Laserfiche WebLink
A J O A U IN Environmental Health Department <br /> OUITY <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> 7-ELEVEN INC#19976 1399 N MAIN ST, MANTECA September 05, 2019 <br /> Other Violations <br /> 2010 1 See below Unlisted General violation ❑V ❑R ❑COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 105 CCR 2632(d)(1), 2634(d) Failed to have an approved UST monitoring plan. <br /> The monitoring plans for both tanks incorrectly list the monitoring panel for the tank, piping, and UDC monitoring as <br /> a TLS 350. The panel on site is a TLS 350 Plus. <br /> The monitoring plan must be uploaded to the California Environmental Reporting System (CERS). Immediately log <br /> into CERS, make the necessary changes, and submit for review by the EHD. <br /> This is a minor violation. <br /> 121 CCR 2712(f) Failed to submit a written response within 30 days of receiving an inspection report. <br /> An inspection was last done on 9/17/18 and an inspection report was issued identifying information to be submitted <br /> to bring this site into compliance. This information was required to be submitted by 10/17/18. This information was <br /> not received. An operator that receives an inspection report shall have 30 days to submit a written response that <br /> includes a statement documenting corrective actions taken or proposing corrective actions which will be taken. <br /> Ensure that a written response documenting corrective actions taken or proposed is submitted within 30 days of <br /> receiving an inspection report. <br /> This is a repeat violation, Class II. <br /> 124 CCR 2637.2(d&e), 2665(a&b)"Overfill Prevention Equipment Inspection Report Form" not submitted within 30 days <br /> of inspection. <br /> Overfill prevention testing was performed on October 11, 2018 and a test report was submitted on January 7, 2019, <br /> 58 days late. A copy of the test report must be submitted within 30 days of the tests. Take all necessary precautions <br /> to ensure testing and submittal of test reports are performed in a timely manner. <br /> This is a minor violation. <br /> 204 CCR 2712(1) Current monitoring plan approved by the EHD not found on site. <br /> An approved/current copy of the monitoring plans were not available for inspection. A copy of these plans shall be <br /> accessible on site at all times. Immediately locate and retain a copy on site. <br /> This is a minor violation. <br /> 205 CCR 2712(1), 2634(e) Failure to submit a current UST Response Plan and have it available onsite. <br /> An approved/current copy of the response plans were not available for inspection. A copy of the response plan shall <br /> be accessible on site at all times. Immediately locate and retain a copy on site. <br /> This is a minor violation. <br /> FA0000916 PR0231435 SCO01 09/05/2019 <br /> EHD 23-01 Rev.8/22/2019 Page 4 of 5 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />