Laserfiche WebLink
SWRCB, January 2006 <br />Spill Bucket Testing Report Form <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: AFFORDA TEST 416 2"d Street Galt, CA 95632 (209) 744-0112 Fax: (209) 744-0116 <br />Technician Conducting Test: ❑ Ed Stearns ❑ Zane A. Nimmo ❑ David A. Winkler ® Felix G. Ramirez <br />8883080 -UT 8883064 -UT 8883059 -UT 8883072 -UT <br />Credentialsl: ®ICC Service Tech. ®SWRCB Tank Tester <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used: ®Hydrostatic ❑Vacuum El Other <br />Test Equipment Used: TAPE / H2O <br />Equipment Resolution: 1/16 <br />Facility Name: <br />Facility Address: <br />MIRACLE MILE MARKET Date of Testing: 08-2248 <br />244 W HARDING WAY STOCKTON, CA 95204 <br />Facility Contact: <br />1 87 <br />Phone: <br />Date Local Agency Was Notified of Testing:07-2648 <br />Name of Local Agency <br />Inspector (if present during testing): SAN JOAQUIN CO STACY <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: AFFORDA TEST 416 2"d Street Galt, CA 95632 (209) 744-0112 Fax: (209) 744-0116 <br />Technician Conducting Test: ❑ Ed Stearns ❑ Zane A. Nimmo ❑ David A. Winkler ® Felix G. Ramirez <br />8883080 -UT 8883064 -UT 8883059 -UT 8883072 -UT <br />Credentialsl: ®ICC Service Tech. ®SWRCB Tank Tester <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used: ®Hydrostatic ❑Vacuum El Other <br />Test Equipment Used: TAPE / H2O <br />Equipment Resolution: 1/16 <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc. <br />1 87 <br />2 91 <br />3 <br />4 <br />Bucket Installation Type: <br />® Direct Bury <br />❑ Contained in Sump <br />® Direct Bury <br />❑ Contained in Sump <br />❑ Direct Bury <br />❑ Contained in <br />Sump <br />❑ Direct Bury <br />❑ Contained in <br />Sum <br />Bucket Diameter: <br />11 <br />11 <br />Bucket Depth: <br />14 <br />14 <br />Wait time between applying <br />vacuum/water and start of test: <br />Test Start Time (Ti): <br />900 <br />900 <br />Initial Reading (Ri): <br />13 1/2 <br />13 <br />Test End Time (TF): <br />1000 <br />1000 <br />Final Reading (RF): <br />13 1/2 <br />13 <br />Test Duration (TF — Ti): <br />1 HOUR <br />1 HOUR <br />Change in Reading (RF - RI): <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for• failed tests) <br />OPW BUCKETS <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature: <br />Date:08-22-18 <br />State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />may be more stringent. <br />