ENERGY CODE MANDATORY MEASURES ENERGY CODE ADMINISTRATIVE REQUIREMENTS GENERAL NOTES DIFFUSERS, GRILLES & REGISTERS <br /> 1. MANUFACTURED FENESTRATION PRODUCTS AND EXTERIOR DOORS SHALL: 1. THE PERSON WITH OVERALL RESPONSIBILITY FOR CONSTRUCTION OR THE PERSON 1. ALL MECHANICAL WORK SHALL COMPLY WITH LOCAL APPLICABLE CODE AND 2016 CMC. <br /> A. HAVE A TEMPORARY LABEL MEETING THE REQUIREMENTS OF SEC. 10-111 (A) 1, NOT TO BE RESPONSIBLE FOR THE INSTALLATION OF REGULATED FEATURES, MATERIALS, COMPONENTS, OR 2. ROOF OPENINGS & PLATFORMS TO BE CURBED AND LEVEL, 6" MINIMUM HEIGHT, FLASHED AND LEGEND <br /> REMOVED BEFORE INSPECTION BY THE INFORCEMENT AGENCY, LISTING THE CERTIFIED MANUFACTURED DEVICES SHALL POST, OR MAKE AVAILABLE WITH THE BUILDING PERMIT(S) CAPPED WITH SHEET METAL. A/C CONTRACTOR TO COORDINATE REQUIRED SIZES AND LOCATIONS SYMBOL ABBREVI- <br /> U [I? <br /> U-FACTOR AND SHGC, AND CERTIFYING THAT THE AIR LEAKAGE REQUIREMENTS OF SEC. ISSUED FOR THE BUILDING, THE REQUIRED INSTALLATION CERTIFICATES) FOR FEATURES, WITH GENERAL CONTRACTOR. DOUBLE SINGLE ATION DESCRIPTION <br /> 110.6(a)1 ARE MET FOR EACH PRODUCT LINE; AND MATERIALS, COMPONENTS, OR MANUFACTURED DEVICES REGULATED BY THE APPLIANCE 3. CONTRACTOR SHALL INSTALL ALL DUCTWORKS TO SUIT THE STRUCTURAL CONDITION. PROVIDE ALL o 0 <br /> B. HAVE A PERMANENT LABEL MEETING THE REQUIREMENTS OF SEC. 10-111 (a) 2 IF THE EFFICIENCY REGULATIONS OR PART 6. SUCH INSTALLATION CERTIFICATE(S) SHALL BE MADE NECESSARY OFFSETS AS REQUIRED. VERIFY WITH ARCHITECTURAL, STRUCTURAL, ELECTRICAL AND - SA- SA SUPPLY AIR DUCT 0 <br /> PRODUCT IS RATED USING NFRC PROCEDURES. AVAILABLE TO THE ENFORCEMENT AGENCY FOR ALL APPROPRIATE INSPECTIONS. THESE PLUMBING DRAWINGS. �� <br /> 2. FIELD FABRICATED FENESTRATION AND FIELD FABRICATED EXTERIOR DOORS SHALL BE CAULKED 4. EXPOSED DUCTWORK AND PLENUMS TO BE KEPT TO A MINIMUM AND WATERPROOFED. SEAMS TO <br /> CERTIFICATES SHALL: - RA- RA RETURN AIR DUCT <br /> BETWEEN THE FENESTRATION PRODUCTS OR EXTERIOR DOOR AND THE BUILDING, AND SHALL BE A. IDENTIFY FEATURES, MATERIALS, COMPONENTS, OR MANUFACTURED DEVICES REQUIRED TO BE CAULKED WITH SEALING MASTIC BEFORE CLOSING, AND THEN COVERED WITH SECO ALUMINUM <br /> WEATHER STRIPPED. VERIFY COMPLIANCE WITH THE APPLIANCE EFFICIENCY REGULATIONS AND PART 6. PLAS-T-COTE ROOF COATING OR EQUAL SEALING COMPOUND. EXPOSED DUCTWORK AND - EA - EA EXHAUST AIR DUCT <br /> EXCEPTION: UNFRAMED GLASS DOORS AND FIRE DOORS. (SEC. 110.6 (b)) B. INCLUDE A STATEMENT INDICATING THAT THE FEATURES, MATERIALS, COMPONENTS, OR PLENUMS TO BE LINED INTERNALLY WITH 1 THICK 3-LB DENSITY DUCTLINER. <br /> 3. JOINTS AND OTHER OPENINGS IN THE BUILDING ENVELOPE THAT ARE POTENTIAL SOURCES OF AIR MANUFACTURED DEVISE CONFORM TO THE APPLIANCE EFFICIENCY REGULATIONS AND PART 6 5. DUCT INSULATION SHALL BE INSTALLED IN ACCORDANCE WITH THE 2016 CALIFORNIA MECHANICAL <br /> LEAKAGE SHALL BE CAULKED, GASKETED, WEATHERSTRIPPED, OR OTHERWISE SEALED TO LIMIT CODE AND TITLE-24 REQUIREMENTS. INSULATE ALL SUPPLY AND RETURN AIR DUCTS WITH R-4.2 -OA- OA OUTSIDE AIR DUCT SJB Brands, LLC <br /> AND THE REQUIREMENTS FOR SUCH FEATURES, MATERIALS, COMPONENTS, OR 17915 SKY PARK CIRCLE, SUITE J, <br /> FIBERGLASS BATT INSULATION WITH VAPOR BARRIER FOR DUCT IN ATTIC AND IN CEILING SPACE. <br /> INFILTRATION AND EXFILTRATION (SEC. 110.7). MANUFACTURED DEVICES GIVEN IN THE PLANS AND SPECIFICATIONS APPROVED BY THE TRANSITION - RECTANGULAR TO RECT- <br /> 6. DUCT CONSTRUCTION SEALANT: PROVIDE MASTIC OR TAPE DUCT JOINT SEALANT. -� IRVINE, CA 92614 <br /> 4. THE OPAQUE PORTIONS OF FRAMED DEMISING WALLS IN NON-RESIDENTIAL BUILDINGS SHALL HAVE LOCAL ENFORCEMENT AGENCY. 