides employees access to enAhronmental health and <br /> safety information(training, bulletins, etc.)necessary for the safe completion of their <br /> job responsibilities, <br /> 2.1.2 Ensure that safety inspections are routinely conducted, and <br /> 2.1.3 Ensure that the Three Fundamental Objectives of the H&H Engineering <br /> Construction Inc. Safety Program are effectively pursued <br /> 2.1.3.1 The Three Fundamental Objectives are: <br /> • Striving for an Injury and Illness free workplace. <br /> • Identifying and eliminating operational deficiencies that can lead to <br /> injuries, illnesses, and/or fatalities. <br /> • Maintaining a proactive and effective Safety Program (e.g., open <br /> communication between employee and supervisor, employee health and safety <br /> training, regularly scheduled inspections, accident and injury investigation). <br /> 3 ..,.__...µScope ..�....._.w---. __ a.�..,.__..�...ti...��..,..��.�._._....�...,�....�.®,...._.�-_......�.,-._..�..__.. ....u._.� <br /> 31 This document applies to all personnel under the direct supervision of an H&H <br /> Enaineerir Construction Inc. employee (i.e., Temporary Employees, Temporary <br /> Agency Employees,Tart time Employees, Full time Employees,. All personnel shall <br /> comply with the provisions outlined in this document. <br /> 4. Responsible Persons(22 CCR 66273) <br /> 4.1 Department Heads and Chairs <br /> 4.1.1. Be familiar with this Plan and its contents and objectives. <br /> 4.1.2. Support the Plan and oversee its implementation. <br /> Universal Waste Procedure.doc <br /> Page 2 of 7 Version 2 (January 2014' <br />
The URL can be used to link to this page
Your browser does not support the video tag.