Laserfiche WebLink
ADDL. STIRRUP IF PIPE OCCURS IN STANDARD HOOK <br /> EA. SIDE (2-MIN.) 1'-O" THI5 ZONE, STEP <br /> MIN. LFTC. DOWN PER 0 4 HOOK LENGTH <br /> TYP. t" z BAR SIZE v) <br /> GLR. PET. 10/- 1 0 L 1 D (IN.) (IN.) ♦ + lz <br /> Lu O <br /> a m z <br /> a op <br /> #3 2 1/4 4 1/2 2 1/2 z <br /> 4 ° ° ° ° <br /> ° p HOOK <br /> aMIN. #4 3 6 2 1/2 Z Z J) <br /> 00 , <br /> 2 1/2 <br /> z #5 3 5/4 7 1/2 2 1/2 W Q � T_ <br /> 180° BEND 90° BEND #6 41/2 q 3 <br /> Lu <br /> I I=I I=I — =I = NOTE: <br /> ITIi iITII��11ITIITI IITIITI� a ° ° ° ° lill lilt 11 li l l l l l TYP. GRADE BM. 5TI RUPS #7 5 1/4 10 1/2 3 1/2 J U O <br /> a - --- - d = BAR DIAMETER a) Q <br /> PLACE SLEEVE WITHIN �s 0) <br /> D = MINIMUM DIAMETER OF BEND #8 6 124 L U <br /> z 6" `�'' MIDDLE THIRD OF Z }' <br /> m D = (od FOR #3 THROUGH #8 U) <br /> Q ry MIN. GRADE BM. DEPTH #q q 13 1/2 4 1/2 Q 0 0 <br /> PIPE PENETRATION STEP FTC. AND REINF. D = Sd FOR #q THROUGH #11 Z) E N `I <br /> A A5 REOD. PER PET. 10/- 0 V <br /> THROUGH GRADE BEAM TANK U) C CO <br /> NO PIPE TO BE FACE OF 6-6' 6-6' U to CO <br /> CAULK ALL PLACED THROUGH (E) WALL 1 q STANDARD REINFORCING STEEL HOOKS = � u) LL <br /> Lo <br /> PIPE TO CLEAR FTC. UNLESS APPRV'D. N.T.S. O <br /> PENETRATIONS <br /> SLEEVE BY 1" ALL BY STRUCTURAL ~ Lo S, <br /> z AROUND TRENCH ENGR. <br /> V <br /> z STIRRUP a TIE HOOK <br /> _ Ow _ <br /> III=1 =1 =1 =1 =1 III=1 =1 <br /> ti0 �i j �� j HOOK LEN67H <br /> ° I11=III=III=1I1=1I1= � I I1= =1I1=1I I ° d �`�o,� � z BAR SIZE (IN) <br /> III—III—III—III=1I IL 1=III III=1I1=1I _ Z <br /> D (IN.) <br /> 1 t=I llI—III-1_I —11' ° ad y 6 4 ° ° <br /> �111=III=11 =1 - =III (N) TANK AND 9 q0 135 <br /> I11= III- PIPE __= O I= _ ANCHORAGE <br /> III _ IIIII m =11 d ° ° -III (NOT SHOWN) #3 1 1/2 3 3 <br /> 2 <br /> 1'-6" MIN. 1 = _ _ (E) RETAINING <br /> PROVIDED 1350 BEND 900 BEND #4 2 3 3 <br /> -Mill„ -1I=I _ z WALL, V.I.F. BY O-I. <br /> #5 21/2 4 4 <br /> NO EXCAVATION FOR PIPE � GONG. FILL UNDER � �I =III NOTE: <br /> TRENCH PARALLEL TO d = BAR DIAMETER <br /> FT6. PLACED PRIOR 6" MIN. <br /> ALREADY PLACED FT6. TO FT6. D = MINIMUM DIAMETER OF BEND <br /> BELOW THESE LINES. 2'-O" MIN. D = 4d FOR #5 AND SMALLER <br /> TYPICAL PIPE PENETRATION UNDER s5.10-09 III <br /> 13 g = 2 TYPICAL STIRRUP AND TIE HOOKS <br /> FOOTING AND TRENCH LIMITATIONS N.T.S. !IIIIII I 7 N.T.S. <br /> - TOP BARS - q0° HOOK EMBEDMENT AND CLASS B TEN51ON LAP SPLICE FOR GRADE 60 REINF. <br /> Fr_ 2,500 P5I 3,000 P5I 4,000 PSI 5,000 PSI <br /> BAR EMBED. GLA55 B EMBED. GLA55 B EMBED. GLA55 B EMBED. GLA55 B <br /> 51ZE (IN) (IN) (IN) (IN) (IN) (IN) (IN) (IN) <br /> IIIII I #3 q 31 q 28 8 25 7 22 <br /> ° FOUNDATION d° #4 12 41 11 38 10 33 q 2q <br /> IIIII (E) PAVING, #5 