7. ALL DUCTWORK IN STUDWALLS TO BE ISOLATED WITH 1/4" FELT IN THE DUCT SUPPORTS AND ANGULAR TEL: (949)475-0146 <br /> INSULATION WITH AN INSTALLED R-VALUE OF NO LESS THAN R-13 BETWEEN FRAMING MEMBERS C. STATE THE NUMBER OF THE BUILDING PERMIT UNDER WHICH CONSTRUCTION OR INSTALLATION / <br /> (SEC. 110.8 (f)). WAS PERFORMED. WHERE IT MAKES CONTACT WITH THE BUILDING CONSTRUCTION. INSTALL ONE DUCT ONLY IN EACH �Do 0 TRANSITION - RECTANGULAR TO ROUND FAX:(949)475-0137 <br /> 5. ALL INSULATING MATERIAL SHALL BE INSTALLED IN COMPLIANCE WITH THE FLAMESPREAD RATING 2. AFTER INSTALLING WALL, CEILING, OR FLOOR INSULATION, THE INSTALLER SHALL MAKE AVAILABLE STUD SPACE. <br /> 8. ALL DUCT DIMENSIONS ARE CLEAR INSIDE. ALL DUCTS SHALL BE FIRMLY SUPPORTED OR HUNG ELBOW W/ <br /> TURNING VANE <br /> AND SMOKE DENSITY REQUIREMENTS OF THE CBG (SEC. 110.8). TO THE ENFORCEMENT AGENCY OR POST IN A CONSPICUOUS LOCATION IN THE BUILDING A <br /> 6. HEAT PUMPS WITH SUPPLEMENTARY ELECTRIC RESISTANCE SHALL HAVE CONTROLS: CERTIFICATE SIGNED BY THE INSTALLER STATING THAT THE INSTALLATION IS CONSISTENT WITH THE AND NEATLY ALIGNED AND INSTALLED. SPACE HANGERS AS REQUIRED TO SUPPORT THE DUCTS _ THESE DRAWINGS AND SPECIFICATIONS AND IDEAS, DESIGNS AND <br /> WITHOUT SAGGING AS REQUIRED BY THE BUILDING FRAMEWORK, AND AS REQUIRED BY OTHER 6X6LLINED DUCT, DUCT SIZE WITH L FOR ARRANGEMENTS REPRESENTED THEREBY ARE AND SHALL REMAIN <br /> A. THAT PREVENT SUPPLEMENTARY HEATER OPERATION WHEN THE HEATING LOAD CAN BE MET PLANS AND SPECIFICATIONS DESCRIBED IN SECTION 10-103(a)2A. THE CERTIFICATE SHALL ALSO INTERFERENCE. LOCATION AND SPACING OF HANGERS AND SUPPORTS SHALL BE COORDINATED BY - � (L) SINGLE LINE THE PROPERTY OF GARY WANG & ASSOCIATES; AND NO PART <br /> BY THE HEAT PUMP ALONE; AND STATE THE MANUFACTURERS NAME, MATERIAL IDENTIFICATION, AND THE INSTALLED R-VALUE. (SEC. THE CONTRACTOR. FURNISH AND INSTALL NECESSARY SUPPORTING MATERIAL AND ADDITIONAL THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR USED IN <br /> B. IN WHICH THE CUT-ON TEMPERATURE FOR COMPRESSION HEATING IS HIGHER THAN THE 10-103 (a) 4. STRUCTURAL MEMBERS. SEAL OPEN SPACE BETWEEN DUCTS & WALL COORDINATE DUCTWORK I RISE IN DIRECTION OF AIRFLOW CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE <br /> CUT-ON TEMPERATURE FOR SUPPLEMENTARY HEATING, AND THE CUT-OFF TEMPERATURE FOR SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN PREPARED AND <br /> COMPRESSION HEATING IS HIGHER THAN THE CUT-OFF TEMPERATURE FOR SUPPLEMENTARY 3. THE APPLICANT SHALL FILE ALL CERTIFICATE(S) OF ACCEPTANCE, REQUIRED BY THE MECH-I-C, WITH THE LIGHTING FIXTURES, CEILING SUPPORT SYSTEM, AND ACCESS DOORS ETC. DEVELOPED WITHOUT THE WRITTEN CONSENT OF GARY WANG & <br /> WITH THE ENFORCEMENT AGENCY PRIOR TO RECIEVING A FINAL OCCUPANCY PERMIT. THE 9. CONTRACTOR TO CHECK ARCHITECTURAL REFLECTED CEILING PLAN FOR CEILING DIFFUSER, D DROP IN DIRECTION OF AIRFLOW ASSOCIATES. VISUAL CONTACT WITH THESE DRAWINGS AND <br /> HEATING. (SEC. 110.2 (b)). RETURN AIR REGISTER & CEILING EQUIPMENT ETC. i SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF <br /> 7. THE LESSER OF THE MINIMUM RATE OF OUTDOOR AIR REQUIRED BY SECTION 120.1 b 2, OR SIGNER(S) SHALL BE ELIGIBLE UNDER DIVISION 3 OF THE BUSINESS AND PROFESSIONS CODE TO THESE RESTRICTIONS. WRITTEN DIMENSIONS ON THESE DRAWINGS <br /> ( ) SIGN SUCH DOCUMENTS. 10. ALL EXTERIOR LOUVERS AND DOOR LOUVERS SHALL BE PROVIDED BY MECHANICAL CONTRACTOR. 