Laserfiche WebLink
D <br /> Fixture Trim Schedule <br /> W0'C <br /> Kohler HighIine Comfort Height k-5481- 1.28gaIIon flush. Standard polished chrome =id <br /> o�W <br /> WC-1 lever. Open faced toilet seat, brass craft BRCS1715AX supply kit Zo:X <br /> X304 <br /> Kohler Kingston K2005 ADA Lavatory 4" CC Kohler Coralais K-15593-f-CP faucet 1- 6000 <br /> PLUMBING LEGEND a=C= <br /> L-1 1/4 grid drain, 17 ga chrome p-trap. Faucet to be .5 gpm @ 60 psi Z Uj <br /> �m=Z <br /> SYMBOL DESCRIPTION SYMBOL DESCRIPTION O Z M Wimp <br /> State Comercial light Duty Electric Water Heater Model #ES6-10-SOMS 120volt 10 0 0 <��W <br /> EWH-1 gallon tank LLI <br /> ___ CW COLD WATER LINE GATE VALVE g w w Z3C <br /> ---- HW HOT WATER LINE �pBALANCING VALVESS-1 Florestone MSR 24x 24 Mop Sink floor mounted with 2" drain Chicago 897 RCF faucet / Z 3:2M <br /> n0 WO Vi <br /> ©TD TRENCH DRAIN ��� GAS COCK Elkay- Dayton Stainless Steel single bowl top mount sink Model GE12521, Kholer / a <W W= <br /> W WASTE LINE AC ABOVE CEILING Coralais fuacet K-15175, Keeney all stainless steel strainer, Keeney polypropylene p ZLa <br /> GW GREASY WASTE LINE BG BELOW GRADE S-1 trap Brasscraft compression x compression angle stop model <br /> _ _ / ® 0 W 0 <br /> I I I <br /> HV HORIZONTAL VENT MV MIXING VALVE / ~ \ <090 <br /> Fountain , lead free, light gray granite, push-button activation, 14 Gauge stainless <br /> c <br /> / o I� <br /> —SD— STORM DRAIN LINE WC WATER CLOSET steel finish, ada compliant, 8.0gph, 5.0fla, provide mounting plate. Elkay / <br /> —C— CONDENSATE DRAIN UR URINAL #Izstl8wslp. Carrier: elkay#mlp200 Provide stop&supply. Install per handicap <br /> V,VR,VTR VENT,VENT RISER,VENT THRU ROOF LAV LAVATORY requirements. <br /> —W,WD — WASTE,WATER DROP S SINK DF-1 <br /> RWL RAIN WATER LEADERSS SERVICE SINK Zurn ZN-415-S, Nickle Bronze with heel proof strainer. Provid with waterless trapFo <br /> RD ROOF DRAIN DF DRINKING FOUNTAIN FD-1 primer-TP-1 to be sure seal 2009SV waterless trap primer // <br /> W W <br /> AD AREA DRAINFHS FIRE HOSE STANDPIPE WHA-1 Precision Preformance Products sc-500 sc 2000 o /% Q o <br /> KS-1 SS 3 compartment sink. Relocated from existing facility. co / W <br /> CB, DI CATCH BASIN (DROP INLET) INV INVERT ELEVATION / _jHWS hand wash station relocated form existing facility. w H <br /> CO CLEAN OUT FIN. GD. FINISH GRADE <br /> 0 <br /> HW,TO FIXTURES r-- - -�- - --, Z gri <br /> WCO WALL CLEAN OUT POINT OF CONNECTION / ; ; O a rn rn <br /> FCO FLOOR CLEAN OUT AP ACCESS PANEL I / I I / / Z a = = Z a o <br /> ~ C U Z