Laserfiche WebLink
IDENTIFICATION STAMP <br /> DIV. OF THE STATE ARCHITECT <br /> ELECTRICAL SERVICE LOAD CALCULATION >> APP. 02-117806 INC: 3 <br /> SERVICE ^LUGSION ( E) MAIN SWITCHBOARD MSB <br /> REVIEWED FOR <br /> CEf C 220) I SS 0 FLS❑� ACS❑� <br /> INTERIOR LIGHTING 16611 SQ. FT.@ 3.00 WATTS PER SQ. FT. 49.83 KVA I � � I DATE: 03/03/2020 <br /> I <br /> 25%CONTINUOS LOAD FACTOR 12.46 KVA I <br /> EXTERIOR LIGHTING 1.10 KVA I M <br /> GENERAL PURPOSE RECEPTACLE OUTLETS 16.61 KVA <br /> NEUTRAL (E) LODI <br /> FIRST 10 KW OR LESS @ 100%= 10.00 KVA I LINK ELECT <br /> REMAINDER OVER 10 KW = 6.61 @ 50%= 3.31 KVA METER <br /> 1600AD (E) MAIN SWITCHBOARD "MSB" <br /> HEATING, VENTILATING AND AIR CONDITIOINING EQUIPMENT 3P 1 600 AMPERES BUSSING <br /> AIR CONDITIONING 188.70 KVA I 277/48OV, 30, 4W, 42,000 AIC O <br /> EXHAUST FANS 0.05 KVA EA. 6 0.30 KVAI (E) U.G. SECONDARY SERVICE <br /> SERIVE WATER HEATING 15.00 KVA I I N <br /> EQUIPMENT AND APPLIANCES <br /> FROM INCREMENT 1I NEUTRAL (E) (E) (E) (E) (E) <br /> BASKETBALL HOOP LIFTS 8.00 KVA 150A ST 1000A� 600A <br /> SCOREBOARDS 3.00 KVA I GROUND 3P 3P 3P w a <br /> MOTORIZED DOORS 1.40 KVA I z <br /> (E) U.G. - <br /> PRIMARY <br /> SERVICE <br /> LARGEST MOTOR= 54.85 KVA @ 25%= 13.71 KVA <br /> TOTAL SERVICE LOAD = 306.81 KVA I INCREMENT 1 LOAD (E) LOAD <br /> (E) UTILITY SERVICE <br /> TRANSFORMERU) h--I <br /> 306.8 KVA @ 277/480 VOLT 3 PHASE = 369 AMPERES (PAD MOUNTED) (E) "UFER" GROUND-----') <br /> ROUND - - - - - - o <br /> U � � <br /> PROVIDE 600 AMP, 277/480 VOLT, 3 PHASE, 4 WIRE SERVICE. 1 o <br /> z I U <br /> File: SERVLOAD.XLW N p <br /> Ld <br /> W <br /> Ir"Y"I, ❑ <br /> r <br /> I <br /> :(6) <br /> (E) BOND TO COLD WATERPIPE, GAS PIPE ANDBUILDING STEEL PER NEC250-104. <br /> W/ 4#500 KCMIL CU + 1#400 KCMIL CU GND. <br /> � w o <br /> V � <br /> l <br /> PANEL ~ <br /> "HG" <br /> 600A <br /> 0. <br /> 0 <br /> P. <br /> U <br /> O rl <br /> /z/�1U <br /> V <br /> I z <br /> . U [s- <br /> U � <br /> N � <br /> + <br /> 480V EQUIPMENT GROUNDING <br /> A B C CONDUCTOR <br /> DRY-TYPEKEY NOTES r TRANSFORMER "TG" <br /> TRANSFORMER U 150 KVA <br /> 0 L___ J 480V TO 120/208V, <br /> r7 30, 4W <br /> O1 INTERCEPT EXISTING PULL BOX, CONDUIT AND WIRE. MATCH z <br /> CONDUIT AND WIRE, SPLICE AND EXTEND TO NEW I o 0 <br /> NEUTRAL DISTRIBUTION PANEL "HG". NEW DISTRIBUTION PANEL "HG" z 0 <br /> SHALL BE SIZED TO ACCOMMODATE ALL CONDUCTORS AS <br /> SHOWN. MAKE ALL PROVISIONS AS REQUIRED. <br /> IN <br /> N z#z <br /> BONDING 208Y/120V + 1#4"CU GND. CU <br /> JUMPER MEEHLEIS <br /> MODULAR <br /> (N) (N) BUILDINGS, INC. <br /> fr F_ PANEL PANEL A DESIGN BUILD <br /> "LG1 " "LG2" COMPANY <br /> NEAREST N G 400A 225A <br /> GROUNDING 1303 E. LODI AVE. <br /> ELECTRODE LODI, CA. 95240 <br /> (209) 334-4637 <br /> CA. LIC. NO. 473488 <br /> -y- NV. LIC. NO. 37887 <br /> BONDING <br /> JUMPER <br /> ISOLATED NEUTRAL TERMINAL <br /> GROUNDING ELECTRODE CONDUCTOR <br /> TRANSFORMER GROUNDING DETAIL NTS 2 PARTIAL ONE-LINE DIAGRAM - MAIN SWITCHBOARD "MSB" NTS <br /> PANEL "LG2" PANEL "LG1" PANEL "HG" <br /> 120/208 Volt, 3 Phase, 4 Wire 10 KAIC Rating 120/208 Volt, 3 Phase, 4 Wire 10 KAIC Rating 277/480 Volt, 3 Phase, 4 Wire 35 KAIC Rating <br /> 225 Amp BUS CU. SURFACE Mounted 400 Amp BUS CU. SURFACE Mounted 600 Amp BUS CU. SURFACE Mounted <br /> Amp MCB NEMA 1 Type 400 Amp MCB NEMA 1 Type 600 Amp MCB NEMA 1 Type <br /> 225 Amp MLO Amp MLO Amp MLO <br /> PHASE SUMMARY (WATTS) PHASE SUMMARY (WATTS) PHASE SUMMARY (WATTS) <br /> CKT. BKR DESCRIPTION A B C A B C DESCRIPTION BKR CKT. CKT. BKR DESCRIPTION A B C A B C DESCRIPTION BKR CKT. CKT. BKR DESCRIPTION A B C A B C DESCRIPTION BKR CKT. <br /> 1 20/1 RECEPTS ELEC,STOR.,WEIGHT 1,260 1,500 DED RECEPT CONCESSION 20/1 2 1 20/1 REF-1 667 1,872 ODU-1 30/2 2 1 90/3 PHP-1 18,282 3,598 LTG- CENTRAL TO SOUTH SIDE 20/1 2 <br /> 3 20/1 DED RECEPT IDF 360 1,500 DED RECEPT CONCESSION 20/1 4 3 20/1 REF-2 667 1,872 - - 4 3 - - 18,282 3,761 LTG- CENTRAL TO NORTH SIDE 20/1 4 <br /> 5 20/1 DED RECEPT IDF 360 1,500 DED RECEPT CONCESSION 20/1 6 5 20/1 REF-3 83 1,872 ODU-2 30/2 6 5 - - 18,282 770 EXT BLDG MTD LTG 20/1 6 DRAWN: <br /> 7 20/1 RECEPTS GYM 1,080 1,500 DED RECEPT CONCESSION 20/1 8 7 20/1 REF-4 83 1,872 - - 8 7 90/3 PHP-2 18,282 SPARE 20/1 8 <br /> 9 20/1 SCOREBOARD 1,200 1,500 DED RECEPT CONCESSION 20/1 10 9 20/1 REF-5 667 1,903 HP-1 20/2 1 10 9 - - 18,282 SPARE 20/1 10 CHECKED: <br /> 11 20/1 SCOREBOARD 1,200 1,500 DED RECEPT CONCESSION 20/1 12 11 1 20/1 REF-6 667 1,903 - - 12 11 1 - - 18,282 SPARE 20/1 12 <br /> 13 20/1 MOTORIZED BASKETBALL HOOP 1,323 540 RECEPTS CONCESSIONS&TICKETS 20/1 14 13 15/2 FC-1 686 1,903 HP-2 20/2 14 13 60/3 PHP-3 11,745 1,829 PHP-3 (POWER EXHAUST) 15/3 14 REVISIONS: <br /> 15 20/1 MOTORIZED BASKETBALL HOOP 1,323 720 RECEPTS CONCESSIONS 20/1 16 15 - I- 686 1,903 1- - 16 15 - - 11,745 1,829 - - 16 1 01/03/20 DSA CORRECTIONS <br /> 17 20/1 MOTORIZED BASKETBALL HOOP 1,323 200 LIGHTING CONTROL PANEL LCP 20/1 18 17 15/2 FC-2 686 125 CP-1 20/1 18 17 - - 11,744 1,829 - - 18 <br /> 19 20/1 MOTORIZED BASKETBALL HOOP 1,323 200 FIRE ALARM CONTROL PANELFACP[l] 20/1 20 19 - - 686 600 INTERACTIVE DISPLAY PANEL 20/1 20 19 50/3 PHP-4 8,642 1,829 PHP-4 (POWER EXHAUST) 15/3 20 <br /> 21 20/1 MOTORIZED BASKETBALL HOOP 1,323 200 FIRE ALARM POWER SUPPLY FAPS[1] 20/1 22 21 20/1 SPARE 600 INTERACTIVE DISPLAY PANEL 20/1 22 21 - - 8,642 1,829 - - 22 <br /> 23 20/1 MOTORIZED BASKETBALL HOOP 11323 1 1,080 ROOF MAINT. RECEPTS 20/1 24 23 20/1 SPARE SPARE 20/1 24 23 - - 8,643 1,829 - - 24 <br /> 25 20/1 RECEPTS LOBBY & RESTRMS 1,080 660 MOTORIZED DOOR 20/1 26 25 20/1 SPARE SPARE 20/1 26 25 25/3 WH-1 5,000 TRANSFORMER"TG" 225/3 26 <br /> 27 20/1 RECEPTS VEST,TEAM RMS,STOR. 1,080 660 MOTORIZED DOOR 20/1 28 27 20/1 SPARE SPARE 20/1 28 27 - - 5,000 - - 28 <br /> 29 20/1 RECEPTS LOBBY, VEST,JAN,FR 720 288 DF-1 20/1 30 29 20/1 SPARE SPARE 20/1 30 29 - - 5,000 - - 30 <br /> 31 20/1 SPARE 200 FIRE SPRINKLER BELL [1] 20/1 32 31 20/1 SPARE SPACE PFB 32 PHASE TOTALS <br /> 33 20/1 SPARE SPARE 20/1 34 33 20/1 SPARE SPACE PFB 34 <br /> 35 20/1 SPARE SPARE 20/1 36 35 20/1 SPARE SPACE PFB 36 69,207 69370 66 379 DATE MAY 1312019 <br /> 37 PFB SPACE SPACE PFB 38 37 PFB SPACE 10,466 PANEL"LG2' 225/3 38 PANEL AND CIRCUIT BREAKER NOTES: DEMAND LOADS <br /> 39 PFB SPACE SPACE PFB 40 39 PFB SPACE 9,866 - - 40 [1] LIGHTING / CONTINUOUS LOAD x 125% 10,160 Watts JOB NO. 19720 <br /> 41 PFB SPACE SPACE PFB 42 41 PFB SPACE 9,206 - - 42 RECEPTACLES / OTHER x 100% 196,827 Watts <br /> PHASE TOTALS PHASE TOTALS LARGEST MOTOR x 25% 4,571 Watts SHEET TITLE <br /> AT B IC A I B I C TOTAL DEMAND LOADS 211,558 Watts <br /> 10,666 9,866 9,494 118,835118,164114,542 II TOTAL DEMAND AMPS 255 AMPS <br /> PANEL AND CIRCUIT BREAKER NOTES: DEMAND LOADS PANEL AND CIRCUIT BREAKER NOTES: DEMAND LOADS ONE LINE DIAGRAM , <br /> [1] PAINT THE BREAKER RED AND PROVIDE WITH LOCK-ON DEVICE LIGHTING/ CONTINUOUS LOAD x 125% Watts [1] LIGHTING/ CONTINUOUS LOAD x 125% Watts <br /> RECEPTACLES / OTHER x 100% 30,026 Watts [2] RECEPTACLES / OTHER x 100% 51,541 Watts LOAD CALCU LATI ONS, <br /> LARGO AEDEMAST ONDRx 25% Watts LOADS 30,026 Watts [3] LARGO AEDEMAST ONDRLOADS 52,017 Watts <br /> Watts PANEL SCHEDULES <br /> TOTAL DEMAND AMPS 83 AMPS I ITOTAL DEMAND AMPS 1 144 AMPS <br /> MEP ar FS / Sustainability / CxA �O QROFESS/pNq` SHEET NO. <br /> -\N i Fti <br /> 1209 Pleasant Grove Blvd. 2 <br /> Roseville, CA 95678 W W <br /> p 916-771-0778 0, 1 7 9 E- 101 <br /> P. 9% 0 <br /> CONSULTING <br /> www.lpengineers.com FCT <br /> ectsR�GP \P <br /> Project Navigator F:\I -Project files\201 9 LP Proj \ 9-206 Meehleis- Tokay hS Gym\Electrical\E-Sheets\19206 I_E- _ (I LD Calcs).dwg I/29/2020 2:45 PM <br /> ENGINEERS Job#: 19-2061 qTF OF Cl <br /> 192061E-11 (1LD & Calcs).dwg 01/29/20 2:45:03pm ryan s <br />