Laserfiche WebLink
Nave <br /> CLOSURE COST ESTIMATES Page 1 <br /> SIGMA CIRCUITS , INC. <br /> STOCKTON DIVISION / CORE ( FIELD) SITE <br /> Description Quan . UOM* COST/UOM* TOTAL <br /> A. Costs for In-House Treatment : SUBTOTALS: <br /> Waste in Containers 150 G $0 .05 $8 <br /> Waste in Tanks 1000 G $0 .05 $50 <br /> Time Required 3 H $12 . 50 $38 <br /> Rinse Water 15000 G $0 .013 $195 <br /> Time Required 8 H $12 . 50 $100 $390 <br /> B. Costs for In-House Decontamination : <br /> Containers 1 H $12 . 50 $13 <br /> Tanks 60 H $750 <br /> Ancillary Eqt . 16 H $200 <br /> Structures/Buildings 8 H $100 <br /> Additional Eqt . 8 H $100 $1 , 163 <br /> C. Costs for Offsite Removal /Disposal : <br /> Containers 4 E $50 .00 $200 <br /> Tanks 1 E $75 .00 $75 <br /> Decon Wastewater 10000 G $2 . 25 $22 , 500 $22 , 775 <br /> D. Transportation Costs : <br /> Sludge shipment 2 T $300 . 00 $600 $600 <br /> E . Sampling & Documentation : <br /> Soil Sampling $3 , 000 <br /> Surface Sampling/verif . $500 <br /> Wastewater Sampling/verif . $1 , 000 $4 , 500 <br /> F . Documentation Reporting/Certification : <br /> Summary Reporting $2 , 000 <br /> Certification $2 , 000 $4, 000 <br /> SUBTOTAL -- Parts A thru F : $33 , 428 <br />