<br /> ELECTRICAL SERVICE LOAD CALCULATION >> APP. 02-117806 INC: 3
<br /> SERVICE ^LUGSION ( E) MAIN SWITCHBOARD MSB
<br /> REVIEWED FOR
<br /> CEf C 220) I SS 0 FLS❑� ACS❑�
<br /> INTERIOR LIGHTING 16611 SQ. FT.@ 3.00 WATTS PER SQ. FT. 49.83 KVA I � � I DATE: 03/03/2020
<br /> I
<br /> 25%CONTINUOS LOAD FACTOR 12.46 KVA I
<br /> EXTERIOR LIGHTING 1.10 KVA I M
<br /> GENERAL PURPOSE RECEPTACLE OUTLETS 16.61 KVA
<br /> NEUTRAL (E) LODI
<br /> FIRST 10 KW OR LESS @ 100%= 10.00 KVA I LINK ELECT
<br /> REMAINDER OVER 10 KW = 6.61 @ 50%= 3.31 KVA METER
<br /> 1600AD (E) MAIN SWITCHBOARD "MSB"
<br /> HEATING, VENTILATING AND AIR CONDITIOINING EQUIPMENT 3P 1 600 AMPERES BUSSING
<br /> AIR CONDITIONING 188.70 KVA I 277/48OV, 30, 4W, 42,000 AIC O
<br /> EXHAUST FANS 0.05 KVA EA. 6 0.30 KVAI (E) U.G. SECONDARY SERVICE
<br /> SERIVE WATER HEATING 15.00 KVA I I N
<br /> EQUIPMENT AND APPLIANCES
<br /> FROM INCREMENT 1I NEUTRAL (E) (E) (E) (E) (E)
<br /> BASKETBALL HOOP LIFTS 8.00 KVA 150A ST 1000A� 600A
<br /> SCOREBOARDS 3.00 KVA I GROUND 3P 3P 3P w a
<br /> MOTORIZED DOORS 1.40 KVA I z
<br /> (E) U.G. -
<br /> PRIMARY
<br /> SERVICE
<br /> LARGEST MOTOR= 54.85 KVA @ 25%= 13.71 KVA
<br /> TOTAL SERVICE LOAD = 306.81 KVA I INCREMENT 1 LOAD (E) LOAD
<br /> (E) UTILITY SERVICE
<br /> TRANSFORMERU) h--I
<br /> 306.8 KVA @ 277/480 VOLT 3 PHASE = 369 AMPERES (PAD MOUNTED) (E) "UFER" GROUND-----')
<br /> ROUND - - - - - - o
<br /> U � �
<br /> PROVIDE 600 AMP, 277/480 VOLT, 3 PHASE, 4 WIRE SERVICE. 1 o
<br /> z I U
<br /> File: SERVLOAD.XLW N p
<br /> Ld
<br /> W
<br /> Ir"Y"I, ❑
<br /> r
<br /> I
<br /> :(6)
<br /> (E) BOND TO COLD WATERPIPE, GAS PIPE ANDBUILDING STEEL PER NEC250-104.
<br /> W/ 4#500 KCMIL CU + 1#400 KCMIL CU GND.
<br /> � w o
<br /> V �
<br /> l
<br /> PANEL ~
<br /> "HG"
<br /> 600A
<br /> 0.
<br /> 0
<br /> P.
<br /> U
<br /> O rl
<br /> /z/�1U
<br /> V
<br /> I z
<br /> . U [s-
<br /> U �
<br /> N �
<br /> +
<br /> 480V EQUIPMENT GROUNDING
<br /> A B C CONDUCTOR
<br /> DRY-TYPEKEY NOTES r TRANSFORMER "TG"
<br /> TRANSFORMER U 150 KVA
<br /> 0 L___ J 480V TO 120/208V,
<br /> r7 30, 4W
<br /> O1 INTERCEPT EXISTING PULL BOX, CONDUIT AND WIRE. MATCH z
<br /> CONDUIT AND WIRE, SPLICE AND EXTEND TO NEW I o 0
<br /> NEUTRAL DISTRIBUTION PANEL "HG". NEW DISTRIBUTION PANEL "HG" z 0
<br /> SHALL BE SIZED TO ACCOMMODATE ALL CONDUCTORS AS
<br /> SHOWN. MAKE ALL PROVISIONS AS REQUIRED.
<br /> IN
<br /> N z#z
<br /> BONDING 208Y/120V + 1#4"CU GND. CU
<br /> JUMPER MEEHLEIS
<br /> MODULAR
<br /> (N) (N) BUILDINGS, INC.
<br /> fr F_ PANEL PANEL A DESIGN BUILD
<br /> "LG1 " "LG2" COMPANY
<br /> NEAREST N G 400A 225A
<br /> GROUNDING 1303 E. LODI AVE.
<br /> ELECTRODE LODI, CA. 95240
<br /> (209) 334-4637
<br /> CA. LIC. NO. 473488
<br /> -y- NV. LIC. NO. 37887
<br /> BONDING
<br /> JUMPER
<br /> ISOLATED NEUTRAL TERMINAL
<br /> GROUNDING ELECTRODE CONDUCTOR
<br /> TRANSFORMER GROUNDING DETAIL NTS 2 PARTIAL ONE-LINE DIAGRAM - MAIN SWITCHBOARD "MSB" NTS
<br /> PANEL "LG2" PANEL "LG1" PANEL "HG"
<br /> 120/208 Volt, 3 Phase, 4 Wire 10 KAIC Rating 120/208 Volt, 3 Phase, 4 Wire 10 KAIC Rating 277/480 Volt, 3 Phase, 4 Wire 35 KAIC Rating
<br /> 225 Amp BUS CU. SURFACE Mounted 400 Amp BUS CU. SURFACE Mounted 600 Amp BUS CU. SURFACE Mounted
<br /> Amp MCB NEMA 1 Type 400 Amp MCB NEMA 1 Type 600 Amp MCB NEMA 1 Type
<br /> 225 Amp MLO Amp MLO Amp MLO
<br /> PHASE SUMMARY (WATTS) PHASE SUMMARY (WATTS) PHASE SUMMARY (WATTS)
<br /> CKT. BKR DESCRIPTION A B C A B C DESCRIPTION BKR CKT. CKT. BKR DESCRIPTION A B C A B C DESCRIPTION BKR CKT. CKT. BKR DESCRIPTION A B C A B C DESCRIPTION BKR CKT.
<br /> 1 20/1 RECEPTS ELEC,STOR.,WEIGHT 1,260 1,500 DED RECEPT CONCESSION 20/1 2 1 20/1 REF-1 667 1,872 ODU-1 30/2 2 1 90/3 PHP-1 18,282 3,598 LTG- CENTRAL TO SOUTH SIDE 20/1 2
<br /> 3 20/1 DED RECEPT IDF 360 1,500 DED RECEPT CONCESSION 20/1 4 3 20/1 REF-2 667 1,872 - - 4 3 - - 18,282 3,761 LTG- CENTRAL TO NORTH SIDE 20/1 4
<br /> 5 20/1 DED RECEPT IDF 360 1,500 DED RECEPT CONCESSION 20/1 6 5 20/1 REF-3 83 1,872 ODU-2 30/2 6 5 - - 18,282 770 EXT BLDG MTD LTG 20/1 6 DRAWN:
<br /> 7 20/1 RECEPTS GYM 1,080 1,500 DED RECEPT CONCESSION 20/1 8 7 20/1 REF-4 83 1,872 - - 8 7 90/3 PHP-2 18,282 SPARE 20/1 8
<br /> 9 20/1 SCOREBOARD 1,200 1,500 DED RECEPT CONCESSION 20/1 10 9 20/1 REF-5 667 1,903 HP-1 20/2 1 10 9 - - 18,282 SPARE 20/1 10 CHECKED:
<br /> 11 20/1 SCOREBOARD 1,200 1,500 DED RECEPT CONCESSION 20/1 12 11 1 20/1 REF-6 667 1,903 - - 12 11 1 - - 18,282 SPARE 20/1 12
<br /> 13 20/1 MOTORIZED BASKETBALL HOOP 1,323 540 RECEPTS CONCESSIONS&TICKETS 20/1 14 13 15/2 FC-1 686 1,903 HP-2 20/2 14 13 60/3 PHP-3 11,745 1,829 PHP-3 (POWER EXHAUST) 15/3 14 REVISIONS:
<br /> 15 20/1 MOTORIZED BASKETBALL HOOP 1,323 720 RECEPTS CONCESSIONS 20/1 16 15 - I- 686 1,903 1- - 16 15 - - 11,745 1,829 - - 16 1 01/03/20 DSA CORRECTIONS
<br /> 17 20/1 MOTORIZED BASKETBALL HOOP 1,323 200 LIGHTING CONTROL PANEL LCP 20/1 18 17 15/2 FC-2 686 125 CP-1 20/1 18 17 - - 11,744 1,829 - - 18
<br /> 19 20/1 MOTORIZED BASKETBALL HOOP 1,323 200 FIRE ALARM CONTROL PANELFACP[l] 20/1 20 19 - - 686 600 INTERACTIVE DISPLAY PANEL 20/1 20 19 50/3 PHP-4 8,642 1,829 PHP-4 (POWER EXHAUST) 15/3 20