3 FLEXIBLE DUCT SHALL HAVE PRECEDENCE OVER SCALED DIMENSIONS; <br /> THREE COMPLETE AIR CHANGES SHALL BE SUPPLIED TO THE ENTIRE BUILDING DURING THE TIMER, TIME CLOCK & CONDUIT BY ELECTRICAL CONTRACTOR. CONTRACTORS SHALL VERIFY, AND BE RESPONSIBLE FOR ALL <br /> ONE-HOUR PERIOD IMMEDIATELY BEFORE THE BLDG. IS NORMALLY OCCUPIED (SECTION 120.1(c)2). <br /> 4. THE BUILDER SHALL PROVIDE THE BUILDING OWNER OR THE PERSON11. INSTALL MANUAL BALANCING DAMPERS IN ALL BRANCH DUCT RUNS TO INDIVIDUAL DIFFUSERS <br /> S) RESPONSIBLE FOR DIMENSIONS AND CONDITIONS ON THE JOB, AND THIS OFFICE <br /> BUILDING MAINTENANCE (IN CASE OF MULTI-TENANT OR CENTRALLY OPERATED BUILDINGS) AT 0 THERMOSTAT, +44 A.F.F. MUST BE NOTIFIED OF ANY VARIATIONS FROM THE DIMENSIONS <br /> OCCUPANCY THE FOLLOWING: <br /> 8. ALL AIR DISTRIBUTION SYSTEM DUCTS AND PLENUMS, INCLUDING BUT NOT LIMITED TO, BUILDING AND AS REQUIRED TO CONTROL AIRFLOW FOR SYSTEM BALANCING. AND CONDITIONS SHOWN BY THESE DRAWINGS. SHOP DETAIL MUST <br /> 12. INSTALL ACOUSTIC LINING IN DUCTWORK FOR 10 FEET ON EACH SIDE OF FAN SUPPLY RETURN <br /> CAVITIES, MECHANICAL CLOSETS, AIR-HANDLER BOXES AND SUPPORT PLATFORMS USED AS DUCTS BE SUBMITTED TO THIS OFFICE FOR REVIEW BEFORE PROCEEDING <br /> OR PLENUMS, SHALL BE INSTALLED, SEALED AND INSULATED TO MEET THE REQUIREMENTS OF THE A. OPERATING INFO. A LIST OF THE HEATING, COOLING, WATER HEATING, AND LIGHTING SYSTEMS ( / ) ® SUPPLY AIR DUCT - SECTION WITH THE FABRICATION. <br /> & FEATURES, MATERIALS, COMPONENTS, AND MECHANICAL DEVICES, CONSERVATION OR SOLAR 13. PROVIDE BACKDRAFT DAMPERS AND BIRDSCREENS ON EACH DUCT FROM INTERIOR SPACES TO <br /> 2003 CMC AND SMACNA HVAC DUCT CONSTRUCTION STANDARDS. SUPPLY AIR AND RETURN AIR DEVICES INSTALLED IN THE BUILDING, AND INSTRUCTIONS ON HOW TO USE THEM EFFICIENTLY. THE OUTSIDE UNLESS PROHIBITED BY CODE. RETURN, EXHAUST, OR OUTSIDE AIR DUCT <br /> DUCTS CONVEYING HEATED OR COOLED AIR SHALL BE INSULATED TO A MINIMUM INSTALLED LEVEL B. MAINTENANCE INFORMATION. REQUIRED ROUTINE MAINTENANCE ACTION SHALL BE CLEARLY 14. PROVIDE ACESS PANELS FOR ALL EQUIPMENT CONCEALLED IN ACCESSIBLE SPACES. COORDINATE ® -SECTION ARCHITECT <br /> OF R-8, UNLESS DUCTS ARE IN CONDITIONED SPACE. (SEC. 120.4 (a)). STATED AND INCORPORATED ON A READILY ACCESSIBLE LABEL. THE LABEL MAY BE LIMITED TO SIZE AND LOCATION WITH ARCHITECT. 0 <br /> 9. THE THERMOSTATIC CONTROLS FOR HVAC SYSTEMS SHALL MEET THE FOLLOWING REQUIREMENTS IDENTIFYING THE MAINTENANCE MANUAL. 15. CONTRACTOR TO INSTALL APPROVED AUTOMATIC FIRE DAMPERS IN ALL DUCT, DIFFUSERS, GRILLS, ROUND DUCT OR STACK - SECTION <br /> AS APPLICABLE: C. VENTILATION INFORMATION. A DESCRIPTION OF THE QUANTITIES OF OUTDOOR AND RECIRCULATED TC. WHERE PENETRATING RATED WALLS, FLOORS, AND CEILING ASSEMBLIES. IN FIRE RATED <br /> A ONTROEACH LACE THAT CONDITIONING <br /> ONDS TO TEMPERATURE WITHINTHE BY AN ZONE ANDDMEETSLTHEERMOSTATICAPPLICABLE AIR THAT THE VENTILATION SYSTEM IS DESIGNED TO PROVIDE TO EACH AREA. 16. A�L CIDOR SHALL ONDENSATE INSTALL <br /> DRA NS SHALBINBEIO RAPFIRE <br /> PEDAND <br /> ANDSMOKE <br /> PIPED TOMTHE APPROVEDER AS REQUIRED <br /> RE RECEPTOR. DRAIN ~® 12"X 12" NECK PERFORATED CEILING REGISTER GARY WANG <br /> 5. FOR BUILDINGS THAT HAVE USED A COMPLIANCE OPTION THAT REQUIRES FIELD VERIFICATION AND <br /> REQUIREMENTS OF SECTION (B). DIAGNOSTIC TESTING, THE BUILDING DEPARTMENT SHALL NOT APPROVE THE BUILDING UNTIL THE SHALL SLOPE AT NOT LESS THAN 1/8" PER FOOT (11%). CONDENSATE LINES TO DRAIN TO SPACE 6"X 6" PERFORATED CEILING REGISTER &ASSOCIATES, INC. <br /> B. EACH THERMOSTATIC CONTROL REQUIRED BY SECTION (A) SHALL BE CAPABLE OF BEING BUILDING DEPARTMENT HAS RECEIVED A CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC AND NOT UNTO ROOF. a <br /> SET, LOCALLY OR REMOTELY BY ADJUSTMENT OR SELECTION OF SENSORS TO CONTROL; TESTING THAT HAS BEEN SIGNED AND DATED BY THE HERS RATER. 