Laserfiche WebLink
Vt Overfill Prevention Equipment Inspection <br /> irion/ ini DPW 61 and 71 Series Overfill Prevention Device Inspection <br /> Date: 911812018 <br /> Customer Name: 7-ELEVEN,INC. <br /> Location#: 35355 <br /> Location Address: 3202 W HAMMER LANE(N-136) ,STOCKTON CA,95209 <br /> OPW Model Number: S071 <br /> T2: T3: <br /> PART 1)Proper height setting calculation mmmm <br /> Maximum Tank Volume per:Tank Chart Agagons 10369 10369 <br /> Max shut off requirement for Flapper is 95% B M% 0.95 0.95 0.95 0.95 <br /> Multiply Maximum tank volume by 95% cgallons 9850.550 9850.550 <br /> Use tank chart or ATG to determine height of calculated volume Dinrhes 104.750 104.750 <br /> Measure top of fill riser threads,or face seal adapter Ein@ es 35.000 34.000 <br /> Tank diameter From Chart F inches 117.750 117.750 <br /> Upper Tube in tank(G) F-D=G G comes 13.000 13.000 <br /> Subtract 2 inches from upper tube in tank G-2"=K K inures 11.000 11.000 <br /> Calculated minimum upper tube length(1)K+E=I IInch. 46.000 45.000 <br /> Actual measured upper tube length(Without fill Jindres 41.625 40.500 <br /> adapter)(J) <br /> PART 2)Device certification criteria evaluation <br /> Criteria 1 No No <br /> Does the overfill prevention device meet the 95%requirement? <br /> Criteria 2 Is the Actual measured upper tube length 6.5 inches <br /> or more than the fill riser?(J must be 6.5"or more Yes Yes <br /> than E) <br /> Criteria 3 Does the overfill prevention device function as <br /> required?(Inspect the device for damage, <br /> contamination,freedom of movement, <br /> Yes Yes <br /> weakening due to wear and corrosion) <br /> PART 3)Device Certification PASS I FAIL <br /> Technician certifies that the device is operationally <br /> compliant.If the response to Criteria 1,2 and 3 above Fail Fail <br /> are YES <br /> Comments: <br /> Cannot remove nipple over drop tube on the RUL tank. <br /> t <br /> Signature of E 'li`k <br /> Technician: Dale 9/18/2018 <br /> Tim Elebeck <br /> WO: NW1-2338330 <br />