My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
244
>
2300 - Underground Storage Tank Program
>
PR0231137
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2021 10:47:13 AM
Creation date
8/18/2020 11:50:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231137
PE
2361
FACILITY_ID
FA0001554
FACILITY_NAME
MIRACLE MILE MARKET
STREET_NUMBER
244
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13708014
CURRENT_STATUS
01
SITE_LOCATION
244 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br />Site Address: <br />UST Monitoring Site Plan <br />Miracle Mile Mart — 244 W Harding Way Stockton 95204 <br />HARDING WAY <br />J��N 0 � 2019 <br />..................... <br />P <br />— <br />........................................... <br />..... <br />P <br />TL x <br />TL x <br />F <br />F <br />V <br />v <br />...... <br />A <br />iAj <br />....................................................... <br />KEY <br />A <br />= ANNULAR <br />F = <br />FILLS <br />T <br />= TURBINE <br />P = <br />PROBE <br />..... <br />V=VAPOR <br />X <br />= SUMP SENSOR <br />LeakL—Detector <br />..................... <br />P <br />— <br />........................................... <br />..... <br />P <br />TL x <br />TL x <br />F <br />F <br />V <br />v <br />...... <br />A <br />A <br />....................................................... <br />KEY <br />A <br />= ANNULAR <br />F = <br />FILLS <br />T <br />= TURBINE <br />P = <br />PROBE <br />..... <br />V=VAPOR <br />X <br />= SUMP SENSOR <br />LeakL—Detector <br />E cY <br />�ar�'essiora7lzryft�orept��drtznrrna�sol�h�fcrfr�s�a7�zrtior�rlprrr�c�. L)rzn�•frag <br />not to cede <br />N1= Mamvay <br />B =Brine Sensor <br />I = Smart Sensor <br />S=STP <br />C = Floats & Chains <br />E = E Stop <br />_'�.r�.' ftc'riL' tif;� J;f?27rQ'b°{tJiP£it c'rtt. N{iJ' 4fSf ii18 ti% f�� C6d7�,.Y{7yP fs'GY3iiCP.?93 ff <br />Date map was drawn: 8-21-17. <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification <br />2/21/07 <br />Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.