My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
14700
>
1900 - Hazardous Materials Program
>
PR0519535
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 10:48:50 AM
Creation date
8/24/2020 5:11:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0519535
PE
1921
FACILITY_ID
FA0006674
FACILITY_NAME
OWENS-BROCKWAY GLASS CONTAINER INC
STREET_NUMBER
14700
Direction
W
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
209-240-24
CURRENT_STATUS
01
SITE_LOCATION
14700 W SCHULTE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tracy, CA 0-1 Glass, Inc. Maintenance <br /> AQUEOUS AMMONIA (19%) SCR SYSTEM <br /> MAINTENANCE SCHEDULE <br /> Shift Rounds (Visual Inspection for leaks, damage, etc.) <br /> • Aqueous Ammonia Storage Tank <br /> o Level <br /> o Pressure <br /> • Pump Skid <br /> o Pressure <br /> • Piping <br /> • Atomizing/ Control Skids <br /> o Flow <br /> Monthly <br /> • Check pressure reducer, adjust as necessary <br /> • Rotate and lubricate pumps <br /> • Check pressure relief valves for leaking/weeping <br /> Annual <br /> • Check moving parts for functional efficiency (control valves, ball valves, etc.) <br /> • Check storage tank and piping for signs of corrosion, damage or other deterioration and <br /> anchoring <br /> • Test the high and low level alarms <br /> • Test the emergency shut down switch <br /> • Calibrate ammonia sensors <br /> 5 Years <br /> • Replace the relief valves <br /> Page I A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.