17. ALL A/C CONDENSATE LINES TO BE INSTALLED BY PLUMBING CONTRACTOR. REFER TO PLUMBING SD SD DUCT MOUNTED SMOKE DETECTOR <br /> 1. COMFORT HEATING DOWN TO 55 DEG. F OR LOWER 6. WITHIN 90 DAYS AFTER ISSUANCE OF CERTIFICATE OF OCCUPANCY RECORD DRAWINGS SHALL DRAWINGS FOR LOCATION OF CONDENSATE LINES. TO SHUT-OFF FAN 1000 Corporate Center Dr., Suite 550 <br /> 2. COMFORT COOLING UP TO 85 DEG. F OR HIGHER BE PROVIDED TO THE OWNER. IF A BUILDING DESIGN FEATURE, MATERIAL, COMPONENT OR 18. ALL MECHANICAL EQUIPMENT SHALL BE LABELED TO THE SPACE SERVED AS REQUIRED BY SFD COMBINATION SMOKE & FIRE DAMPER Monterey Park, CA 91754 <br /> 3. BOTH HEATING AND COOLING, THE THERMOSTATIC CONTROLS SHALL BE CAPABLE OF MANUFACTURED DEVICE IS CHANGED BEFORE FINAL CONSTRUCTION AND INSTALLATION, SUCH SECTION 303.6 OF 2016 CMC. TEL: (626)288-6898 FAX: (626)768-7101 <br /> PROVIDING A TEMPERATURE RANGE OR DEAD BAND OF AT LEAST 5 DEGREES F WITHIN THAT THE BUILDING MAY NO LONGER COMPLY WITH PART 6, THE BUILDING MUST BE BROUGHT 19. A 120-VOLT RECEPTACLE SHALL BE LOCATED WITHIN 25 FEET OF THE EQUIPMENT FOR SERVICE MVDhttp://www.garywang.com <br /> WHICH THE SUPPLY OF HEATING AND COOLING ENERGY TO THE ZONE IS SHUT OFF OR INTO COMPLIANCE, AND SO INDICATED ON AMENDED PLANS AND CERTIFICATE OF AND MAINTENANCE PURPOSES. 301.4 2016 CMC. MANUAL VOLUME DAMPER <br /> REDUCED TO A MINIMUM. (SEC. 120.2 (a) & (b). COMPLIANCE(S) THAT SHALL BE SUBMITTED FOR APPROVAL. 20. EXHAUST OUTLETS SHALL TERMINATE IN ACCORDANCE WITH THE REQUIREMENTS OF CMC CHAPTER <br /> 10. OUTDOOR AIR SUPPLY AND EXHAUST EQUIPMENT SHALL BE INSTALLED WITH DAMPERS THAT 6. AND 10'-0" ABOVE GRADE. (E) EXISTING <br /> AUT11. EACOHMSPACELY CLOSE UPON FAN CONDITIO CONDITIONING SYSTEMHSHALDLOBE INSTALLED WITSEC. 102.2 Hf)CONTROLS THAT COMPLY WITH THE CALIFORNIA GREEN BUILDING STANDARDS CODE 21 EO HAUDT FIANUTSIE ARINISCHARGE OR PLUMBIINTAKE SHALL BE 'GAWAY OR 3'-0" BELOW ANY APPLIANCE VENT OUTLET OR (N) NEW STAMP <br /> FOLLOWING: 22. FILTERS ON RETURN AIR PLENUM SHALL BE FARR 30/30 OR EQUAL. <br /> A. ARE CAPABLE OF AUTOMATICALLY SHUTTING OFF THE SYSTEM DURING PERIODS OF NON-USE 1. THE PERMANENT HV AC SYSTEM SHALL ONLY BE USED DURING CONSTRUCTION IF NECESSARY TO 23. CONTRACTOR SHALL PROVIDE VIBRATION ISOLATION DEVICE FOR ALL MECHANICAL EQUIPMENTS AS POC POINT OF CONNECTION <br /> AND SHALL HAVE: CONDITION THE BUILDING OR AREAS OF ADDITION OR ALTERATION WITHIN THE REQUIRED ACOUSTIC CONTROL. <br /> 1. AN AUTOMATIC TIME SWITCH CONTROL DEVICE COMPLYING WITH SECTION 110.9, WITH AN <br /> ACCESSIBLE MANUAL OVERRIDE THAT ALLOWS OPERATION OF THE SYSTEM FOR UP TO TEMPERATURE RANGE FOR MATERIAL AND EQUIPMENT INSTALLATION. IF THE HVAC SYSTEM IS USED 24. CONTRACTOR SHALL INSTALL THE EQUIPMENT OR SYSTEM PER MANUFACTURERS INSTALLATION DURING CONSTRUCTIONUSE RETURN AIR FILTERS WITH A MINIMUM EFFICIENCY REPORTING VALUE RECOMMENDATION. CONSULT WITH MANUFACTURING COMPANY IF NECESSARY. DIFFUSERS, GRILLES & REGISTERS SEo ARC <br /> , <br /> FOUR HOURS; OR 25. ALL THERMOSTATS SHALL BE INSTALLED APPROXIMATELY 4 FT ABOVE FINISHED FLOOR. VERIFY <br /> 2. AN OCCUPANCY SENSOR; OR y� <br /> (MERV) OF 8, BASED ON ASHRAE 52.2-1999, OR AN AVERAGE EFFICIENCY OF 30 PERCENT <br /> BASED ON ASHRAE 52.1-1992. REPLACE ALL FILTERS IMMEDIATELY PRIOR TO OCCUPANCY, OR, IF LOCATION WITH ARCHITECT. . c, <br /> 3. A FOUR-HOUR TIMER THAT CAN BE MANUALLY OPERATED. 26. TEST & BALANCE ALL SYSTEMS ACCORDING TO CFM INDICATED ON PLANS. PROVIDE OWNER WITH <br /> EXCEPTION: MECHANICAL SYSTEMS SERVING RETAIL STORES AND ASSOCIATED MALLS, RESTURANTS, THE BUILDING IS OCCUPIED DURING ALTERATION, AT THE CONCLUSION OF CONSTRUCTION. (CGBC AIR SUPPLY DIFFUSER SCHEDULE <br /> GROCERY STORES, CHURCHES AND THEATERS EQUIPPED WITH 7-DAY PROGRAMMABLE TIMERS. SECTION: 5.504.1) A COPY OF AIR BALANCE REPORT. * No' 032569 <br /> 27. PROVIDE AIR BALANCE REPORT TO VERIFY THE PROPER AMOUNT OF OUTSIDE AIR TO COMPLY REN.D4-30-2019 <br /> B. AUTOMATICALLY RESTART AND TEMPORARILY OPERATE THE SYSTEM AS REQUIRED TO MAINTAIN: 2. AT THE TIME OF ROUGH INSTALLATION AND DURING STORAGE ON THE CONSTRUCTION SITE UNTIL MARK ROUND DUCT DIFF. <br /> 1. A SETBACK HEATING THERMOSTAT SETPOINT, IF THE SYSTEM PROVIDES MECHANICAL HEATING; WITH THE TITLE 24 CALCULATIONS, BEFORE THE APPROVAL OF THIS PROJECT. DESCRIPTION NECK FACE CFM MAX �j �Q <br /> FINAL STARTUP