My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2526
>
2200 - Hazardous Waste Program
>
PR0514248
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 4:29:23 PM
Creation date
8/18/2020 11:10:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0514248
PE
2294
FACILITY_ID
FA0010245
FACILITY_NAME
DTE STOCKTON LLC
STREET_NUMBER
2526
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2526 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX B— STK-POP-052 A Fly Ash Pug Mill Operation with Calcium <br /> DTE SWektort.LLC. <br /> Plant Operating Procedure <br /> DTE Stockton, LLC <br /> STIP-POP-052A <br /> Fly Ash Pug Mill Operation with Calcium Chloride <br /> Revision_ 3.0 <br /> Approved= Heath Hildebrand Date-08!1812017 <br /> 1.0 PURPOSE <br /> Opezate 9s-ash pug m1l to load fh-ash from storage 91lo9 into h9cL.In the <br /> process treat fly ash for dusting and high pH <br /> 2.0 DESCRIPTION <br /> The Pug Mill mixes fly ash,35%solution of calcium chloride,and water to safely <br /> load fly ash into transport truck with minimal fugitive dusting to control ash pH <br /> below 12.45. The fly ash must be treated at a minimum flow rate of 22 gpm. If <br /> the calcium chlorideflow rate dropsto 21 gpm or less,fly ash unloading mustbe <br /> stopped until aflow rate of 22 gpm can be re-established. <br /> 3.0 SAFETY AND ENVIRONMENTAL <br /> 1. This procedure requires operating critical pieces of plant equipment that are <br /> powered by pressured hydraulic fluids and high voltage electricity_ Atailboard <br /> meeting MUST be held to ensure that the operator fully understands the <br /> system's operating parameters,task objectives,associated procedures and all <br /> hazardous conditions that exist and could occur during the performance of <br /> these tasks_ <br /> 2. Wear personal protective equipment including dust mask{PPE),goggles, <br /> safety toed loots,ear plugs,hard hat,and leather gloves. <br /> 3. Take corrective action immediately upon failure of a Reliability Check that is <br /> not perfonning its function of protecting people and equipment. <br /> 5TK-P0P-D52 Page 1 oil <br /> Biomass Ash Management Plan <br /> DTE Stockton, LLC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.