Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CE=RTIFICATION FORM (Page a of s) <br /> VIII . MONITORING SYSTEM AND PROGRAMMING <br /> Fsectionst becompleted if monitoring panel is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational? ❑X ❑ E <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, <br /> functional tested , and confirmed o rational? ❑ ❑ <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with <br /> their proper operation? ❑X ❑ ❑ <br /> Was monitoring system set-up reviewed to ensure proper settings? O ❑ 1:1Was the monitoring panel's backup battery visually inspected, functionally tested, and confirmed operational? 0 El ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the underodispenser containment? 21 El El <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically <br /> disconnected? N 1:1 El <br /> Does the turbine automatically shut doom if the piping secondary containment monitoring system detects a leak? ® ElWhich sensors initiate positive shut down? (Check all that apply.) 0 Sump Q Under-Dispenser Containment <br /> If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. , modem) operational? ❑ ❑ <br /> For any answer of "N" above, describe in Section IX how and when these deficlencles were or will be corrected. <br /> IX. COMMENTS <br /> X. IN-TANK GAUGING TESTING <br /> ❑ Check this box if tank gauging is used only for Inventory control. (Do not complete this section.) <br /> ❑ Check this box if NO tank gauging equipment is installed. (Do not complete this section.) Y N NA <br /> This section must be completed if In•tank gauging is used to perform leak detection monitoring, <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination, including testing for <br /> round faults? 0 ❑ ❑ <br /> Were all in•tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally <br /> tested, and confirmed operational? X ❑ ❑ <br /> Was accuracy of system's product level readings tested? Q ❑ ❑ <br /> Was accuracy of system's water level readings tested? Q ❑ ❑ <br />€ Were all probes reinstalled properly? Q ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? Q ❑ ❑ <br /> For any answer of "N" above, describe in Section Xt how and when these deficiencies were or will be corrected. <br /> s <br /> XI . COMMENTS <br /> Y = Yes, N = No, NA = Not Applicable <br /> i <br /> f <br /> f <br />