Laserfiche WebLink
#4x12" epoxy dowel <br />w/6" embed into (E) <br />conc @ 18"cc, pull <br />test 10% to 200# <br />ExistingNew <br />(E) Slab <br />Lightly grease this end <br />(N) Conc infill slab <br />Drill ½"øx3" deep hole <br />& epoxy per S0.1, <br />{"øx15" smooth dowel <br />@ 24"cc, typ <br />Note: For utility trenches <br />greater than 1'-6" wide provide <br />slab reinf per plan in addition <br />to {"ø smooth dowels <br />(E) Opng framing <br />(N) 2x nlr, use <br />2-16d @ 16"cc <br />to (E) hdr <br />(N) Studs to match <br />(E), nail per nailing <br />notes on S0.1 <br />(N) 2x PTDF sill ¤ <br />w/}"ø wedge anchors <br />6" from ea end & @ <br />32"cc max. Torque test <br />anchors per schedule on <br />S0.1 <br />(N) 2x nlr, use <br />2-16d @ 16"cc <br />to (E) hdr <br />(N) 2x PTDF sill ¤ on ½" <br />grout bed w/}"ø <br />adhesive anchors 6" <br />from ea end & @32"cc <br />max <br />(N) #3x15" dowel <br />epoxied 3" into (E) <br />curb <br />¾"øx3" deep hole for <br />epoxy per S0.1, pull <br />test 10% to 200# <br />(N) 6" conc curb <br />w/#4 top bar <br />(E) Opng framing <br />(N) Studs to match <br />(E), nail per nailing <br />notes on S0.1 <br />(E) Hdr, king, trimmer, <br />etc. @ opng <br />2x nlr, use 2-16d <br />@ 16"cc to (E) hdr <br />Studs to match (E), <br />nail per Nailing Notes <br />on S0.1 <br />PTDF sill ¤ to match (E) <br />sill ¤ w/anchor per sched <br />@ 32"cc max & 6" from <br />ea end of sill ¤ - min 2 <br />anchors per sill <br />#4x15" curb dowel w/3" <br />embed to (E) curb in <br />epoxy per S0.1, ctr dowel <br />in width of curb <br />6" conc curb w/#4 top <br />bar <br />Provide SP ov/infill frmg <br />per , as occurs4 <br />S0.2 <br />Location Anchor <br />Ext wall or int <br />struct wall <br />Notes <br />Anchor Schedule <br />}"~ expansion <br />anchor per S0.1 <br />Torque test per <br />sched on S0.1 <br />Int non-struct <br />wall see @ "B"-S0.2 <br />6 <br />(N) Headers are solid <br />one piece, same <br />width as studs, <br />header depth <br />per <br />(N) 2-16d TN, <br />T&B, typ <br />(N) Double 2x <br />sub-sill <br />(N) 2x cripple, nail <br />as a multiple stud <br />(E) Studs or posts <br />(N) A35 T&B, typ <br />Cut (E) studs for opng <br />(N) 2x Trimmer stud <br />UNO, nail as multiple stud <br />(E) Sill ¤For balance of info <br />see or <br />Provide (N) }"ø <br />wedge anchor within <br />9" from end of cut <br />sill ¤. Torque test <br />anchors per schedule <br />on S0.1 <br />S0.3 <br />7 <br />S0.3 <br />8 <br />S0.2 <br />1 <br />(N) Dbl 2x <br />sub-sill <br />(N) Stud to match <br />(E) studs as reqd <br />@ opng edge <br />(E) Studs or posts <br />(N) 4-16d @ 2x <br />or 4-20d @ 3x <br />(N) 2-16d <br />TN T&B, typ <br />(N) Hdrs are solid, one <br />piece, same width as <br />studs, hdr depth to be <br />4" for opng w/in one <br />stud bay <br />4'-0" max <br />1'-0" min <br />(E) Jst per plan <br />(N) 2x blkg w/SPPN, <br />typ <br />Do not cut or nick <br />(E) frmg when <br />cutting shtg for <br />opng <br />(N) Opng btwn <br />joist block all <br />unsupported edges <br />(N) ST18 strap <br />ov/shtg to extend one <br />space ea side of opng, <br />nail w/10d @ 6"cc, <br />UNO <br />DO NOT cut <br />(E) frmg when <br />occuring at (N) <br />opng <br />Provide SPPN @ <br />cont member for <br />length of member <br />@ opng, typ <br />(For openings less than 1'-0", straps not required)1'-0" minVerify 3-8d @ <br />1x6 or 4-8d @ <br />1x8 provided @ <br />ea (E) DS plank <br />(E) DS <br />(E) Blkg <br />ea side <br />of opng <br />(E) Frmg <br />(N) SP to <br />match <br />thickness of <br />(E) DS <br />w/SPPN @ <br />all edges1'-0" minVerify SPPN <br />provided @ (E) <br />SP perimeter <br />(E) Frmg <br />(E) SP <br />(E) Blkg <br />ea side <br />of opng <br />(N) SP to <br />match thickness <br />of (E) SP <br />w/SPPN @ all <br />edges <br />(N) SP <br />(E) Rafter <br />stud or blk <br />(N) SPPN <br />(E) DS <br />(N) 3-8d @ (E) <br />1x6 or 4-8d @ <br />(E) 1x8 DS plank <br />(N) SP <br />(E) DS <br />(N) SPPN <br />(N) 3-8d @ (E) <br />1x6 or 4-8d @ <br />(E) 1x8 DS plank <br />(N) 2x4 flat blk <br />w/1-10d T.N. ea <br />side, ea end: blk all <br />unsupported joints <br />1/8" gap <br />3/8"3/8" <br />1/8" gap <br />3/4"3/4" <br />Shtg joint <br />Shtg joint <br />6"max <br />6"max(N) Drilled or <br />saw-cut opng <br />in (E) conc <br />min, typ <br />3" clr <br />(E) Conc wall <br />or slab <br />(E) Reinf per <br />plan <br />(E) Conc slab <br />(E) Wall <br />(E) Ftg8"embedprojection <br />1'-10 129/256" <br />(E) AB <br />(N) Conc slab <br />(N) #4 bent into (E) <br />ftg @ 24"cc <br />w/adhesive per S0.1 Note: Typical footing & <br />slab reinforcement not <br />shown for clarity3"cover(N) 2x PTDF sill ¤ <br />w/\"ø F1554 rods <br />in epoxy 6" from ea <br />end & 24"cc max <br />6" conc <br />curb w/#4 <br />top bar <br />["øx3" deep <br />hole for epoxy <br />per specs, pull <br />test 10% to <br />200# <br />Chip & clean (E) <br />conc surface prior <br />to pouring new <br />conc <br />typ5"min,(N) SP to match <br />(E) shtg thickness <br />per <br />2x In-fill studs <br />@ 16"cc, typ <br />2x Stud @ ea <br />edge, typ <br />2x Nlr T&B, use <br />2-16d @ 16"cc to <br />(E) hdr or sill ¤ <br />(E) Opng frmg <br />(E) Opng frmg <br />S0.2 <br />4 <br />Fasten SP to infill <br />framing w/10d @ <br />6"cc (SPPN) 10d <br />@ 12"cc (SPIN) 9" mincore6" max22" max4" min(E) or (N) slab <br />(N) Drilled hole <br />for pipe <br />(N) Pipe wrap <br />per <br />(E) Ftg <br />If (N) pipe passes blw <br />(E) ftg, install per 18 <br />S0.3DO NOT CUT (E) REINF <br />18 <br />S0.3"D""S" <br />"D"=18" max <br />"S"=2x"D" <br />Footing depth & <br />reinf per plans <br />Firm bearing <br />Slope if soil requires <br />3 sack (min) concrete <br />fill, no reinf, place <br />against undisturbed <br />earth (fill shall cure for <br />a min