My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DUPONT
>
1351
>
4800 – General/Other Program
>
PR0528782
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 5:11:44 PM
Creation date
8/19/2020 4:45:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4800 – General/Other Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0528782
PE
1863
FACILITY_ID
FA0016553
FACILITY_NAME
DREYERS GRAND ICE CREAM
STREET_NUMBER
1351
STREET_NAME
DUPONT
STREET_TYPE
CT
City
MANTECA
Zip
95336-6004
APN
22121019
CURRENT_STATUS
01
SITE_LOCATION
1351 DUPONT CT
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJ O A Q U I N Environmental Health Department <br /> COUNTY— <br /> (14)The name, mailing address, and the telephone number of the contractor who prepared the RMP (if any): <br /> This could also be an environmental consultant or engineer. If the RMP was prepared by an employee of <br /> the facility,then leave blank. Enter the information if applicable. <br /> (15)Source or parent company e-mail address (optional): Enter the current information. <br /> (16)Source homepage address (optional): Enter the current information. <br /> (17)Phone number at the source for public inquiries (optional): Enter the current information. <br /> (18)Local Emergency Planning Committee (LEPC)(optional):This is"Inland Region IV"for San Joaquin County. <br /> (19)OSHA Voluntary Protection Program status (optional): There are three rankings for the program (Star, <br /> Merit and Demonstration) <br /> (20)The type and reason for any changes being made to a previously submitted RMP. The types of changes <br /> to RMP are categorized as follows: <br /> Updates and re-submissions, CCR, Section 2745.10: <br /> At least once every five years from the date of its initial submission <br /> No later than three years after a newly regulated substance is first listed by USEPA or OES. <br /> No later than the date on which a new regulated substance is first present in an already covered <br /> process above a threshold quantity. <br /> No later than the date on which a regulated substance is first present above a threshold quantity <br /> in a new process. <br /> Within six months of a change that requires a revised process hazard analysis or hazard review. <br /> Within six months of a change that requires a revised offsite consequence analysis as provided <br /> in CCR,Section 2750.7:the offsite consequence analysis shall be updated at least once every five <br /> years and if changes in processes, quantities stored or handled, or any other aspect of the <br /> stationary source might reasonably be expected to increase or decrease the distance to the <br /> endpoint by a factor of two or more, a revised analysis shall be completed within six months of <br /> the change. <br /> Within six months of a change that alters the program level that applied to any covered process. <br /> 10 of 22 <br /> Doc ID:6a6ea4fac281501cd30efa4128b75fd8a1870d1a <br />
The URL can be used to link to this page
Your browser does not support the video tag.