Laserfiche WebLink
Monitoring System Certification <br />Site Address: <br />UST Monitoring Site Plan <br />Miracle Mile Mart — 244 W Harding Way Stockton 95204 <br />HARDING WAY <br />J��N 0 � 2019 <br />..................... <br />P <br />— <br />........................................... <br />..... <br />P <br />TL x <br />TL x <br />F <br />F <br />V <br />v <br />...... <br />A <br />iAj <br />....................................................... <br />KEY <br />A <br />= ANNULAR <br />F = <br />FILLS <br />T <br />= TURBINE <br />P = <br />PROBE <br />..... <br />V=VAPOR <br />X <br />= SUMP SENSOR <br />LeakL—Detector <br />..................... <br />P <br />— <br />........................................... <br />..... <br />P <br />TL x <br />TL x <br />F <br />F <br />V <br />v <br />...... <br />A <br />A <br />....................................................... <br />KEY <br />A <br />= ANNULAR <br />F = <br />FILLS <br />T <br />= TURBINE <br />P = <br />PROBE <br />..... <br />V=VAPOR <br />X <br />= SUMP SENSOR <br />LeakL—Detector <br />E cY <br />�ar�'essiora7lzryft�orept��drtznrrna�sol�h�fcrfr�s�a7�zrtior�rlprrr�c�. L)rzn�•frag <br />not to cede <br />N1= Mamvay <br />B =Brine Sensor <br />I = Smart Sensor <br />S=STP <br />C = Floats & Chains <br />E = E Stop <br />_'�.r�.' ftc'riL' tif;� J;f?27rQ'b°{tJiP£it c'rtt. N{iJ' 4fSf ii18 ti% f�� C6d7�,.Y{7yP fs'GY3iiCP.?93 ff <br />Date map was drawn: 8-21-17. <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification <br />2/21/07 <br />Page 4 of 4 <br />