15 51 14 4-712 41 11 36 <br /> IIIII V.I.F. #6 18 61 1-7 5615 4q 13 44 <br /> ° 4 ° ° ° ° d #7 21 Sq 20 81 1-7 71 15 63 <br /> d 4< <br /> ° — — #8 24 102 22 q3 1 q 81 17 72 <br /> _ ICI #q 27 115 25 105 22 q1 20 81 <br /> UPI = OTHER BARS - q0 ° HOOK EMBEDMENT AND CLASS B TEN5ION LAP SPLICE FOR GRADE 60 REINF. <br /> III IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIII <br /> 11111111111 -1 -1 -1 -1 -1 -1 -1 -1 I-III=III=III=III=III=III=III=III=III=III=III=III=III=III=III=III=III=III=1 f'c 2,500 F51 3,000 P51 4,000 P5I 5,000 F51 <br /> BAR EMBED. CLASS B EMBED. CLASS B EMBED. CLASS B EMBED. CLASS B <br /> (IIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII III III=111 — SIZE (IN) (IN) (IN) (IN) (IN) (IN) (IN) (IN) <br /> I„ I— #3 Cl 24 q 22 8 111 7 17 <br /> III IIIIII, — 11 #4 12 32 11 2q 10 25 q 23 <br /> "III" #5 15 3q 14 36 12 31 11 28 <br /> #6 18 47 17 43 15 37 13 34 <br /> #7 21 bq 20 63 17 54 15 4q <br /> #8 24 78 22 72 1 q 62 17 56 <br /> #q 27 88 25 81 22 70 20 63 <br /> NOTE: <br /> 1. TOP BARS = HORIZONTAL BARS (OTHER THAN IN WALL5) PLACED WITH MORE THAN 12" OF FRESH <br /> CONCRETE 15 CAST BELOW THEM. SEE PET. 3/-. <br /> 2. ABOVE TABLES ARE BASED UPON MINIMUM CLEAR COVER GREATER THAN 1.0db AND MINIMUM <br /> CLEAR 5PACING GREATER THAN 2db. WHERE EITHER OF THESE REOUIREMENT5 15 NOT MET, <br /> INCREASE THE EMBEDMENT OR LAP LENGTH BY 50%. <br /> 3. USE GLA55 B LAP SPLICE FOR ALL BAR 5PLIGE5 TYP. <br /> 4. FOR ADDITIONAL INFORMATION SEE PET. 3/-. <br /> SECTION TYPICAL REINFORCEMENT EMBED <br /> 14 10 6 2 <br /> _ AND LAP SPLICE N.T.S. <br /> NOTE: OMIT CURB AT OWNER'5 REQUE5T IF NOT REQUIRED TO <br /> MEET ALL LOCAL, STATE AND FEDERAL CODES AND <br /> 10 <br /> LAW5 FOR ABOVEGROUND STORAGE TANKS (A5T5). q0° HOOK CLASS B LAP O <br /> 6" 3/4" CHAMFER, EMBED SPLICE <br /> CURB TYP. 6 <br /> o a <br /> a ° ° <br /> EQ. EQ. ° � � ° <br /> (3" MAX. IN COLUMN VERT. REINF.) <br /> EMBEDMENT LAP SPLICE OFFSET <br /> RETAINING WALL <br /> (E GONG. FOUNDATION NOTES <br /> 6 v #4 AT 12" O.G. O <br /> 1. SEE SHEET 51.0 FOR GENERAL NOTES. FOR TYPICAL REINF. INFO � W/ q0° HOOK <br /> L -1 SEE DET. 1/-, 2/-, AND 3/-. N AT END <br /> Lu * #5 AT 12" O.G. TOP BAR U. <br /> - v 2. SEE DRAWIN65 BY OTHERS FOR WATERPROOFING, DIMENSIONS, W/q0° HOOK #4 AT 12" O.G. <br /> OPENING LOCATIONS, ETC., U.O.N. EA. END W/q0° HOOK TOP BAR LAP SPLICE <br /> - - - - - - EA. END <br /> 3. SEE DRAWIN65 BY OTHERS FOR 5LAB-ON-6RADE SLOPES, a a <br /> DEPRESSIONS, DRAIN5, FINISHES, ETC., U.O.N. (E) PAVING, <br /> V.I.F. ° ° Q <br /> LU <br /> 4. VERIFY LOCATION OF UNDERGROUND UTILITIES PRIOR TO • • • d a ° ° ° �, % 0 J <br /> lu <br /> EXCAVATION. NOTIFY THE OWNER PRIOR TO EXCAVATION. ° ° ° a a d O w <br /> (N) 12" MAT