Laserfiche WebLink
REFRIGERATION CORP. <br />COOLTEC <br />PHONE: (909) 865-2229 FAX: (909) 868-0777 <br />E-MAIL: gshare@cooltecrefrigeration.com <br />REFRIGERATION PLAN <br />1250 E. FRANKLIN AVENUE, POMONA, CA 91766 <br />PROJECT NAME: <br />DRAWING TITLE: <br />JOE SERNA SCHOOL <br />MODEL No. <br /> CRS-4 <br />SPECIFICATION CONSTRUCTION NOTES FOR TRADES <br />LINE SIZE (O.D.) AND RUN <br />LINE RUNLENGTH(FEET)MODELDESCRIPTION <br />FIXTURES <br />SYSTEM ITEM #TEMP (F)FIXT.REFRIGERANTSST.R-ACCESSORIES (SEE SUPPLY CODE *) <br />V <br />@ 6O Hz <br />RATING <br />H.P.RLA <br />COMPRESSORS <br />V PH DEFROSTMBH. <br />(95°F) <br />MODEL 1 Ø FAN <br />RLA <br />RATING @ 60 Hz <br />UNIT COOLER SYSTEM <br />HEATER <br />FLA V PH ROUTE TOTAL POWER <br />SUCTIONDISCH.LIQUIDDRAINHEATERCRANK CASECRS-4 MOTORS 2 <br />CONDENSER FAN <br />208V, 60 Hz <br />PHAMPS <br />TIME CLOCK <br />PRESSURECONTROLHEADTHERMOSTATFAN CYCLE SWITCHSUCTIONACCUMULATORSOLENOIDVALVEVALVEEXPANSIONTHERMOSTATICREFRIGERANTLBS IN SYSTEMITEM #QUANTITYNOTE: <br />US LISTEDCLU <br />CONDENSING UNIT <br />33SZ FILE SA32027 <br />R <br />POWER SUPPLY: <br />CONNECTED LOAD= MINIMUM AMPACITY= AMP <br />FUSE SIZE:COOLTEC ENGINEERING SUMMARY 17.9 AMP20.1 <br />AMP208V/3PH/60HZ <br />F - FACTORY INSTALLED <br />L - LOOSE (FIELD INSTALLED) <br />R - REFRIGERATION CONTRACTOR <br />M - MANUFACTURER EQUIPPED <br />* SUPPLY CODES: B <br />M <br />S SINGLE <br />BRANCH <br />MAIN <br />ROOF MOUNT <br />ITEM NO.______REMOTE REFRIGERATION PACKAGE <br />THE REFRIGERATION PACKAGE SHALL BE PRE-ENGINEERED AND FACTORY ASSEMBLED UNIT, TRADE NAME "REFRIG-O-PAK", AS MANUFACTURED BY COOLTEC <br />REFRIGERATION CORP., 1250 E. FRANKLIN AVE., POMONA, CA 91766. PHONE: (909) 865-2229, FAX: (909) 868-0777. <br />E-MAIL ADDRESS: sales@cooltecrefrigeration.com <br />CONTRACTOR SHALL FURNISH AND INSTALL, WHERE SHOWN ON PLANS, (1) COOLTEC U.L. APPROVED "REFRIG-O-PAK" AIR COOLED REMOTE <br />REFRIGERATION PACKAGE, MODEL_______, WITH CONTROL PANEL, REFRIGERATION SYSTEM SHALL BE HOUSED IN A WEATHER PROTECTED <br />ENCLOSURE. THE FRAME, ENCLOSURE, AND PANELS SHALL BE FABRICATED OF GALVANIZED STEEL. <br />THE ENTIRE FRAME SHALL BE PRE-ASSEMBLED, WELDED, CLEANED, AND PRIMED AND POWDER COATED EPOXY ENAMEL AND BAKED. <br />CONDENSER FAN MOTORS SHALL BE MOUNTED ON THE TOP OF THE ENCLOSURE FOR BETTER HEAT DISCHARGE. <br />A. AIR-COOLED CONDENSING UNITS SHALL BE HERMETIC/GLACIER SCROLL TYPE (COPELAND). EACH UNIT SHALL BE EQUIPPED WITH <br /> HIGH-LOW PRESSURE CONTROL, LIQUID LINE DRIER, SIGHT GLASS, HEAD PRESSURE CONTROL, TIME CLOCKS AND PUMP DOWN SOLENOIDS. <br />B. ALL COMPRESSOR UNITS SHALL BE NEW