Laserfiche WebLink
oPaUINCZ SAN 10AQUIN Environmental Health Department <br /> 2r <br /> UY, ' COUNTY <br /> Linda Turkatte , RENS , Director <br /> cgCiFoa?P Greotness grows here . Kasey Foley , OREHS , Assistant Director <br /> PROGRAM COORDINATORS <br /> Robert McClellon , REHS <br /> Jeff Carruesco , REHS , RDI <br /> Rodney Estrada , REHS <br /> Willy Ng , REHS <br /> Muniappa Naidu , REHS <br /> July 10 , 2019 <br /> Brian Grinden <br /> Tait Environmental Services Inc . <br /> 701 Park Center Dr, <br /> Santa Ana , CA 92705 <br /> Re : Shell Oil Products US — Stockton Terminal SR0079950 <br /> 3515 Navy Dr. , Stockton , CA 95203 <br /> The San Joaquin County Environmental Health Department ( EHD ) has completed the review of the <br /> application for a permit to replace the penetration fittings in the piping and transition sumps and to <br /> install a drop tube on the spill container on the underground storage tank ( UST) system at the above <br /> noted address . The permit has been approved with the following conditions : <br /> 1 . Contact the local fire department and the San Joaquin Valley Air Pollution Control District for <br /> any applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for approval prior to <br /> commencing work . All new addenda supersede the previous ones . <br /> 3 . Contact Paul Nso at (209 ) 468-3432 to arrange the following inspection appointments ( a 48- <br /> hour notice is required for inspection appointments ) . Please be aware that inspections for <br /> emergency work must be scheduled within five days of permit approval . <br /> a . Overfill prevention verification : Measurement of drop tubes to verify 95 % tank volume shut <br /> off. Verification of ball floats absent or located at a level that will not interfere with drop tube <br /> functionality . <br /> b . 24- hour hydrostatic test (or equivalent) on the piping sump and transition sump . <br /> c . If concrete will be broken near the UST or piping , a secondary containment test must be <br /> performed on the affected portions once concrete is poured in accordance with the <br /> manufacturer' s guidelines . <br /> Please be aware that the facility cannot receive fuel in the 91 tank prior to the EHD <br /> M <br /> nspection and approval . <br /> 4 . Secondary containment testing for the piping and transition sumps is required six months after <br /> installation/repair. Provide 48 hours notification to the EHD when this test is scheduled . <br /> 5 . Any individual performing the work of a service technician must meet the following <br /> qualifications : <br /> a . Possess or be employed by a person who possesses one of several permissible valid , <br /> current contractor' s licenses issued by the Contractors State License Board ( may be issued <br /> to the installation company) , or a Tank Tester' s license issued to the individual by the State <br /> Water Board , and <br /> 1868 E . Hazelton Avenue I Stockton , California 95205 1 T 209 468- 3420 1 F 209 464 -0138 1 www . sjcehd . com <br />