Laserfiche WebLink
11 lee I el�ell e" leey <br /> 11 l ell � � „ <br /> _�v, lve <br /> — ._ . _w <br /> OPW 71SO Overfill Materials Ino por'tant '' <br /> Prevet <br /> n ion !Pelves , <br /> In order to prevent product <br /> Valve Body: Cast aluminum spillage from the Underground <br /> The CARE-certified OPW 71 SO Storage Tank (UST), properly <br /> Float: Nitrile rubber, closed cell foam maintained delivery equipment <br /> vapor-tight Overfill Prevention Valve Y and a proper connection at the <br /> is designed to prevent the overfill of <br /> Valve: Aluminum tight fill adaptor are essential. <br /> underground storage tanks by providing Seals: Viton® i Delivery personnel should <br /> be managed and trained <br /> a positive shut-off of product delivery. Upper & lower Drop Tube: Aluminum to inspect delivery elbows <br /> The shut-off valve is an integral part of Plastic parts: Acetal and hoses for damaged and <br /> the drop tube used for gravity filling . ' missing parts. They should <br /> Hardware : Stainless steel �� always make certain there <br /> The OPW 71 SO allows easy installation Is a positive connection <br /> (without breaking concrete) and requires l�lg between the adaptor and <br /> FeatUreS f elbow. If delivery equipment <br /> no special manholes. ® Simple, Easy and Quick is not properly maintained, <br /> The OPW 71 SO is a vapor-tight two- Installation — no excavation or or the elbow is not securely <br /> stage shut-off valve. When the liquid s ecial manholes re uired . coupled to the adaptor, a <br /> P q serious spill may result when <br /> level rises to about 95 % of tank 40� Economical — costs a fraction the DPW 7150 closes, causing <br /> capacity, the valve mechanism is of expensive, complicated and a hazard and environmental <br /> released, closing automatically with p p contamination. <br /> the flow. This reduces the flow rate to difficult to install valves. <br /> approximately 5 gpm through a bypass + Furnished Complete — supplied NOTE: The OPW 7150 is <br /> with new upper and lower drop tubes, designed for use on tightAll <br /> valve. The operator may then stop the Pp P gravity drop applications only. <br /> filling process and disconnect and drain mounting hardware and thorough = Do not use for pressure <br /> the delivery hose. As long as the liquid instructions for quick job site time. lt fill applications. <br /> exceeds the 95 % level, the valve will 40& Completely Automatic Operation <br /> close automatically each time delivery — no prechecks to perform, no resets ® Retrofits Directly — for both new <br /> is attempted . and no overrides to be broken and existing tanks with 4 " fill risers. <br /> If the delivery is not stopped and the or abused . 4so Quick Drain Feature — <br /> liquid rises to about 98 % of tank ® No Pressurization of the Tank — automatically drains hose when head <br /> capacity, the bypass valve closes operates directly from liquid level . pressure is relieved . <br /> completely. No additional liquid can flow 44Will Accept a Dipstick � Best Flow Rate in The Industry* <br /> into the tank until the level drops below for Gauging <br /> a reset point. ' DPW Test Lab results <br /> NOTE : The 71 SO Overfill Prevention <br /> Valve can be adjusted to shutoff at any Advantages of Overfill Prevention <br /> desired tank capacity. Please contact the Compared to Overfill Warning Systems: <br /> Authority Having Jurisdiction (AHJ) and 4*p Completely Automatic faster fill times and reducing <br /> review local, state, and national codes to Operation — does not rely on the spill risk . <br /> determine the regulatory requirements alertness or speed of response of the ® Speeds Delivery Operations <br /> governing shut-off capacity in your delivery attendant for certainty of — product flows unimpeded into <br /> region, as well as take into account overfill prevention . <br /> other considerations such as extreme p the tank until the hose " kick " that <br /> tank tilt. In all cases, the upper tube 4P Keeps the Top of UST " Dry," accompanies the valve shut-off <br /> must protrude into the tank at least per EPA Requirements — provides a clear signal that the <br /> 61 /2 to ensure that the valve can shut eliminating possible leaks at loose liquid has reached the shut-off level . <br /> off flow into the tank completely before bung fittings and the need for ® Simple and Inexpensive <br /> the top of the tank is wetted as per double containment on vent lines. Installation — in both two-point <br /> EPA requirements. �ar Does Not Rely on Pressure in and coaxial fill applications, no <br /> the UST to Stop Flow — allowing additional excavation, manholes or <br /> 71 SO Instruction Sheet Order vent piping are required . <br /> Number: H15524PA <br /> .a = �� <br /> Look for this label for <br /> Listin s and authentic OPW EV(t <br /> g Approved products. <br /> iBorU <br /> Certifications Resourcesad <br /> onw OPW 71 SO is EVR Approved for E85 <br /> 104 �..; T� 3NWINt i , 11 <br /> I lee ell 'e <br /> C <br /> . � � <br />