FACTORY ASSEMBLED TO OPERATE WITH THE REFRIGERANT SPECIFIED IN THE ENGINEERING <br /> SUMMARY SHEET. REFRIGERANT R-448A SHALL BE USED ON ALL COMMERCIAL TEMPERATURE UNITS AND LOW TEMPERATURE UNITS. <br />C. THE CONDENSER SHALL BE SECTIONAL, REMOVABLE, WITH RIFLED TUBE SLOTTED FINNED, AND SHALL BE DESIGNED FOR 20°FTD. <br /> THE CONDENSER SHALL BE ELECTRO-FIN COATED AGAINST SALT AIR CONTAMINATION AND CORROSION. <br />1. REFRIGERATION UNITS <br />A. ALL REFRIGERANT LINES SHALL BE EXTENDED TO ONE SIDE OF THE PACKAGE IN A NEAT AND ORDERLY MANNER. SUCTION LINES MUST <br /> BE INSULATED WITH ARMAFLEX (1" THICK FOR LOW TEMP, 3/4" THICK FOR MEDIUM TEMP). <br />B. ALL TUBING SHALL BE SECURELY SUPPORTED AND ANCHORED WITH CLAMPS. <br />C. SILVER SOLDER AND/OR SIL-FOS SHALL BE USED FOR ALL REFRIGERANT PIPING. SOFT SOLDER IS NOT ACCEPTABLE. <br />D. ALL PIPING TO BE PRESSURE TESTED WITH NITROGEN AT 200 PSI. <br /> AFTER THE CONDENSING UNIT AND COIL HAVE BEEN CONNECTED, THE BALANCE OF THE SYSTEM SHALL BE LEAKED TESTED WITH ALL <br /> VALVES OPENED. <br />2. PRE-PIPING <br />A. THE PACKAGE SHALL HAVE A FACTORY MOUNTED AND PRE-WIRED CONTROL PANEL COMPLETE WITH MAIN FUSED DISCONNECT. <br /> COMPRESSOR CIRCUIT BREAKERS, FUSES, CONTACTORS AND THE TIME CLOCKS WIRED FOR SINGLE POINT CONNECTION. <br />B. ELECTRICAL CONTRACTOR SHALL PROVIDE AND INSTALL MAIN POWER LINES, ALL IN ACCORDANCE WITH <br /> THE WIRING DIAGRAM AND PER LOCAL CODES. <br />3. CONTROL PANEL <br />A. EACH SYSTEM AND EVAPORATOR IS SHIPPED UNDER NITROGEN PRESSURE. <br /> USE CAUTION AND EXERCISE SAFETY AT ALL TIMES WHEN PREPARING FOR FINAL HOOK-UP. <br />4. SAFETY CAUTION <br />A. EVAPORATIVE COILS SHALL BE DIRECT EXPANSION TYPE, FABRICATED OF COPPER TUBES WITH ALUMINUM FINS. ALL EVAPORATIVE COILS <br /> SHALL BE PROVIDED WITH SOLENOID VALVE, THERMOSTATIC EXPANSION VALVE, AND ELECTRONIC THERMOSTAT, PIPED AND WIRED TO THE <br /> JUNCTION BOX FOR POSITIVE PUMP DOWN. <br />B. EVAPORATIVE COILS SHALL BE EQUIPPED WITH ENERGY SAVING "EC" MOTORS. <br />5. EVAPORATIVE COIL <br />32 <br />CRS-4 <br />A. REFRIGERATION CONTRACTOR SHALL RUN ALL REFRIGERATION LINES WHICH EXTEND DOWN THRU WALL(S) BEFORE WALL(S) ARE CLOSED <br /> UP WHEN CONDUIT IS NOT PROVIDED. <br />B. REFRIGERATION CONTRACTOR TO SEAL BOTH ENDS OF CONDUIT WITH FOMOFIL AFTER ALL LINES HAVE BEEN RUN. <br /> IF PULL BOX(ES) ARE SPECIFIED, THEY MUST BE A MINIMUM 12"x 12". <br />C. REFRIGERATION CONTRACTOR SHALL INSULATE ALL REFRIGERATION SUCTION LINES. <br />D. REFRIGERATION CONTRACTOR SHALL VERIFY LOCATION OF BLOWER COIL(S) AND COMPRESSOR(S) FOR ALL REFRIGERATED AREAS. <br />E. REFRIGERATION CONTRACTOR SHALL VERIFY LOCATION OF PITCH POCKET(S) FOR REFRIGERATION LINE PENETRATION THRU ROOF WITH <br /> GENERAL CONTRACTOR. GENERAL CONTRACTOR TO INSTALL ALL PITCH POCKETS. <br />F. CONTRACTOR SHALL USE ONLY CLEAN DEHYDRATED, SEALED REFRIGERATION GRADE A.C.R. COPPER TUBING. <br /> USE ONLY LONG RADIUS ELBOWS TO REDUCE FLOW RESISTANCE AND LINE BREAKAGE. <br />G. SILVER SOLDER AND/OR SIL-FOS SHALL BE USED ON ALL REFRIGERANT PIPING. SOFT SOLDER IS NOT ACCEPTABLE. <br /> USE MINIMUM 35% SILVER SOLDER FOR DISSIMILAR METALS. <br />H. ALL PIPING MUST BE SUPPORTED WITH HANGERS THAT CAN WITHSTAND THE COMBINED WEIGHT OF TUBING, INSULATION, VALVES, AND <br /> FLUID IN THE TUBING. <br />I. USE NITROGEN IN THE COPPER TUBING DURING BRAZING TO PREVENT FORMATION OF COPPER OXIDES. LIQUID AND SUCTION LINES <br /> MUST BE FREE TO EXPAND INDEPENDENTLY OF EACH OTHER. DO NOT EXCEED 100 FEET WITHOUT A CHANGE IN DIRECTION OR AN <br /> OFFSET. PLAN PROPER PITCHING, EXPANSION ALLOWANCE, AND P-TRAPS AT THE BASE OF ALL SUCTION RISERS AND AT EVERY 15 FEET <br /> OF EVERY VERTICAL RISE. INSTALL SERVICE VALVES AT SEVERAL LOCATIONS FOR EASE OF MAINTENANCE. THESE VALVES MUST BE <br /> APPROVED FOR 450 PSI WORKING PRESSURE. <br />J. ALL PIPING TO BE PRESSURE TESTED WITH NITROGEN AT 200 PSI WITH ALL VALVES OPEN AND HELD FOR 12 HOURS. <br /> ELECTRONIC LEAK DETECTORS SHALL BE USED TO LOCATE ALL LEAKS. <br />K. COMPLETE SYSTEM SHALL BE EVACUATED TO 500 MICRONS WITH VACUUM PUMP BEFORE CHARGING THE SYSTEM. <br />L. ONCE SYSTEM IS CHARGED AND RUNNING, ADJUST ALL CONTROLS _____ INCLUDING PRESSURE CONTROLS, EXPANSION VALVES, <br /> THERMOSTATS, AND TIME CLOCKS. RETURN AFTER 24 HOURS TO VERIFY PROPER OPERATION OF SYSTEMS. <br />M. REFRIGERATION CONTRACTOR TO PROVIDE AND INSTALL DRAIN LINE HEATER WITH INSULATION IN FREEZER TO BE CONNECTED BY <br /> ELECTRICAL CONTRACTOR. <br />N. REFRIGERANT SUCTION LINES OUTSIDE OF REFRIGERATED COMPARTMENTS, NOT RUN IN CONDUIT, SHALL BE INSULATED BACK TO <br /> COMPRESSOR WITH ARMSTRONG ARMA-FLEX AP-25/50 FOAMED PLASTIC INSULATION OR EQUAL IN ACCORD WITH DIRECTION OF THE <br /> MANUFACTURER. MINIMUM THICKNESS SHALL BE 3/4 INCH FOR COMMERCIAL TEMPERATURE AND 1.0 INCH FOR LOW TEMPERATURE. <br />O. FILL ROOF REFRIGERATION AND ELECTRICAL PITCH POCKETS WITH FOAM AND SEALANT. <br />P. REFRIGERATION CONTRACTOR TO SEAL ALL REFRIGERATION LINE PENETRATIONS MADE THRU WALK-IN COOLERS/FREEZERS, AND <br /> REFRIGERATED BASE SECTIONS OF COUNTERS. <br />2. REFRIGERATION CONTRACTOR <br />A. ELECTRICAL CONTRACTOR TO PROVIDE MAIN POWER FOR THE REFRIGERATION PACKAGE AND CONNECT CONTROL AND DEFROST SYSTEMS <br /> AT THE COIL. <br />B. ELECTRICAL CONTRACTOR TO PROVIDE POWER FOR MEDIUM AND LOW TEMPERATURE EVAPORATOR COILS. POWER FROM BUILDING. <br /> PROVIDE SEPARATE POWER SOURCE FOR EACH EVAPORATOR. <br />C. ELECTRICAL CONTRACTOR TO CONNECT DRAIN-LINE HEATER IN THE FREEZER. <br />D. ALL ELECTRICAL WIRING AND INSTALLATION SHALL BE ACCORDANCE WITH THE WIRING DIAGRAM AND PER LOCAL CODES. <br />E. IF CONTRACTED, ELECTRICAL CONTRACTOR TO INSTALL ALL CONDUITS FOR REFRIGERATION LINES IN WALLS, PRIOR TO WALLS ARE <br /> CLOSED UP. ALL PULL BOXES MUST BE A MINIMUM OF 12"x 12". <br />3. ELECTRICAL CONTRACTOR <br />A. PLUMBING CONTRACTOR TO PROVIDE TYPE "M" COPPER DRAIN LINES FOR WALK-IN REFRIGERATOR AND FREEZER, PITCHED 1/2 INCH <br /> PER FOOT OF RUN. IN FREEZER, HEATED DRAIN LINE MUST BE INSULATED TO PREVENT FREEZING. TRAP DRAIN LINES OUTSIDE OF <br /> REFRIGERATED SPACE TO AVOID ENTRANCE OF WARM AND MOIST AIR. <br />B. CONTRACTOR TO PROVIDE INDIVIDUAL DRAIN LINE FOR EACH EVAPORATOR UNLESS OTHERWISE CALLED FOR IN THE PLANS. <br />C. ALL PLUMBING INSTALLATION SHALL BE IN ACCORDANCE WITH LOCAL CODES. <br />4. PLUMBING CONTRACTOR <br />H. ALL CORE DRILLING REQUIRED FOR REMOTE REFRIGERATION PIPING WORK BY THE REFRIGERATION CONTRACTOR, IS IN THE GENERAL <br /> CONTRACTOR'S SCOOP OF WORK. COORDINATE EXACT LOCATION AND NUMBER OF PENETRATIONS WITH THE REFRIGERATION CONTRACTOR <br /> AND COMPLY WITH ALL LANDLORD REQUIREMENTS FOR X-RAY OF SLAB PRIOR TO WORK. <br />I. ANY ATTACHMENT TO BUILDING STRUCTURE FOR LOAD BEARING WEIGHT TO BE PROVIDED AND CO-ORDINATED BY GENERAL CONTRACTOR. <br />J. GENERAL CONTRACTOR TO BACKFILL ALL PITCH POCKETS TO TOP WITH TAR OR PITCH AFTER REFRIGERATION AND ELECTRICAL LINES <br /> HAVE BEEN RUN. <br />A. CONTRACTORS SHALL VERIFY ALL DIMENSIONS AND COORDINATE WITH OTHER TRADES. <br />B. GENERAL CONTRACTOR TO VERIFY AND CO-ORDINATE LOCATION OF REFRIGERATION RACK WITH REFRIGERATION CONTRACTOR TO SATISFY <br /> LOCAL CODE REQUIREMENTS AND MAINTENANCE OF THE RACK. <br />C. GENERAL CONTRACTOR TO VERIFY REFRIGERATION LINE RUNS THRU TO ROOF OR MULTI-STORY BUILDING PRIOR TO CONSTRUCTION WITH <br /> REFRIGERATION CONTRACTOR FOR ACCESSIBILITY. <br />D. GENERAL CONTRACTOR TO VERIFY ACCESS OF CRANE OR MECHANICAL LIFT WITH REFRIGERATION CONTRACTOR PRIOR TO CONSTRUCTION <br /> (IF REQUIRED). <br />E. GENERAL CONTRACTOR SHALL PREPARE AND WEATHER PROOF THE PLATFORM AND CURBED OPENINGS FOR REFRIGERATION PIPING AND <br /> ELECTRICAL CONDUIT. ROOF PAD TO BE CONSTRUCTED OF HEAVY DUTY STEEL FRAMING, AND THE FINISHED HEIGHT DICTATED PER <br /> LOCAL CODES. <br />F. PROVIDE SHEET METAL CAP WITH 2" HIGH PITCH POCKET COLLAR AND WATER TIGHT SOLDERED JOINTS. <br />G. GENERAL CONTRACTOR TO ALLOW 3'-0" (36") OF CLEAR SPACE AROUND ROOF PAD FOR MAINTENANCE. <br />1. GENERAL CONTRACTOR <br />A 16448A25352 D 2A 1 5.6 3 S KE2MED3/87/832085.63/4ZB07KAE-PFV 9.32 ADT090AEK 1.8 115WALK-IN COOLER 100 F F F F F <br />B 16448A-20-103 D 3A 1 8.3 3 S KE2LOW3/832088.31.5ZF06K4E-TF5 6.99 LET065BEK 1.0 208WALK-IN FREEZER 100 F F F F F <br />2081/2 4.0 1 8.0 1 <br />7.8 208 1 F <br />- ALL SYSTEMS ENGINEERED WITH R-448A REFRIGERANT. ANY BASES/COILS NOT SUPPLIED BY COOLTEC MUST BE EQUIPPED WITH R-448A EXPANSION VALVES. <br />- REFRIGERATION PIPE SIZES ARE BASED ON A MAXIMUM LINE RUN UP TO 100 EQUIVALENT FEET FOR LIQUID AND SUCTION LINES. VERIFY LINE LENGTHS WITH <br /> JOB SITE CONDITIONS AND LINE ROUTING AT INDIVIDUAL INSTALLATIONS. IF LINE RUNS ARE GREATER THAN 100 FEET, PLEASE CONTACT COOLTEC FACTORY. <br />- "COMPRESSOR MOTOR PROTECTED UNDER PRIMARY SINGLE PHASE PROTECTION" <br />- EFFECTIVE JANUARY 1. 2009, ALL WALK-IN COOLER AND FREEZER EVAPORATIVE COILS INSTALLED IN THE U.S.A. SHALL BE SUPPLIED WITH ENERGY <br /> EFFICIENT (EC) MOTORS BASED ON THE FEDERAL ENERGY INDEPENDENCE AND SECURITY ACT (HR-6). <br />AMBIENT <br />TEMPERATURE <br />95°F <br />- ELECTRO-FIN COATED CONDENSERS AGAINST SALT AIR CONTAMINATION AND CORROSION FOR ALL CONDENSERS. <br />208 VOLTS, 3 PHASE, 60 HERTZ. <br />REFRIG-O-PAK SYSTEM <br />ALLOW 36" CLEAR AROUND UNIT <br />ESTIMATED WEIGHT (LBS.) 800 <br />ELECTRICAL CONTROL PANEL <br />PIPING CONNECTION SEQUENCE <br />REFRIGERATION <br />IN <br />AIR <br />AROUND RACK'S PLATFORM <br />CLEARANCE REQUIREMENT <br />48" <br />10" <br />48" <br />50" <br />62"56" <br />6" <br />1 <br />2 <br />E <br />G <br />H <br />O OFF CYCLE (TEMP.) <br />HOT GAS (TIMED) <br />GRAVITY (TIMED) <br />ELECTRIC (TIMED) <br />D DEMAND DEFROST (KE2) <br />AT EACH SIDE OF RACK <br />TYPICAL 2 PLACES <br />SEISMIC RESTRAINTS <br />ADT090AEK 1/2"7/8"3/4"4845-1/2"2 1400 ----1.89000 <br />LET065BEK 1/2"3/4"4345-1/2"2 1400 --7.8 5/8"1.06500 <br />UNIT COOLER DETAIL <br />LENGTH <br />15.81" <br />14.26" <br />2.97" <br />LENGTH <br />EQUALEQUAL <br />12.06" <br />1.88" <br />14.26"14.94" <br />15.81" <br />3" <br />3/4" NPT DRAIN <br />ELEVATION <br />PLAN VIEW <br />END VIEW <br />3/4" NPT DRAIN <br />ELECTRICAL <br />CONNECTION <br />END <br />REFRIGERATION <br />CONNECTION <br />END <br />MODELS: ADT / LET <br />CONNECTIONS (In.) <br />COIL <br />UNIT <br />No. <br />MODEL <br />SUCTION DRAIN <br />APPROX. <br />(Lbs.) <br />SHIP WT.SYSTEM <br />A <br />INLET <br />OD ID MPT <br />LENGTH <br />FANS <br />QTY.CFM <br />ELEC <br />DEFROST <br />208-1-60 <br />EC <br />MOTOR <br />115/1/60 <br />B <br />EC <br />MOTOR <br />208/1/60 <br />CAPACITY <br />BTU <br />7/8 <br />VOLTAGEDEFROSTMODEL <br />RLA <br />UNIT COOLER <br />ITEM #QUANTITYD 3 LET065BEKBSYSTEM 208/17.81 <br />DESCRIPTION <br />WALK-IN FREEZER <br />POWER FROM BUILDING BY ELEC. CONTRACTOR <br />EVAP. COIL <br />POWER REQUIRED FOR WALK-IN EVAPORATOR COIL'S DEMAND CONTROL AND TO DRAIN HEATERS. <br />POWER FROM BUILDING; SUPPLIED BY ELECTRICAL CONTRACTOR <br />NOTE: PROVIDE SEPARATE POWER SOURCE FOR EACH EVAPORATOR. <br /> POWER FROM BUILDING. <br />VOLTAGERLA <br />208/15.0 <br />DRAIN HEATER <br />VOLTAGERLA <br />208/112.8 <br />TOTAL LOAD <br />DA 115/11.81WALK-IN COOLER ADT090AEK2 ----115/11.8 <br />30 <br />- ELECTRICAL CONTRACTOR TO SUPPLY POWER FROM BUILDING AND CONNECT POWER TO WALK-IN EVAPORATOR COILS, DEMAND DEFROST CONTROLS AND DRAIN HEATERS. <br />"REFRIG-O-PAK" SYSTEM # CRS-4FS7.1 <br />A <br />FS7.1 <br />E <br />PLATFORM DETAIL <br />FS7.1 <br />F <br />FS7.1 <br />B <br />FS7.1 <br />C <br />LODI, CA <br />COIL INFORMATION <br />FS7.1 <br />H <br />2" HIGH PITCH <br />POCKET COLLAR HENRY #208 WET PATCH <br />ROOF CEMENT <br />TRIPLE EXPANDABLE <br />FOAM INSULATION <br />CARDBOARD WITH DUCT <br />TAPE TO HOLD FOAM IN PLACE <br />18 GA. GALVANIZED <br />STEEL SHEET METAL CAP <br />3/4" THICK <br />PLYWOOD SUB-TOP <br />ROOF <br />ROOFING MATERIAL <br />TO RUN UP UNDER CAP <br />CONTINUOUS COVING <br />HEAVY GAUGE STEEL <br />FRAMING MAXIMUM <br />16" O.C. SPACING <br />ROOF STRUCTURE <br />INSTRUCTIONS FOR REFRIGERATION CONTRACTOR <br />A. TAPE CARDBOARD AT THE BOTTOM OF EACH PITCH POCKET OPENING AS SHOWN. <br />B. AT THE TOP OF THE PITCH POCKET OPENING, FILL IN WITH TRIPLE EXPANDABLE FOAM INSULATION <br /> (DOW CHEMICAL "GREAT STUFF INSULATING FOAM), AND LET FOAM CURE FOR ONE HOUR. <br />C. APPLY HENRY #208 WET PATCH ROOF CEMENT IN BETWEEN REFRIGERATION PIPING, ELECTRICAL LINES, <br /> AND FOAM. LET CURE FOR FOUR HOURS. THIS SHOULD SEAL ALL PIPING AND LINES IN THE PITCH <br /> POCKET, TO PREVENT RAIN WATER FROM PENETRATING THROUGH. <br />GENERAL CONTRACTOR <br />REFRIGERATION CONTRACTOR <br />4"6" <br />76" <br />8"4" <br />6" <br />6" <br />56" <br />6" <br />15" <br />PITCH POCKET OPENING FOR <br />REFRIGERATION LINES <br />PITCH POCKET OPENING FOR <br />ELECTRICAL LINES <br />OUTLINE OF CRS-4 <br />REFRIGERATION RACK <br />PLAN VIEW OF 56"x 76" ROOF PLATFORM <br />21" <br />6"min. <br />2"OPEN THRUOPEN THRUROOFING MATERIAL TO <br />RUN UP UNDER METAL CAP <br />CONTINUOUS ALL AROUND <br />2" HIGH PITCH POCKET COLLARS WITH <br />WATER-TIGHT SOLDERED JOINTS <br />18 GAUGE <br />GALVANIZED <br />METAL CAP <br />TYPICAL SECTION VIEW <br />ROOF <br />48" RACK LENGTH12"16" <br />1.GENERAL CONTRACTOR TO PROVIDE LEVEL PLATFORM AT CODE HEIGHT. <br />2.PROVIDE TWO PITCH POCKETS IN THE PLATFORM AS LOCATED. <br />3.PROVIDE SHEET METAL CAP WITH 2" PITCH POCKET COLLAR AND WITH <br />WATER TIGHT SOLDERED JOINTS. <br />1.BACK FILL PITCH POCKET OPENING WITH EXPANDED FOAM AND ROOF <br />SEALANT AFTER COMPLETION OF ELECTRICAL AND REFRIGERATION <br />PIPING. <br />ELECTRICAL <br />CONTROL PANEL <br />MAIN FUSIBLE <br />DISCONNECT <br />RAIN-TIGHT FLEXIBLE <br />CONDUITS BY <br />ELECTRICAL CONTRACTOR <br />POWER FEEDER <br />WIRING CONDUIT <br />CONTROL CIRCUIT <br />WIRING CONDUIT <br />HEAVY DUTY PLATFORM <br />BY GENERAL CONTRACTOR <br />FINISHED <br />ROOF <br />REFRIGERATION LINE SEQUENCE <br />A B <br />12" <br />3"23" <br />MAIN FUSIBLE <br />DISCONNECT <br />ACCESS PANEL <br />REFRIGERATION LINES <br />TO RUN INSIDE OF RACK <br />AT THIS END <br />HEAVY DUTY PLATFORM <br />BY GENERAL CONTRACTOR <br />FINISHED ROOF 6" <br />6" <br />RAIN TIGHT PITCH POCKET <br />FS7.1 <br />D <br />CONTROL BOX W/ <br />ACCESS DOOR <br />(WATER-TIGHT) <br />48" <br />RACK <br />48" RACK <br />FUSIBLE <br />DISCONNECT <br />16"12" <br />76" PLATFORM 36" <br />CLEAR <br />36" <br />CLEAR <br />4" <br />4" <br />56" <br />PLATFORM <br />36" <br />CLEAR <br />36" <br />CLEAR <br />128" <br />148" <br />LIQUID LINE <br />SUCTION LINE <br />P-TRAP DETAILS AND <br />SUCTION LINE RISER <br />P-TRAP <br />DIRECTION <br />OF FLOW <br />MULTIPLE RISER DETAIL <br />RISER <br />DIRECTION <br />OF FLOW <br />LIQUID LINE <br />SUCTION LINE <br />P-TRAP <br />EVERY 15' <br />TYPICAL <br />ISOMETRIC VIEW <br />P-TRAP <br />15' MAX. <br />LIQUID LINE <br />SUCTION LINE <br />•INSULATE SUCTION LINES WITH ARMAFLEX: <br />3/4" FOR COMMERCIAL TEMPERATURE AND 1" FOR LOW TEMP. <br />•ALL JOINTS BRAZED WITH 35% SILVER CONTENT BRAZING ROD <br />•INSTALL "P" TRAP ON SUCTION LINE EVERY 15' OF EVERY VERTICAL RISE <br />•INSTALL INVERTED TRAP ON TOP OF THE RISE TO PREVENT OIL FROM SEEPING DOWN •NOT TO <br />EXCEED 45' VERTICALLY OVER ALL <br />NOTES: <br />SINGLE RISER DETAIL <br />FS7.1 <br />G <br />FS7.1 <br />I <br />REFER TO G/FS7.2 FOR PLATFORM ANCHORAGE <br />3/8" x 3 1/2" MIN PENETRATION <br />LAG BOLT & WASHER REFER <br />TO G/FS7.2 <br />SHEETSOF730 Howe Avenue, Suite 450Sacramento, CA 95825Phone: 916.921.2112Fax: 916.921.2212XX <br />SHEET NO. <br />CONSULTANT <br />UPDATED <br />CADFILE <br />CHECKED <br />DRAWN <br />SCALE <br />PROJECT NO. <br />DATE <br />04/10/2020 <br />REVISIONS BY <br />19-32-050 <br />SLH <br />SLH <br />FILE NO. 39-50 APP NO. 02-118041 <br />KITCHEN RENOVATIONHOUSTON (SERNA) SCHOOLFOODSERVICE EQUIPMENTREMOTE REFRIGERATIONFS7.1