Laserfiche WebLink
EQUIPMENT NOTES: <br /> 1 . PROVIDE SOLID WOOD BACKING FOR ALL WALL MOUNTED EQUIPMENT <br /> INCLUDING SINKS. <br /> 2. ALL EQUIPMENT, INCLUDING SHELVING, MUST BE SUPPORTED BY 6" HIGH, <br /> EASILY CLEANABLE LEGS, COMMERCIAL CASTORS, OR COMPLETELY SEALED IN <br /> POSITION ON A 4"HIGH CONTINUOSLY COVED BASE OR CONCRETE CURB TO <br /> FACILITATE EASE OF CLEANING. ° <br /> 3. ALL EQUIPMENT SHALL BE NSF APPROVED OR APPROVED EQUAL. <br /> 4. ALL SELF CONTAINED REFRIGERATION EQUIPMENT SHALL BE EQUIPPED WITH <br /> AN EVAPORATOR. <br /> SJB Brands, LLC <br /> 5. THREE COMPARTMENT STAINLESS SINK IS 24" DEEP WITH 3-18" SD. X 12" 17915 SKY PARK CIRCLE, SUITE J, <br /> DEEP TUBS WITH 18" WIDE DRAINBOARD AT EACH END AND 8" HIGH INTEGRAL IRVINE, CA 92614 <br /> SPLASH WHERE SINK IS AGAINST WALL. TEL: (949)475-0146 <br /> FAX(949)475-0137 <br /> 6. THE MOP SINK WILL HAVE THREADED OUTER LIP FOR HOSE ATTACHEMENT <br /> AND AN APPROVED BACKFLOW PREVENTION DEVICE. NO DOWNSTREAM VALVES OR <br /> CHEMICAL DISPENSING SYSTEMS TO BE ATTACHED TO MOP SINK FAUCET <br /> THESE DRAWINGS AND SPECIFICATIONS AND IDEAS, DESIGNS AND <br /> (UNLESS A SIDEKICK PLUMBING DEVICE IS PROVIDED). ARRANGEMENTS REPRESENTED THEREBY ARE AND SHALL REMAIN <br /> RdTHE PROPERTY OF GARY WANG & ASSOCIATES; AND NO PART <br /> 7. CONTRACTOR IS RESPONSIBLE TO RECEIVED, UNPACKAGE, ASSEMBLE AND 63 F THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR USED IN <br /> INSTALL ALL EQUIPMENT SHOWN ON THESE PLANS. CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE <br /> — � SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN PREPARED AND <br /> 1 O5 �� DEVELOPED WITHOUT THE WRITTEN CONSENT OF GARY WANG & <br /> ASSOCIATES. VISUAL CONTACT WITH THESE DRAWINGS AND <br /> 8. GENERAL CONTRACTOR SHALL OBTAIN SHOP DRAWINGS AND INSTRUCTIONS 69.1 FOFFICE ! FD <br /> FROM OWNER PRIOR TO INSTALLATION OF MILLWORK OR CABINET BASE. B9 B9.3 \ GC10 SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE of <br /> B10 AREA THESE RESTRICTIONS. WRITTEN DIMENSIONS ON THESE DRAWINGS <br /> B9.2 B12 611 L L SHALL HAVE PRECEDENCE OVER SCALED DIMENSIONS; <br /> 9. GENERAL CONTRACTOR SHALL SUPPLY AND INSTALLED WOOD CABINET BASE. CONTRACTORS SHALL VERIFY, AND BE RESPONSIBLE FOR ALL <br /> i�-/ DIMENSIONS AND CONDITIONS ON THE JOB, AND THIS OFFICE <br /> O <br /> 107 108 L GENDER MUST BE NOTIFIED OF ANY VARIATIONS FROM THE DIMENSIONS <br /> 10. MILLWORK AND COUNTERTOPS WITH CUT OUTS AND CORINGS ARE SUPPLIED WALK-IN A AND CONDITIONS SHOWN BY THESE DRAWINGS. SHOP DETAIL MUST <br /> AND INSTALLED BY GENERAL CONTRACTOR. FRE ZER -RESTROOM BE SUBMITTED TO THIS OFFICE FOR REVIEW BEFORE PROCEEDING <br /> COOLER WITH THE FABRICATION. <br /> 11 . ALL TILE FINISHES ARE SUPPLIED AND INSTALLED BY GENERAL CONTRACTOR. <br /> I <br /> 104 i A ARCHITECT <br /> 12. SNEEZE GUARD IS SUPPLIED AND INSTALLED BY GENERAL CONTRACTOR. BACK ROOM <br /> 64 AREA 64 <br /> \ J4 <br /> 9® FS 12"X12" FLOOR SINK WITH DOME AND GRATE FLUSH WITH FINISHED FLOOR. ALL Bs \ GARY WANG <br /> INDIRECT WASTE IS TO A FLOOR SINK WITH A MINIMUM 1" AIR GAP BETWEEN <br /> GRATE AND DRAIN PIPE &ASSOCIATES, INC. <br /> d <br /> B6 --� <br /> 62 1000 Corporate Center Dr., Suite 550 <br /> B2.1 s14 Monterey Park, CA 91754 <br /> TEL: (626)288-6898 FAX: (626)768-7101 <br /> B2.2 <br /> s C7.1 http://www.garywang.com <br /> B2.3 <br /> NOTES: I Ll�__� 5 <br /> I <br /> B13 <br /> REFER TO EQUIPMENT SCHEDULE B14 <br /> ON SHEET K-1 .1 . �f`T STAMP <br /> I <br /> P6 - <br /> P6.1 +- <br /> S3 <br /> P6.2 S17 S1 <br /> C7.1 <br /> B4 MW4 SSE° Agcy. <br /> B14 S11 GP6 <br /> P5 _ 101 <br /> P5.1 ° I i S10 SERVICE <br /> P5.2 I S 77 AREA F5cp <br /> RE ,04- - 019 <br /> P5.3 <br /> 9� r� <br /> ss c3 OF CA\-\F�� <br /> S8 <br /> B4 < S12 <br /> I <br /> C4 <br /> P4 S17 S7 F <br /> I <br /> 10 I S13 C3 <br /> P1 PREP <br /> P2 AREA s6 PROJECT NAME/ADDRESS: <br /> P3S 6 102 <br /> B1 S6.2 S6 <br /> AW JUICE JUICE IT UP! <br /> B1 AREA s3 <br /> \4 RIPON TOWN SQUARE <br /> FSG <br /> + G T T—1-7 c1 1201 W. MAIN ST., <br /> LI--i c � <br /> RIPON, CA 95366 <br /> I B� <br /> S6.1 C4 C5 <br /> REVISIONS: <br /> F3 F2 F1 F2 100 F1 F2 �1 - <br /> CUSTOMERS 0 - <br /> - AREA <br /> A <br /> 0 <br /> 4 <br /> A5 - <br /> I B7 <br /> © - <br /> 6 <br /> F4 F4 4 O <br /> I ISSUE DATE: <br /> 1ST - <br /> 2ND - <br /> 3RD - <br /> 4TH - <br /> 5TH <br /> 6TH <br /> JOB NUMBER <br /> ARCH PROJECT#: 18-287 <br /> DRAWN BY CHECKED BY <br /> JR ADR <br /> SHEET CONTENT <br /> EQUIPMENT PLAN <br /> N SHEET NO <br /> EQUIPMENT PLAN <br /> 1 <br /> SCALE: 1/4"=1'-0" <br />