<br /> 21 20/1 MOTORIZED BASKETBALL HOOP 1,323 200 FIRE ALARM POWER SUPPLY FAPS[1] 20/1 22 21 20/1 SPARE 600 INTERACTIVE DISPLAY PANEL 20/1 22 21 - - 8,642 1,829 - - 22
<br /> 23 20/1 MOTORIZED BASKETBALL HOOP 11323 1 1,080 ROOF MAINT. RECEPTS 20/1 24 23 20/1 SPARE SPARE 20/1 24 23 - - 8,643 1,829 - - 24
<br /> 25 20/1 RECEPTS LOBBY & RESTRMS 1,080 660 MOTORIZED DOOR 20/1 26 25 20/1 SPARE SPARE 20/1 26 25 25/3 WH-1 5,000 TRANSFORMER"TG" 225/3 26
<br /> 27 20/1 RECEPTS VEST,TEAM RMS,STOR. 1,080 660 MOTORIZED DOOR 20/1 28 27 20/1 SPARE SPARE 20/1 28 27 - - 5,000 - - 28
<br /> 29 20/1 RECEPTS LOBBY, VEST,JAN,FR 720 288 DF-1 20/1 30 29 20/1 SPARE SPARE 20/1 30 29 - - 5,000 - - 30
<br /> 31 20/1 SPARE 200 FIRE SPRINKLER BELL [1] 20/1 32 31 20/1 SPARE SPACE PFB 32 PHASE TOTALS
<br /> 33 20/1 SPARE SPARE 20/1 34 33 20/1 SPARE SPACE PFB 34
<br /> 35 20/1 SPARE SPARE 20/1 36 35 20/1 SPARE SPACE PFB 36 69,207 69370 66 379 DATE MAY 1312019
<br /> 37 PFB SPACE SPACE PFB 38 37 PFB SPACE 10,466 PANEL"LG2' 225/3 38 PANEL AND CIRCUIT BREAKER NOTES: DEMAND LOADS
<br /> 39 PFB SPACE SPACE PFB 40 39 PFB SPACE 9,866 - - 40 [1] LIGHTING / CONTINUOUS LOAD x 125% 10,160 Watts JOB NO. 19720
<br /> 41 PFB SPACE SPACE PFB 42 41 PFB SPACE 9,206 - - 42 RECEPTACLES / OTHER x 100% 196,827 Watts
<br /> PHASE TOTALS PHASE TOTALS LARGEST MOTOR x 25% 4,571 Watts SHEET TITLE
<br /> AT B IC A I B I C TOTAL DEMAND LOADS 211,558 Watts
<br /> 10,666 9,866 9,494 118,835118,164114,542 II TOTAL DEMAND AMPS 255 AMPS
<br /> PANEL AND CIRCUIT BREAKER NOTES: DEMAND LOADS PANEL AND CIRCUIT BREAKER NOTES: DEMAND LOADS ONE LINE DIAGRAM ,
<br /> [1] PAINT THE BREAKER RED AND PROVIDE WITH LOCK-ON DEVICE LIGHTING/ CONTINUOUS LOAD x 125% Watts [1] LIGHTING/ CONTINUOUS LOAD x 125% Watts
<br /> RECEPTACLES / OTHER x 100% 30,026 Watts [2] RECEPTACLES / OTHER x 100% 51,541 Watts LOAD CALCU LATI ONS,
<br /> LARGO AEDEMAST ONDRx 25% Watts LOADS 30,026 Watts [3] LARGO AEDEMAST ONDRLOADS 52,017 Watts
<br /> Watts PANEL SCHEDULES
<br /> TOTAL DEMAND AMPS 83 AMPS I ITOTAL DEMAND AMPS 1 144 AMPS
<br /> MEP ar FS / Sustainability / CxA �O QROFESS/pNq` SHEET NO.
<br /> -\N i Fti
<br /> 1209 Pleasant Grove Blvd. 2
<br /> Roseville, CA 95678 W W
<br /> p 916-771-0778 0, 1 7 9 E- 101
<br /> P. 9% 0
<br /> CONSULTING
<br /> www.lpengineers.com FCT
<br /> ectsR�GP \P
<br /> Project Navigator F:\I -Project files\201 9 LP Proj \ 9-206 Meehleis- Tokay hS Gym\Electrical\E-Sheets\19206 I_E- _ (I LD Calcs).dwg I/29/2020 2:45 PM
<br /> ENGINEERS Job#: 19-2061 qTF OF Cl
<br /> 192061E-11 (1LD & Calcs).dwg 01/29/20 2:45:03pm ryan s
<br />
|