Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page s of 6) <br /> XII . LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors (LLD) are NOT installed . (Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? 0 ❑ [] <br /> (Check all that apply.) Simulated leak rate verified: ® 3 GPH E] 0 . 1 GPH E] 0. 2 GPH © ❑ ❑ <br /> Was the testing apparatus properly calibrated? <br /> For emergency generator tank systems , does the LLD create an audible and visual alarm when a leak is detected ? ❑ ❑ <br /> For mechanical LLDs , does the LLD restrict the flow through the pipe when a leak is detected? ® ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off when a leak is detected? ❑ ❑ 0 <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected ? ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? El ❑ ❑ <br /> For electronic LLDs , have all accessible wiring connections been visually inspected for kinks and breaks? El1:1 ZI <br /> Were all items on the equipment manufacturer's maintenance checklist completed ? El ❑ <br /> Were all LLDs confirmed operational within regulatory requirements ? W1 10 1 ❑ <br /> For any answer of "N " above, describe in Section Xlll how and when these issues were or will be corrected. <br /> XIII . COMMENTS <br /> XIV. VACUUM / PRESSURE 1 HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ® Check this box if VPH monitoring is NOT used . (Do not complete this section .) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type (Mark all that apply. ) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br /> Sensor Functionality Interstitial Communication <br /> Sensor ID Component(S) Monitored By This Sensor Test Test <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> El Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> How was interstitial communication verified? ❑ Simulated Leak at Far Ends of the Interstitial Space ❑ Visual Inspection <br /> ❑ Other (Describe the method in section XV below.) 01 Gau e <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? Yes ❑ No (Describe the reason in section XV below.) <br /> For any answer of "Fall' above, describe in Section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH = Gallons Per Hour, Y = Yes, N = No, NA = Not Applicable, VPH = VacuumiPressumlHydrostatic, ID = Identification <br />