OF THE HEATING, COOLING AND VENTILATING EQUIPMENT, ALL DUCT AND OTHER OR CONNECTION OR y <br /> EXCEPTION: AREA WITH THE DESIGN WINTER OUTDOOR TEMPERATURE OF GREATER THAN 327. RELATED AIR DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED WITH TAPE, PLASTIC, 28. ALL MECHANICAL EQUIPMENT SHALL BE BRACED OR ANCHORED TO RESIST A HORIZONTAL FORCE © & Q SIZE DIMENSION RANGE NC 4 <br /> SHEETMETAL OR OTHER METHODS ACCEPTABLE TO THE ENFORCING AGENCY TO REDUCE THE * ANY DIRECTION T FOLLOWS SYMBOL EQUIV. RECT. DUCT F� <br /> 2. A SETUP COOLING THERMOSTAT SETPOINT, IF THE SYSTEM PROVIDES MECHANICAL COOLING. * FIXED EQUIPMENT ON GRADE - 22% OF OPERATING WEIGHT OF CA <br /> EXCEPTION: AREA WITH THE DESIGN SUMMER OUTDOOR TEMPERATURE OF LESS THAN 100'F. AMOUNT OF DUST, WATER AND DEBRIS WHICH MAY ENTER THE SYSTEM. (CGBC SECTION: 5.504.3) * FIXED EQUIPMENT ON STRUCTURE - 33% OF OPERATING WEIGHT ®~ w �-� <br /> Z 6 X 6 UP TO 125 20 8" DIA. <br /> C. MULTIPURPOSE ROOM LESS THAN 1000 SQ/FT, CLASSROOMS GREATER THE 750 SQ/FT, AND 3. IN MECHANICALLY VENTILATED BUILDINGS, PROVIDE REGULARLY OCCUPIED AREAS OF THE BUILDING * FOR FLEXIBILITY MOUNTED EQUIPMENT USE 2 TIMES THE ABOVE VALUES 1-WAY BLOW o 0 z � <br /> X o <br /> CONFERENCE, CONVENTION, AUDITORIUM AND MEETING CENTER ROOMS GREATER THAN 750 WITH AIR FILTRATION MEDIA FOR OUTSIDE AND RETURN AIR THAT PROVIDES AT LEAST A MINIMUM * FOR SIMULTANEOUS VERTICAL FORCES - USE 1/3 TIMES THE HORIZONTAL FORCE. 0° D 8 X 8 N vz 126 - 200 20 9" DIA. <br /> FT THAT DO NOT HAVE PROCESSES OR OPERATIONS THAT GENERATE DUSTS, FUMES, <br /> SQ EFFICIENCY REPORTING VALUE (MERV) OF 8. MERV 8 FILTERS SHALL BE INSTALLED PRIOR TO _®~ = o a u a <br /> / REFER TO STRUCTURAL PLANS FOR EQUIPMENT ANCHORAGE TO STRUCTURE. m a W <br /> VAPORS OR GASES SHALL BE EQUIPPED WITH OCCUPANT SENSORS, TO ACCOMPLISH THE OCCUPANCY, AND RECOMMENDATIONS FOR MAINTENANCE WITH FILTERS OF THE SAME VALUE SHALL 2-WAY BLOW 3 _j N a „ <br /> 29. MATERIALS EXPOSED WITHIN DUCTS OR PLENUMS SHALL HAVE AFLAME-SPREAD INDEX OF NOT = a 10 X 10 0 201 - 300 20 12 DIA. <br /> FOLLOWING DURING UNOCCUPIED PERIODS: BE INCLUDED IN THE OPERATION AND MAINTENANCE MANUAL. (CGBC SECTION: 5.504.5.3) MORE THAN 25 AND A SMOKE-DEVELOPED RATING OF NOT MORE THAN 50 WHEN TESTED IN 1 ? a " PROJECT NAME/ADDRESS: <br /> 1. AUTOMATICALLY SETUP THE OPERATING COOLING TEMPERATURE SET POINT BY 2'F OR MORE 4. LABELING. INSTALLED FILTERS SHALL BE CLEARLY LABELED BY THE MANUFACTURER INDICATING THE ACCORDANCE WITH ASTM E84 OR UL 723. 2016 CMC 602.2. ®~ a w w z o + <br /> AND SETBACK THE OPERATING HEATING TEMPERATURE SET POINT BY 2'F OR MORE; AND MERV RATING. (CGBC SECTION: 5.504.5.3.1) 30. FLEXIBLE DUCT SHALL BE USED FOR TAKE-OFF AND LIMITED TO 6'-0". w o 12 X 12 0 m N 301 - 450 20 14 DIA. <br /> 3-WAY BLOW o ,� i � m o <br /> 2. AUTOMATICALLY RESET THE MINIMUM REQUIRED VENTILATION RATE WITH AN OCCUPANT 5. WHERE OUTDOOR AREAS ARE PROVIDED FOR SMOKING, PROHIBIT SMOKING WITHIN 25 FEET OF 31. SMOKE DETECTOR SHALL BE LABELED BY AN APPROVED AGENCY APPROVED AND LISTED BY THE o w= JUICE IT U P. <br /> f m ►� 16 X 16 v�' Y 451 - 700 20 16 DIA. <br /> SENSOR VENTILATION CONTROL DEVICE ACCORDING TO SECTION 120.1(c)5. BUILDING ENTRIES, OUTDOOR AIR INTAKES AND OPERABLE WINDOWS AND WITHIN THE BUILDING AS CALIFORNIA STATE FIRE MARSHAL FOR AIR DUCT INSTALLATION AND SHALL BE INSTALLED IN V) w ? D 1 V) w <br /> EXCEPTION TO SECTIONS 120.2(e)3:. IF DEMAND CONTROL VENTILATION IS IMPLEMENTED AS ALREADY PROHIBITED BY OTHER LAWS OR REGULATIONS; OR AS ENFORCED BY ORDINANCES, ACCORDANCE WITH THE MFR'S APPROVED INSTALLATION INSTRUCTIONS. 