N <br /> YCO YARD CLEAN OUT CI CAST IRON NION TYP. CW ; ; ; / ROUTE 3/4"SECONDARY DRAIN N Z a <br /> ' / ' ' AND T&P RELIEF W D W i <br /> _ <br /> _ SECURE TANK TO FRAMING / I I / POINT OF CONNECTION TO / TO DAYLIGHT OVER MOP SINK <br /> FD FLOOR DRAIN It CENTER LINE a d m a <br /> CHANNEL W/18 GA.X 2" I r- -------- --- / ----r--------� - \ ; DOMESTIC COLD WATER // <br /> FS FLOOR SINK HDR HEADER WIDE STEEL STRAP&3/8"0 BOLTS. ; /' ; `\ / I I / %% 11 NOTE: � �00 <br /> TPV TRAP PRIMER VALVE DWN DOWN PLUMBING DRAWINGS ARE DIAGRAMMATIC. <br /> • j 3/4"H 3/I"H j i 3/4"H ROUTE ACTUAL PLUMBING LINES IN MOST <br /> 1-5/8"FRAMING CHANNEL, y------ EFFICIENT MANNER POSSIBLE.VERIFY IN <br /> CW, D, R — COLD WATER(DROP)(RISER) MBH THOUSANDS OF BTU PER HOUR ATTACH TO STUDS W/5/16"STSMS. / / <br /> � I , � I , FIELD.ROUTE WATER LINES AS HIGH AS <br /> ` I 3/4"CW % / POSSIBLE. CONFIRM WITH EQUIPMENT <br /> HW,D,R,RT — HW SUPPLY(DROP)(RISER)(RETURN) NIPC NOT IN PLUMBING CONTRACT e ET I `\ I 3/4 CW/ / 3/4"CW SUBMITTALS FOR CONNECTION SIZES. <br /> THW—T — TEMPERED HOT WATER(115°F) HW HAND WASH STATION 1 1 I / I / �/1 <br /> 2"X2" 12 GA.ANGLE CLIP, I = I !/ / z V) <br /> — G, PG — NATURAL GAS LOW PRESSURE(PROPANE) HS HOSE STATION ATTACH TO STUDS W/5/16"STSMS ----- 3/4" / I <br /> -�'-- O / 3/4"'CW_----------I' / J <br /> 18 GA.x 2"STRAPS ATTACH TO UPPER <br /> HPG — HIGH PRESSURE GAS HWG HOT WATER GENERATOR AND LOWER THIRD OF TANK 1 I / <br /> AYLIGHT 3/4"T&P 6" / / <br /> CA — COMPRESSED AIR 1 i <br /> DRAIN PIPE OVER MOP SINK <br /> HB I HOSE BIBB Uj W <br /> L_1 L_1 <br /> 24 GA SECONDARY DRAIN PAN. DAYLIGHT 3/4" <br /> © UNDER PLUMBING CONTRACT DRAIN PIPE OVER MOP SINK Q <br /> SOV SHUT OFF VALVE ,Amaxx <br /> ELEC. WATER HEATER PIPING 1 Q W <br /> DF-1 \\2„ DETAIL MP-1 <br /> SANITARYSEWERHOT & COLD WATER PLAN � w <br /> EXTENDED FCO // \\ r I� J <br /> DESCRIPTION QUANTITY FIX UNIT FIX UNIT /2 ^ v <br /> WCTANK 2 4 8 r // \\3" z Q <br /> / N. Q VTR SCALE-3/8" = V-0" <br /> WC FLUSH 0 6 p 1 / 2„ <br /> UR 0 2 0 1 r / <br /> LAV 3 1 3 y 3.. I / 2„ A / HW 1 <br /> \\ <br /> SHOWER 0 2 0 WC-1 I 1 /// 1 2„ / \ KS-1 �^ <br /> � U <br /> SHOWER ADA 0 0 0 3„ y 1 2 1 // \ ^ V) <br /> FD 1 2 2 L-1 1 1 /'C 3" L.L <br /> WHA 0 0 0 3" 4 I �y \\ FD-1 HWS-1 <br /> Tp 0 1 0 1 MS\\ <br /> y <br /> DF COMBO 0 0.05 0 SEE DRAIN AND WASTE 3 WC-1 3 <br /> BR SINK 0 2 0 TABLE FOR ANY ADDITIONAL <br /> INFORMATION 3,. <br /> IMB 0 0 0 3" <br /> KIT SINK 3 2 6 POC TO BUILDING EXISTING r / <br /> 4"SS IN BELOW SLAB. <br /> DISH WASH 0 2 0 <br /> MOP SINK 1 3 0 <br /> z <br /> S.S RISER DIAGRAM N o <br /> VENDING 0 0 0 DETAIL J <br /> HB 0 0 0 I <br /> 1 /A � oH13 LUG AT � <br /> ADDITIONAL 0 FINISH GRADE NOTE: 1 / j w o <br /> CONCRETE SEWER BOX CONFIRM EXACT LOCATIONI � i <br /> TOTAL I IN FINISHED CONCRETE FCOI 04MIN.SS SIZE IS 3" o WITH OWNER. r <br /> KS-1 <br /> FIXTURE CONNECTION SCHEDULE o I <br /> PLUMBING SANITARY WATER / X90 DEGREE ELL r ;ev <br /> FIXTURE SEWER VENT COLD HOT 0 I / FD-1 <br /> WATER CLOSET FV 3" 2" 1/2" <br /> WATER CLOSET FT 3" 2" 1" / INVERT DF-1 1 / <br /> [SEE <br /> SEE PLAN U.C. U.C. I MS-1 <br /> URINAL FV 2" 1-1/2" 3/4" -URINAL FT 2" 1-1/2" 1/2" PLUMBING FOR <br /> SIZE OF PIPE LAV 2" 1-1/2" 1/2" 1/2" I I > <br /> U)I <br /> BAR SINK 2" 1-1/2" 1/2" 1/2" `-" <br /> I `'SINGLE COTG DETAIL <br /> CLASSROOM SINK 2" 1-1/2" 1/2" 1/2" ------_ / ---KITCHEN SINK 2" 1-1/2" 1/2" 1/2" <br /> / <br /> / <br /> / <br /> MOP SINK 3" 2" 3/4" 3/4" ; ; '�, / ; % // 1 SS, <br /> PLUG AT <br /> TRAP PRIMER - - 1/2" <br /> FINISH GRADE <br /> BRASCLEANOUT BOX r--~--------�-- -//:j y---_----�--� �`� -------- <br /> S / CM <br /> FD-3" 3" 2" IN FINISHED FLOOR i / I `\ <br /> FLOOR SINK 2" 2" 1-1/2" I; I I 1 / ;' I I I / II 'c)�' ` / !' I' _ cn �\ / 1 / <br /> _____________ P.O.C. TO EXISTING <br /> FLOOR SINK 3" 3" 1-1/2" <br /> SHOWER-RES. 2" 1-1/2" 1/2" 1/2" i; / II ;' `' I \ % ;' I; I ``) // 1 / SANITARY SEWER <br /> F------------+--- / ------------- I I FIELD VERIFY LOCATION 0 <br /> EYEWASH 2" 1-1/2" 1/2" I / I / / Ij I PRIOR TO SAW CUT <br /> CEF-01 I / I CEF-01 I I ;I <br /> 4„ SSS \--I ` -, j 4„ SS <br /> ` I I <br /> // \ i 3"S lo/ 311``S� i\ // NOTE: <br /> SEE PLUMBING FOR �r'--------- Q // Q ---------'T <br /> / I \ / PLUMBING DRAWINGS ARE DIAGRAMMATIC. <br /> PLUMBING MATERIAL SIZE OF PIPE i " U, j i / ` �K V——- / 2 — —— ROUTE ACTUAL PLUMBING LINES IN MOST <br /> 2-WAY COTG DETAIL I 6"B / 6 0 I / i_______-----''" / i' // EFFICIENT MANNER POSSIBLE. VERIFY IN <br /> ROUTE VENT LINES AS HIGH AS <br /> SANITARY SEWER ABS PIPE&FITTINGS <br /> V V 3"VENTiUTR / POSSIBLECOPPER FITTINGS WITH TYPE L <br /> CLEANOUT DETAIL <br /> DOMESTIC WATER COPPER PIPE 95-5 LEAD FREE DETAIL P-1 <br /> SOLDER m DATE 2/10/2019 <br /> EXHAUST FAN SCHEDULE <br /> INSULATION 3/4"CELLULAR FOAM DRAWN BY <br /> TAG MAKE MODEL CFM POWER HP RPM WEIGHT <br /> KP <br /> CEF-1 BROAN L-100 100 120 V 1 PH 1l8 1000 21 LBS <br /> CHECKED BY <br /> KP <br /> VENTILATION PLAN WASTE & VENT PLAN JOB NO. <br /> XX—XXX <br /> Illy M P = 1 <br /> SCALE -3/8" = V-0" SCALE-3/8" = V-0" <br /> OF SHEETS <br />