Laserfiche WebLink
SLOPE TO DRAIN <br />WATERTIGHT SHEET <br />DETAIL "A" <br /> " CW <br />SEAL WATERTIGHT <br />UNION <br />SEE DETAIL "A" <br />STUD WALL <br />CW PIPE IN WALL <br /> " BALL VALVE <br />TRAP PRIMER <br />SECURE TO STUDS <br />ACCESS PANEL <br /> " CWD <br />FIN FLOOR <br />FLOOR DRAIN <br /> " CW TO TRAP <br />CONNECT AS REQ'D <br /> " BELOW FLOOR <br />SEAL WATERTIGHT <br />METAL BOX <br />6" min.BOTTOM OF BOX TO <br />EXTEND TO BE FLUSH <br />WITH WALL FINSH <br />1 1/2" SPUD <br />VACUUM BREAKER TUBE <br />CHECK VALVE <br />6" MIN. <br />PER CPC 603.5.1 <br />VALVE STYLE MAY VARY <br />INSTALL FLUSH VALVE PER MANUFACTURER'S INSTRUCTIONS. <br />NOTES: <br />VERIFY ROUGH IN OF WATER SUPPLY TO ALLOW FOR PROPER VALVE INSTALLATION. <br />TOP OF TOILET <br />URINAL, SEE FIXTURE <br />SCHEDULE <br />CLEANOUT SEWER <br />CONNECTION, LOCATE ABOVE <br />URINAL TRAP AND BELOW <br />URINAL VENT CONNECTION <br />WALL CLEANOUT COVER, CAN BE <br />LOCATED ON EITHER SIDE OF <br />URINAL INSTALL URINAL WALL <br />CLEANOUT AT MATCHING <br />HEIGHTS FOR MULTIPLE URINAL <br />INSTALLATIONS. <br />SHEETSOF730 Howe Avenue, Suite 450Sacramento, CA 95825Phone: 916.921.2112Fax: 916.921.2212XXKITCHEN RENOVATIONJOE SERNA SCHOOLSHEET NO. <br />CONSULTANT <br />UPDATED <br />CADFILE <br />CHECKED <br />DRAWN <br />SCALE <br />PROJECT NO. <br />DATE <br />12/11/2019 <br />REVISIONS BY <br />19-32-050 <br />RL <br />TD <br />FILE NO. 39-50 APP NO. 02- <br />XX <br />AS NOTED <br />191009.00 <br />PM - DESIGN TEAM PROJECT NO. <br />MCM - RL/SL <br />C A <br />RANCHO CORDOVA,CALIFORNIA <br />ENGINEERING CONSULTANTS, INC. <br />P I T A L <br />\\capsac.lan\network\Project_Docs\2019\191009.00\1200 Drawings\1205 AutoCAD Project Files\P5.2.dwg - December 12, 2019 03:16 AM - Joel ValenciaP5.2 PLUMBINGDETAILS