2016 CMC 608.1. ~®1 ~ C a } X% Z RIPON TOWN SQUARE <br /> REQUIRED BY SECTION 120.1(c)3 AND 120.1(4). (SEC. 120.2 (e)) REGULATIONS OR POLICIES OF ANY CITY, COUNTY, CITY AND COUNTY, CALIFORNIA COMMUNITY 32. AIR HANDLING DUCT SYSTEMS, EXCEPT GREASE EXHAUST DUCT SYSTEM, SHALL BE CONSTRUCTED, 4-WAY BLOW ~ g 18 X 18 a cn? I� 701 - 900 25 18 DIA. <br /> 12. ALL PIPING AND DUCTWORK SHALL BE INSULATED CONSISTENT WITH THE REQUIREMENTS OF COLLEGE, CAMPUS OF THE CALIFORNIA STATE UNIVERSITY, OR CAMPUS OF THE UNIVERSITY OF INSTALLED AND INSULATED AS PROVIDED IN CHAPTER 6 OF 2016 CMC. <br /> SECTIONS 120.3, 120.4 AND 120.7, TITLE 24 ENERGY STANDARDS AND CHAPTER 6 OF CMC. CALIFORNIA, WHICHEVER ARE MORE STRINGENT. WHEN ORDINANCES, REGULATIONS OR POLICIES ARE 33. A 7-DAY, 24-HOUR TIME CLOCK OR A PROGRAMMABLE THERMOSTAT SHALL BE PROVIDED ON RETURN & EXHAUST DIFFUSER SCHEDULE 1201 W. MAIN ST., <br /> 13. ALL HVAC EQUIPMENT AND APPLIANCES SHALL MEET THE CONTROL REQUIREMENTS PER SECTION NOT IN PLACE, POST SIGNAGE TO INFORM BUILDING OCCUPANTS OF THE PROHIBITIONS. (CGBC HVAC UNIT THAT AUTOMATICALLY SHUT DOWN DURING PERIODS OF NON-USE. THERMOSTAT SHALL RIPON, CA 95366 <br /> 110.2 AND 120.2. SECTION: 5.504.7) BE MOUNTED BETWEEN 3 AND 4 FT. ABOVE FINISHED FLOOR 6 X 6 z UP TO 100 15 6" DIA. <br /> 14. ALL HVAC EQUIPMENT AND APPLIANCES SHALL MEET THE REQUIREMENTS PER SECTION 6. FOR MECHANICALLY OR NATURALLY VENTILATED SPACES IN BUILDINGS, MEET THE MINIMUM 34. PRIOR TO FINAL APPROVAL OF THE MECHANICAL PERMIT, A SMOKE DETECTOR SHUT-OFF TEST Z X o <br /> 110.1-110.3, 110.5, 120.1-120.4 TITLE 24 ENERGY STANDARDS. REQUIREMENTS OF SECTION 120.1 (REQUIREMENTS FOR VENTILATION) OF THE 2016 CALIFORNIA SHALL BE REQUIRED. v a N <br /> W 8 X 8 N U 0 101 - 200 15 9 DIA. <br /> ENERGY CODE, OR THE APPLICABLE LOCAL CODE, WHICHEVER IS MORE STRINGENT, AND DIVISION 35. ONLY CO2 SENSORS THAT DIRECTLY TRACK THE CO2 LEVEL IN THE BREATHING ZONE ARE L5 x =I? <br /> 1, CHAPTER 4 OF CCR, TITLE 8. (CGBC SECTION: 5.506.1) PERMITTED BY CEC FOR USE IN THE DEMAND CONTROLLED VENTILATION REQUIREMENT FOR T-24 ir �j o 11 a w REVISIONS: <br /> AIR CONDITIONING SYSTEM COMPLIANCE 7. FOR BUILDINGS OR ADDITIONS EQUIPPED WITH DEMAND CONTROL VENTILATION, CO2 SENSORS AND COMPLIANCE. RETURN Uj 10 X 10 V) ate= 201 - 300 15 12" DIA. <br /> VENTILATION CONTROLS SHALL BE SPECIFIED AND INSTALLED IN ACCORDANCE WITH THE 36. THE CO2 SENSOR MUST BE FACTORY CERTIFIED TO HAVE AN ACCURACY WITHIN +/- 75PPM AT <br /> REQUIREMENTS OF 2016 CALIFORNIA ENERGY CODE, SECTION 120(C)(4). (CGBC SECTION: 5.506.2) 600 AND 1000 PPM CONCENTRATION WHEN MEASURED AT SEA LEVEL AT 25'c (77'F) FACTORY w 0 12 X 12 v >m w 301 - 500 20 14" DIA. - <br /> 1. AIR DISTRIBUTION SYSTEMS THAT ARE CONNECTED TO A CONSTANT VOLUME, SINGLE ZONE HVAC 8. INSTALLATIONS OF HVAC, REFRIGERATION AND FIRE SUPPRESSION EQUIPMENT SHALL COMPLY WITH CALIBRATED OR CALIBRATED AT START-UP AND CERTIFIED BY THE MANUFACTURER TO REQUIRE _ m a m m v <br /> SYSTEM; SERVING LESS THAN 5,000 SQUARE FEET OF FLOOR AREA; AND HAVING MORE THAN 25% CGBC SECTIONS 5.508.1.1 AND 5.508.1.2. HVAC, REFRIGERATION AND FIRE SUPPRESSION CALIBRATION NO MORE FREQUENTLY THAN ONCE EVERY 5 YEARS. o w cn 15 X 15 " n Y 501 - 700 20 16" DIA. <br /> OF THE DUCT SURFACE AREA LOCATED OUTSIDE OR IN UNCONDITIONED SPACES SHALL HAVE THE EQUIPMENT SHALL NOT CONTAIN CHLOROFLUOROCARBONS (CFCs) AND SHALL NOT CONTAIN 37. ACCESS DOORS: WHERE NECESSARY IN DUCTWORK OR CASINGS, SUITABLE ACCESS DOORS AND wa. o D ��w _ <br /> DUCT LEAKAGE RATE CONFIRMED TO COMPLY WITH SEC. 140.4(L) THROUGH FIELD VERIFICATION HALONS. (CGBC SECTION: 5.508.1) FRAMES TO PERMIT INSPECTION, OPERATION AND MAINTENANCE OF ALL CONTROLS, MOTOR �`' 18 X 18 D Z 801 - 1000 25 20" DIA. <br /> AND DIAGNOSTIC TESTING BY HERS RATER. 