My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 12:55:35 PM
Creation date
8/20/2020 2:15:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71 SO Overfill Valve In Tank Shut off Level Worksheet <br /> Irttportant: This Is meant to be supplemental worksheet and not a substitute to following the Installation <br /> manual instructions. All length measurements are in inches. Please contact the Authority Having #udsdlc- <br /> tlon (ANA and review local, state, and national codes to determine the regulatory requirements governing <br /> shutmoff capacity in your region, as well as take into account other considerations such as extreme tank ViL <br /> 'fake the following measurements with the valve In- <br /> stalled In the tank: <br /> Distance from the 7150 inlet tube flange to the cast ^ <br /> lug in the 71 SO body (see figures), upper tube length, <br /> Note: the Upper Tube Length must be at least 16" to in� <br /> elude the protective bends the tube. <br /> (D) w 'b�! I <br /> Distance from the 71 SO inlet tube flange to the top and �rm"T <br /> bottom of lower, bg,rvalve length . <br /> (W) = (a) <br /> (U) = 10 r Upper <br /> Tube <br /> Distance from the 71 SO inlet tube flange to the bottom <br /> of the tank. Note: If a tank bottom protector is present It <br /> may be necessary to add this thickness to dimension <br /> (OPW 6111 & 61 TP models add 0.61 (W) Valve <br /> (B) MM _� length, <br /> bottom of <br /> From the tank calibration chart provided by tank manu- cut <br /> facturer find the dipstick number (l) which corresponds <br /> to the 100°6 volume. (B} <br /> To Tank <br /> 1 . To determine shut-off percentage: (Y) <br /> Subtract upper tube length (D) from distance to tank (U) Valve Tank <br /> Chart <br /> bottom (B) ,� + � Length, 1 096 <br /> � � 9 <br /> ( ) A (B) - ( D) 2" _. s ) top of cut Volume <br /> Dipstick <br /> Using the tank calibration chart provided by the tank <br /> manufacturer determine the tank capacity at the cal® <br /> culated ( ) dimension and the 100% volume (Y) tank <br /> capacity, <br /> (lt) tank capacity In gallons = A4C) 1-° <br /> (Y) tank capacity in gallons = � 11 1Z1 _ <br /> 50°6 = (X) capacity ! (Y) capacity x100 <br /> Note* The overfill valve must be installed per AHJ require- <br /> ments and all applicable local, state, and national codes. If <br /> the overfill valve Is set above the allowable shut-off percent- <br /> age the overfill valve must be removed and replaced For <br /> reference 40 CFR part 280 Subpart 8 Section 250.20 overfill <br /> valves should be set to a maximum of 95%. <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.