W/ #5 AT 12" O.G. ° <br /> EA. WAY, TOP AND BOTTOM <br /> ON 6" GRAVEL 5. EXCAVATIONS SHALL BE MADE A5 NEAT LINES REQUIRED BY THE ,o • 4 , ° d ° ° d ° d ° 4 ° °° CU) ( ) <br /> 0 51ZE AND SHAPE OF THE STRUCTURE. NO MATERIAL 15 TO BE a a O R;: Q <br /> z > <br /> rn z EXCAVATED UNNECESSARILY. o 0 0 0 0 0 0 0 0 0 0 0 0 0 (=III=III=III=III=III- - ° ° a ° ° J <br /> (N) 6-0"(P TANK AND ANCHORAGE SYSTEM U <br /> PROVIDED BY 0-I. CONNECT EACH 6. REMOVE (E) PAVING AT AREA OF (N) FOUNDATION AND <br /> ANCHORAGE TO FOUNDATION W/ (2) 7/5"0 O EXCAVATE TO A DEPTH OF 1'-O" BELOW TOP OF (E) PAVING. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ — <br /> HOT-DIPPED GAL/. THREADED ANCHOR 6" CURB ON 4 SIDES <br /> 11=III=III=III=III=III=III=III=III=III=III=III=III=IIIIIIII=III=III= O � <br /> OTHER BAR <br /> RODS, NUTS AND WA5HER5 EMBED A5 REQ'D. 7. FOR PIPE PENETRATIONS AT OR BELOW FOOTINGS, SEE PET. q/-. III=III=III=III=III=III=III=III=III=III=III=III=III= =1 OTHER BAR <br /> MEM LAP SPLICE <br /> ANCHOR RODS q" BELOW TOP OF 11GRAVEL BASE IIIIIIII <br /> FOUNDATION AND SET IN EPDXY. MAX WT. 8. FOR REINF. AT GONG. MEMBER INTERSECTIONS, SEE 4/-. HORIZONTAL LAP VERTICAL LAP ISSUES/ REVISIONS <br /> OF TANK AND CONTENTS = 18,000 LBS. � �,- . <br /> 1 q. SEE DRAWINGS OTHER THAN STRUCTURAL FOR MECHANICAL, F <br /> TEN5ION TEST ALL 7/5"0 ANCHOR ROD5 ELECTRICAL, AND OPENIN65, ETC. Rev# Date Description <br /> (8 TOTAL) PER SCHEDULE ON SHEET 51.0. <br /> TYPICAL REINFORCEMENT EMBED, 01/17/19 CONSTRUCTION <br /> 7 DETAIL 3 <br /> LAP SPLICE AND OFFSET 02/13/20 TENSION TEST EPDXY <br /> ANCHORS <br /> STD. HOOKS BEND BAR DOWN <br /> W/ 5TD. HOOK <br /> _ d <br /> ° ° ° <br /> ° a a ° ° <br /> ° ° ° <br /> a Q °d ° <br /> ° ° <br /> 4 <br /> 4 • ° <br /> • <br /> e ° <br /> ° a ° PROVIDE 2 VERT. <br /> d ° , ° BARS MIN. U.O.N. <br /> 0 <br /> o • <br /> o <br /> N <br /> N <br /> ©COPYRIGHT UNAUTHORIZED REPRODUCTION,USE OR <br /> o DISTRIBUTION OF ANY MATERIALS HEREIN WITHOUT THE <br /> ADDED TYPICAL VERTICAL BARS WRITTEN PERMISSION OF HOHBACH-LEWIN,INC.VIOLATES <br /> STD. HOOKS, FOR ANCHORAGE AS SHOWN ON THE COPYRIGHT LAWS OF THE UNITED STATES. <br /> p IN51DE OF HORIZONTAL BARS Date <br /> TYP. 5TD. HOOKS 12/21/2018 <br /> N <br /> Scale <br /> O <br /> AS NOTED <br /> 4 d <br /> rn a ° • ° • 10 4 0 • • • Drawn By <br /> °2 ° ° ° 0 JC/PMD <br /> O • • d • ° • • ° • • d ° • ° <br /> Sheet Title <br /> m <br /> g ° <br /> ° PLAN, <br /> SECTIONS, <br /> d <br /> coAND DETAILS <br /> e <br /> O <br /> ° O <br /> PLAN AT NEW TANK FOUNDATION a co <br /> M <br /> r d a Sheet No. <br /> d ° z <br /> w <br /> J <br /> TYPICAL CONCRETE S5.10-04 <br /> 8 4 S2 . 0 Q <br /> MEMBER INTERSECTIONS <br /> 1"=1'-O" 1 Of # Sheets o <br />