My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
14700
>
1900 - Hazardous Materials Program
>
PR0519535
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 10:48:50 AM
Creation date
8/24/2020 5:11:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0519535
PE
1921
FACILITY_ID
FA0006674
FACILITY_NAME
OWENS-BROCKWAY GLASS CONTAINER INC
STREET_NUMBER
14700
Direction
W
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
209-240-24
CURRENT_STATUS
01
SITE_LOCATION
14700 W SCHULTE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Operation of Anhydrous Ammonia System <br /> 1 Owens Brockway Glass Container, Inc Section Number: TBD <br /> Process Safety Management PSM/Standard Operating <br /> Procedures/Review/Revisio <br /> n/Ammonia Tank <br /> Prepared by Revision Date: 06/15 <br /> Steven Howie, Environmental Specialist <br /> Revision Approved by: Issue Revision <br /> Mark Claire, Plant Engineer <br /> Objective: This procedure is designed to describe the Technical Operating Specifications(TOS), <br /> and to set down the Standard Operating Procedures for the safe operation of the <br /> Anhydrous Ammonia Tank <br /> Purpose: The purpose of the TOS is to provide a description of the Ammonia Tank,to define <br /> the function of the tank, its operating conditions and limits, and consequences of <br /> deviation from these limits; to describe controls and instrumentation and safety <br /> systems, and set operating alignments. The purpose of the Standard Operating <br /> Procedure (SOP) is to set down the proper steps for starting, monitoring normal <br /> operation, and stopping and restarting the system under normal and emergency <br /> conditions. <br /> Concerns: Very careful attention to valve positions,temperature, and pressure levels is <br /> extremely important to the successful completion of these procedures. Deviations <br /> from normal operating limits could cause personal injury or death, spall to <br /> catastrophic release of ammonia or environmental damage or evacuation, or injury <br /> to persons. We see to prevent incidents such as: <br /> Injury to operators and others in the area. <br /> Damage to the Tank Structure <br /> Release of any quantity of Anhydrous Ammonia. <br /> The company Lockout/Tagout program shall be followed when taking the system <br /> out of service, while maintaining the tank, and while returning it to service. I line- <br /> breaking is required, all line-=breaking precautions described in the company Line- <br /> Break Policy shall be observed. Additionally, proper PPE shall be immediately <br /> available, or warn in response to the threat level posed by the work and <br /> circumstances. <br /> Department: Maintenance <br /> Operator: Any qualified 118 maintenance employee <br /> Equipment: Ammonia Tank with associated piping, tubing, controls and other appurtenances. <br /> Location Located next to the north and west wall at the west end of the ally way between <br /> the B and C basements. <br /> Initial Date of October 2009 <br /> Development: <br /> Revisions: June 2015 <br /> Reviewed by: I Plant engineer and Environmental Specialist—June 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.