Laserfiche WebLink
Tyco Stockton '"O <br /> FTU Closure Costs <br /> A.Costs for In House Treatment <br /> Description Quantity UOM Cost/UOM Sub-total Total <br /> Waste in containers 150 Gal. $0.60 $90.00 - <br /> Waste in Tanks 1,000 Gal. $0.60 $600.00 <br /> Labor 3 Hrs. $10.00 $30.00 <br /> Rinse Water,Decon.water 19,500 Gal. $0.01 $273.00 <br /> Labor 8 Hrs. $10.00 $80.00 $1,073.00 <br /> b. <br /> B.Costs for In House Decontamination <br /> Description Quantity UOM Cost/UOM Sub-total Total <br /> Containers 1 Hrs. $10.00 $10.00 <br /> Tanks 60 Hrs. $10.00 $600.00 <br /> Ancillary Equipment 16 Hrs. $10.00 $160.00 $770.00 <br /> C.Cost for Transportation and Offsite Disposal <br /> Description Quantity UOM Cost/UOM Sub-total Total <br /> Containers 4 Each $50.00 $200.00 <br /> Tanks 1 Each $75.00 $75.00 <br /> Decontamination Water 5,500 Gal. $2.70 $14,850.00 $15,125.00 <br /> D.Transportation Costs <br /> Description Quantity UOM Cost/UOM Sub-total Total <br /> Sludge Shipment 4 Ton $300.00 $1,200.00 $1,200.00 <br /> E.Sampling&Documentation <br /> Description Quantity UOM Cost/UOM Sub-total Total <br /> Soil Sampling $3,600.00 <br /> Surface Sampling $600.00 <br /> Waste Water Sampling $1,200.00 <br /> Certification $2,400.00 <br /> Summary Reporting $2,400.00 $10,200.00 <br /> Estimated Closure Costs $28,368.00 <br /> u <br /> a <br /> NW �� <br />