9. DEVELOP A WRITTEN PLAN OF PROCEDURES FOR TESTING AND ADJUSTING SYSTEMS. SYSTEMS TO BEARINGS, OR OTHER APPARATUS CONCEALED BEHIND THE SHEET METAL WORK SHALL BE EXHAUST a cn- u © _ <br /> 2. DUCT SYSTEMS USED WITH BLOWER TYPE EQUIPMENT WHICH ARE PORTIONS OF A HEATING, BE INCLUDED FOR TESTING AND ADJUSTING SHALL INCLUDE: PROVIDED. ACCESS DOORS IN DUCTS MAY BE OF SINGLE PANEL CONSTRUCTION OF NOT LESS 22 X 22 1000 - 1500 25 24" DIA. B - <br /> COOLING, ABSORPTION, EVAPORATIVE COOLING OR OUTDOOR AIR VENTILATION SYSTEM SHALL BE 1. HVAC SYSTEMS AND CONTROLS. THAN NO. 18 GAUGE, GALVANIZED, AND SHALL HAVE SPONGE RUBBER GASKETS WITH HINGES <br /> SIZED IN ACCORDANCE WITH CHAPTER 17 OF THE CALIFORNIA MECHANICAL CODE. 2. WATER HEATING SYSTEM. (CGBC SECTION: 5.410.4.2) AND LATCHES. NOTES: <br /> 3. AIR-MOVING SYSTEMS SUPPLYING AIR IN EXCESS OF 2000 CFM SHALL BE EQUIPPED WITH AN 38. PERMANENT ACCESS TO ALL EQUIPMENT INCLUDING FIRE DAMPERS & SMOKE FIRE DAMPERS <br /> 10. PERFORM TESTING AND ADJUSTING PROCEDURES IN ACCORDANCE WITH MANUFACTURERS 1Q T-BAR CEILING DIFFUSERS SHALL BE 24"x 24 PERFORATED FACE DIFFUSERS WITH FOUR (4) ISSUE DATE: <br /> AUTOMATIC SHUTOFF ACTIVATED BY SMOKE DETECTOR LOCATED IN THE MAIN SUPPLY AIR DUCT. A SHALL BE PROVIDED. <br /> SYSTEM MAY INCLUDE MORE THAN ONE PIECE OF AC UNIT, WHICH SERVE A COMMON SPACE WITH SPECIFICATIONS AND APPLICABLE STANDARDS ON EACH SYSTEM. (CGBC SECTION: 5.410.4.3) 39. EQUIPMENT SHALL BE SECURELY FASTENED TO VIBRATION ISOLATORS AND EARTHQUAKE 2Q DIRECTIONAL (FULLY ADJUSTABLE) AIR PATTERN MODULAR CORES W/ EQUAL AIR FLOW IN ALL 1ST - <br /> AGGREGATE AIR OF MORE THAN 2000 CFM. 11. IN ADDITION TO TESTING AND ADJUSTING, BEFORE A NEW SPACE-CONDITIONING SYSTEM SERVING RESTRAINTS PER BUILDING CODE REQUIREMENTS. FOUR DIRECTIONS. <br /> A BUILDING OR SPACE IS OPERATED FOR NORMAL USE, BALANCE THE SYSTEM IN ACCORDANCE 40. ALL APPLIANCES DESIGNED TO BE FIXED IN POSITION SHALL BE SECURELY FASTENED IN PLACE ® ALL RETURN AIR REGISTERS SHALL HAVE OUTER BLADES PARALLEL TO THE LONG DIMENSION. 2ND - <br /> WITH THE PROCEDURES DEFINED BY THE TESTING ADJUSTING AND BALANCING BUREAU NATIONAL IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. SUPPORT FOR IN DUCTED APPS, ALL VOLUME DAMPERS SHALL BE MNTD A MINIMUM 6' AWAY FOR REGISTERS. 3RD - <br /> STANDARDS; THE NATIONAL ENVIRONMENTAL BALANCING BUREAU PROCEDURAL STANDARDS; APPLIANCES SHALL BE DESIGNED AND CONSTRUCTED TO SUSTAIN VERTICAL AND HORIZONTAL 4TH - <br /> ASSOCIATED AIR BALANCE COUNCIL NATIONAL STANDARDS OR AS APPROVED BY THE ENFORCING LOADS WITHIN THE STRESS LIMITATIONS SPECIFIED IN THE BUILDING CODE. 5TH <br /> AGENCY. (CGBC SECTION: 5.410.4.3.1) 41. VENTILATING SYSTEM SHALL BE BALANCED IN ACCORDANCE WITH ONE OF THE FOLLOWING MECHANICAL EQUIPMENT SCHEDULE <br /> 12. AFTER COMPLETION OF TESTING, ADJUSTING AND BALANCING, PROVIDE A FINAL REPORT OF 6TH <br /> TESTING SIGNED BY THE INDIVIDUAL RESPONSIBLE FOR PERFORMING THESE SERVICES. CGBC METHODS IN ACCORDANCE WITH 2016 CMC 314.1 REQUIREMENTS: AABC, ACCA, ASHRAE 1 11, <br /> ( NEBB AND SMACNA. ITEM DESCRIPTION <br /> SECTION: 5.410.4.4) 42. THE REQUIRED SERVICE DISTANCE FROM MECHANICAL EQUIPMENT TO SCREENING, PARAPETS, <br /> 13. PROVIDE THE BUILDING OWNER OR REPRESENTATIVE WITH DETAILED OPERATING AND MAINTENANCE WALLS AND OTHER EQUIPMENT SHALL BE A MINIMUM OF 30"x30" ON THE SERVICE SIDE OF THE PACKAGE ROOFTOP UNIT (HEAT PUMP) JOB NUMBER <br /> INSTRUCTIONS AND COPIES OF GUARANTIES/WARRANTIES FOR EACH SYSTEM. 0 & M INSTRUCTIONS EQUIPMENT, OR AS REQUIRED BY THE MANUFACTURER'S INSTALLATION INSTRUCTIONS, IF THE HP TRANE MODEL WHC060H3R, SEER 16.4; 13 EER <br /> SHALL BE CONSISTENT WITH OSHA REQUIREMENTS IN CCR, TITLE 8, SECTION 5142, AND OTHER INSTRUCTIONS REQUIRE GREATER CLEARANCE. TOTAL COOLING CAP: 55,7800 BTUH, (5 TON) <br /> RELATED REGULATIONS. (CGBC SECTION: 5.410.4.5) 43. THE COOKING APPLIANCES SHALL BE INSTALLED IN ACCORDANCE WITH ALL REQUIREMENTS OF 1 HEATING CAP: 37,060 BTUH OUTPUT, HSPF 9 ARCH PROJECT#: 18-287 <br /> 14. INCLUDE A COPY OF ALL INSPECTION VERIFICATIONS AND REPORTS REQUIRED BY THE ENFORCING THE MANUFACTURER'S LISTING AND INSTALLATION INSTRUCTIONS. MOVEMENT OF APPLIANCES WITH AIR FLOW (CFM): 2,000 CFM ® 0.5" ESP, MIN. O.S.A.