My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
9321
>
2300 - Underground Storage Tank Program
>
PR0231261
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2024 2:26:21 PM
Creation date
8/20/2020 3:00:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231261
PE
2361 - UST FACILITY
FACILITY_ID
FA0002890
FACILITY_NAME
QUIK STOP MARKET #120
STREET_NUMBER
9321
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
080-180-05
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
9321 N THORNTON RD STOCKTON 95209
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />GPH =Gallons Per Hour, Y = Yes, N = No, NA Not <br />MONITORING SYSTEM CERTIFICATION FORM <br />(Page 5 of <br />5) <br />XII. LINE LEAK DETECTOR TESTING <br />❑ Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section) <br />N <br />NA <br />This section must be completed if LLDs are installed, <br />Was a leak simulated to verify LLD performance? <br />FnX <br />❑ <br />❑ <br />(Check all that apply.) Simulated leak rate verified: ❑X 3 GPH E]0.1 GPH <br />E]0.2 GPH <br />Was the testing apparatus properly calibrated? <br />❑ <br />❑ <br />For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is <br />detected? <br />❑ <br />❑ <br />X❑ <br />For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? <br />❑X <br />❑ <br />❑ <br />For electronic LLDs, does the turbine automatically shut off when a leak is detected? <br />❑ <br />❑ <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />❑ <br />❑X❑ <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />❑ <br />❑ <br />X❑ <br />For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? <br />❑ <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />X <br />tEl <br />❑Were <br />all LLDs confirmed operational within regulatory requirements? <br />❑ <br />For any answer of "M' above, describe in Section Xlll how and when these issues were or will be corrected. <br />XIII. COMMENTS <br />XIV. VACUUM / PRESSURE / HYDROSTATIC MONITORING <br />EQUIPMENT TESTING <br />❑X Check this box if VPH monitoring is NOT used. (Do not complete this section) <br />This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br />System Type (Mark all that apply.) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br />Sensor Functionality <br />Interstitial <br />Communication <br />Sensor ID <br />Component(S) Monitored By This Sensor <br />Test <br />Test <br />❑ Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑Fail <br />❑ Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />How was interstitial communication verified? ❑ Simulated Leak at Far Ends of the Interstitial Space <br />❑ Visual <br />Inspection <br />❑ Other Describe the method in section XV below.) <br />❑ Gauge <br />Was the vacuum or pressure restored to operating levels in all interstitial spaces? <br />❑ <br />Yes <br />❑ <br />No (Describe <br />the reason in <br />section XV below.) <br />For any answer of "Fail" above, describe in Section XV how and when these issues were or will <br />be corrected. <br />XV. COMMENTS <br />r <br />SIR, <br />3 <br />a <br />ENVIFIONME.N <br />'A' <br />r: r3eg <br />b.. <br />r tt <br />Applicable, VPH = VacuumlPressureMydrosta6c, ID =Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.