Laserfiche WebLink
Management Approval - §112.7 <br /> This SPCC Plan has been reviewed and approved by management at a level with the authority to <br /> commit necessary resources for implementing this Plan. The programs and procedures outlined in <br /> the Plan will be implemented and periodically reviewed and updated in accordance with 40 CFR <br /> Part 112, and applicable state and local requirements. Owens-Brockway is committed to the <br /> prevention of discharges of oil to navigable waters and the environment, and maintains the highest <br /> standards for spill prevention, control, and countermeasures through regular review, updating, and <br /> implementation of this SPCC Plan. <br /> I hereby certify that the information provided in this SPCC Plan is, to the best of my knowledge, true <br /> and accurate. This Plan has the full approval of the management for the Owens-Brockway Plant <br /> #22 and will be implemented as required by 40 CFR 112. <br /> Name- Edisson Flores <br /> Title: Plant Manager <br /> Signature_' x�• _- <br /> Date: f <br /> GHD 1 Spill Prevention, Control, and Countermeasure(SPCC)Plan 1085405 1 Page 7 <br />