= 450 CFM <br /> AGENCY. (CGBC SECTION: 5.410.4.5.1) CASTERS SHALL BE LIMITED BY A RESTRAINING DEVICE INSTALLED IN ACCORDANCE WITH ELECTRIC: 208V-30-60, MCA=32, MOP=45 <br /> CONNECTOR AND APPLIANCE MANUFACTURERS INSTRUCTIONS. OPERATING WT: 1067 LBS. <br /> WITH SMOKE DETECTOR, PROGRAMMABLE DIGITAL THERMOSTAT, INTEGRATED LOW LEAK <br /> ADDITIONAL NOTE 44. EXHAUST DUCTS SHALL BE EQUIPPED WITH BACKDRAFT DAMPERS PER SEC. 504.0 2016 CMC. ECONOMIZER WITH BAROMETRIC RELIEF AND CONTROLS, ECONOMIZER FAULT DETECTION DRAWN BY CHECKED BY <br /> 45. PROVIDE SMOKE DETECTORS IN MAIN SUPPLY AIR DUCTS OF AIR MOVING SYSTEMS EXCEEDING <br /> 2000 CFM PER SECTION 608.0 2016 CMC. AND DIAGNOSTICS (FDD) SYSTEM, CO2 SENSOR KIT FOR DEMAND CONTROL VENTILATION, JR ADR <br /> 1. AS-GUILTS: CONTRACTOR SHALL PROVIDE A COMPLETE SET OF AS-BUILT FULL SIZE BLACK-LINE 46. ALL MECHANICAL EQUIPMENT AND SYSTEMS INSTALLED AS PART OF PROJECT SHALL COMPLY WITH FACTORY CURB, CONVENIENCE OUTLET, DISCONNECT SWITCH AND MERV 8 FILTERS. <br /> PRINTS WITH ALL CHANGES NOTED THEREON AT THE COMPLETION OF THE PROJECT AND PRIOR TO ALL REQUIREMENTS OF THE 2016 CALIFORNIA MECHANICAL CODE, 2016 CALIFORNIA BUILDING UNIT SHALL BE ELECTRICALLY INTERLOCKED WITH EF-1. SHEET CONTENT <br /> FINAL ACCEPTANCE AND PAYMENT. CODE 2016 CALIFORNIA BUILDING ENERGY EFFICIENCY STANDARDS AND THE 2016 CALIFORNIA <br /> 2. SUBMITTALS: CATALOG INFORMATION, CUTS AND LISTING OF ALL MECHANICAL EQUIPMENT, EXHAUST FAN ON ROOF <br /> GREEN BUILDING CODE. <br /> COMPONENTS AND DEVICES SHALL BE SUBMITTED FOR REVIEW INCLUDING PERFORMANCE DATA. ALL47GREENHECK MODEL CUE-090-VG UL705 MECHANICAL NOTES, SCHEDULE, <br /> SHALL BE LABELED AND IDENTIFIED PROPERLY. . SUPPLY AIR, RETURN AIR, AND OUTSIDE AIR FOR HEATING, COOLING, OR EVAPORATIVE COOLING EF 450 CFM ® 0.25" E.S.P., 1208 RPM SYMBOLS AND ABBREVIATIONS <br /> 3. SUBSTITUTIONS OR DEVIATIONS FROM THE PLANS OR SPECIFICATIONS SHALL ONLY BE ACCEPTED SYSTEMS SHALL BE CONDUCTED THROUGH DUCT SYSTEMS CONSTRUCTED OF METAL IN 1 ELECTRICAL: 115V/10/60, 1/10 HP <br /> ACCORDANCE WITH SMACNA HVAC DUCT CONSTRUCTION STANDARDS METAL AND FLEXIBLE. <br /> co AT THE TIME OF BIDDING AND MUST BE SUBMITTED AS A WRITTEN CATALOG INFORMATION. THE WITH BACK DRAFT DAMPER, VARI-GREEN MOTOR WITH MOUNTED POTENTIOMETER DIAL, <br /> RECTANGULAR DUCTS EXCEEDING 2 INCHES (51 MM) W.G. SHALL COMPLY WITH SMACNA HVAC <br /> C) BURDEN OF PROOF THAT THE SUBSTITUTED ITEM IS EQUAL TO THE SPECIFIED ITEM RESTS WITH FACTORY CURB, ALUMINUM BIRDSCREEN AND DISCONNECT SWITCH. SHEET NO <br /> `" THE CONTRACTOR. DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE. DUCTS, PLENUMS, AND FITTINGS SHALL UNIT SHALL BELECTRICALLY INTERLOCKED WITH HP-1 <br /> E E <br /> o BE PERMITTED TO BE CONSTRUCTED OF CONCRETE, CLAY, OR CERAMICS WHEN INSTALLED IN THE OPERATING B E LBS. <br /> GROUND OR IN A CONCRETE SLAB, PROVIDED THE JOINTS ARE TIGHTLY SEALED. <br /> w 48. ALL MECHANICAL CERTIFICATE OF ACCEPTANCE FORMS AND ALL RELATED ACCEPTANCE DOCUMENTS - ELECTRICAL AND WEIGHT INFORMATION FOR REFERENCE ONLY. REFER/VERIFY WITH ELECTRICAL AND <br /> SHALL BE SUBMITTED TO THE FIELD INSPECTOR DURING CONSTRUCTION. CERTIFICATE OF STRUCTURAL PLANS. <br /> Q OCCUPANCY WILL NOT BE ISSUED UNTIL THESE FORMS ARE REVIEWED AND APPROVED. <br /> 0 49. ALL MECHANICAL EQUIPMENT AND DUCTWORKS SHALL BE LISTED AND LABELED BY AN APPROVED - SUBSTITUTION OF EQUIPMENT REQUIRES APPROVAL FROM THE ARCHITECT. CONTRACTOR TO PROVIDE <br /> 0 <br /> ui AGENCY AND INSTALLED IN ACCORDANCE WITH THE APPROVED LISTING. AND DEMONSTRATE T-24 COMPLIANCE. M � l ■ <br /> z 50. DUCT INSULATION SHALL HAVE A FLAMESPREAD INDEX NOT TO EXCEED 25 AND SMOKE <br /> z <br /> 0 <br /> DEVELOPED INDEX NOT TO EXCEED 50. SECTION 604.1 2016 CMC. <br />