My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
14700
>
1900 - Hazardous Materials Program
>
PR0519535
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 10:48:50 AM
Creation date
8/24/2020 5:11:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0519535
PE
1921
FACILITY_ID
FA0006674
FACILITY_NAME
OWENS-BROCKWAY GLASS CONTAINER INC
STREET_NUMBER
14700
Direction
W
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
209-240-24
CURRENT_STATUS
01
SITE_LOCATION
14700 W SCHULTE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task Step Comment <br /> 1. Normal startup 1 The tank is not shut down under <br /> normal operations. If a startup is <br /> required the in feed ball valve will be <br /> manually open. <br /> 2. Normal shutdown 1 The tank would not be shut down <br /> under normal operating conditions. If <br /> it is necessary to shut down the system <br /> the in feed ball valve will be manually <br /> closed. <br /> 4. Emergency Shutdown and 4.1 Manually close in feed ball <br /> Isolation valve <br /> 4.9 Follow instructions of If this situation involves fire or <br /> Emergency Response Personnel on engulfment,evacuate immediate area <br /> scene of tank and observe from safe distance. <br /> If situation involves damage to any part <br /> of the system,prepare to mitigate <br /> and/or contain escaping liquid and <br /> vapor,using appropriate PPE,if trained <br /> to do so. <br /> 5. Startup following emergency 5.1 Asses situation.Consult with <br /> shutdown and isolation. Emergency Response Personnel and <br /> Complex Management before initiating <br /> start up after emergency and/or <br /> release. <br /> Task Step Comment <br /> 1. Normal startup 1 The tank is not shut down under <br /> normal operations. If a startup is <br /> required the in feed ball valve will be <br /> manually open. <br /> 2. Normal shutdown 1 The tank would not be shut down <br /> under normal operating conditions. If <br /> it is necessary to shut down the system <br /> the in feed ball valve will be manually <br /> closed. <br /> 3. Shutdown and Isolation for 1 See Maintenance Procedures Isolation of the receiver itself is not <br /> Maintenance or Repair for the float columns,floats,and alarm probable. Float columns and alarms <br /> systems. can be individually isolated for <br /> maintenance and repair. See adjunct <br /> SOP <br /> 4. Emergency Shutdown and 4.1 Manually close in feed ball <br /> Isolation valve <br /> 4.9 Follow instructions of If this situation involves fire or <br /> Emergency Response Personnel on engulfment,evacuate immediate area <br /> scene of tank and observe from safe distance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.