Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page' 5 of 6) <br /> XVI. LINE LEAK DETECTOR TESTING <br /> ( � Check this box if line leak detectors (LLD) are NOT installed . (Do not complete this section .) Y N NA <br /> This section must be completed if LLDs are installed . <br /> Was a leak simulated to verify LLD performance? r r r <br /> Check all that apply. Simulated leak rate verified : r 3 GPH r 1 . 1 GPH r 0 . 2 GPH <br /> Was the testing apparatus properly calibrated ? r r r <br /> For emergency generator tank systems , does the LLD create an audible and visual alarm when a leak is detected? r r ry <br /> For mechanical LLDs , does the LLD restrict the flow through the pipe when a leak is detected? r r <br /> For electronic LLDs , does the turbine automatically shut off when a leak is detected ? r r r <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected ? r r r <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? r r r <br /> For electronic LLDs , have all accessible wiring connections been visually inspected for kinks and breaks? r r r <br /> Were all items on the equipment manufacturer's maintenance checklist completed ? r r r <br /> Were all LLDs confirmed operational within regulatory requirements? r r r <br /> For any answer of "N " above, describe in section Xlll how and when these issues were or will be corrected. <br /> XIII; COMMENTS <br /> XIV VACUUM / PRESSURE/ HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> r Check this box if VPH monitoring is NOT used . (Do not complete this section .) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring . <br /> System Type (Mark all that apply. ) r Vacuum r Pressure r Hydrostatic <br /> Sensor lD Component(s) Monitored by this Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> How was interstitial communication verified ? r Simulated leak at far ends of the interstitial space . r Visual Inspection <br /> r Other Describe the method in section XV below. r Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? r Yes r No (Describe the reason in section XV below.) <br /> For any answer of "N " above, describe in section Xlll how and when these issues were or will be corrected. <br /> XV COMMENTS <br /> GPH = Gallons per hour, Y = Yes , N = No , NA = Not applicable, VPH = Vacuum/Pressure/ Hydrostatic , ID = Identification <br />