of 3 days prior <br />to placing footings) <br />min <br />1'-6" <br />Trench <br />Grade <br />Pipe or <br />conduit <br />Pipe @ 'A' <br />(or conduit) <br />Cont or spread <br />footing as occurs <br />Step footing as in <br />at soft bearing <br />pocket @ 'A' <br />No pipe or excavation <br />parallel to footing below <br />this line, step footing <br />lower as required <br />1 <br />2"X""X"9"min16 <br />S0.3 <br />2'-0"min <br />9"min 9"min <br />6"Notes: <br />1. Sleeve @ pipe only, conduit may be cast directly into <br />concrete <br />2. Pipes and conduit must be aligned perpendicular to <br />footings <br />3. No pipes or conduit allowed thru or under spread footings <br />4. 4" < d < 3'-0". If d > 3'-0", steel pipe/conduit okay in <br />trench w/compacted backfill under typ footing. If plastic, <br />provide 10'-0" steel pipe sleeve centered under footing <br />3 sack (min) concrete <br />fill, no reinf, place <br />against undisturbed <br />earth (fill shall cure for <br />a min of 3 days prior <br />to placing footings) <br />Bottom of footing <br />All pipes shall be encased in <br />sleeves. Pipes shall clear <br />sleeves by 1". Caulk with <br />plastic material. If pipe is in <br />place prior to pouring <br />concrete, wrap pipe in 1" <br />glass wool or poly-styrene <br />tape <br />dS-4555 <br />SEP <br />CFOE <br />R O <br />EGRISREA <br />TSTED <br />T <br />A <br />I <br />AIENGINEERA <br />N <br />L <br />ROFI <br />O <br />N <br />LG A <br />H <br />R CI.RDSYR <br />ERGF S <br />O I <br />STRUC LARUT <br />OF 7 SHEETS <br />SHEET NO. <br />UPDATED <br />CADFILE <br />SCALE <br />CHECKED <br />DRAWN <br />DATE <br />PROJECT NO. REVISIONS BY <br />04/03/20 <br />GG <br />GIR <br />AS NOTED <br />19-32-050 <br />CONSULTANT <br />FILE NO. 39-50 APP NO. 02-118041 <br />KITCHEN RENOVATIONHOUSTON (SERNA) SCHOOL730 Howe Avenue, Suite 450Sacramento, CA 95825Phone: 916.921.2112Fax: 916.921.2212TYPICAL FOUNDATION& RENOVATION DETAILSS0.3 <br />S0.3 <br />1 (N) Slab to (E) Slab on Grade <br />S0.3 <br />2 (N) Slab to (E) Slab @ Utility Trench <br />S0.3 <br />7 Infill Framing without Curb <br />S0.3 <br />8 Infill Framing with Curb <br />S0.3 <br />9 Infill Framing with Curb - Sheathed Wall <br />S0.3 <br />13 (N) Framed Wall Openings @ (E) Wall <br />S0.3 <br />12 (N) Framed Wall Opng w/in One (E) Stud Bay <br />S0.3 <br />14 (N) Roof Opening in (E) Roof <br />S0.3 <br />11 (N) SP Infill @ (E) Opng <br />S0.3 <br />15 (N) SP to (E) DS Joints <br />S0.3 <br />6 (N) Opng in (E) Conc Wall or Slab <br />S0.3 <br />4 (N) Slab to (E) Footing <br />S0.3 <br />3 (N) Curb to (E) Slab <br />S0.3 <br />10 Infill Framing at (E) Window <br />S0.3 <br />5 (N) Utility thru (E) Footing <br />S0.3 <br />16 Footing at Soft Bearing Pocket & at Adjacent Utilities <br />S0.3 <br />17 Trench Parallel to Footing <br />S0.3 <br />17A . <br />S0.3 <br />18 Pipe Below Footing <br /> <br /> <br /> <br />4/10/2020 <br />04/10/2020