My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
14700
>
1900 - Hazardous Materials Program
>
PR0519535
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 10:48:50 AM
Creation date
8/24/2020 5:11:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0519535
PE
1921
FACILITY_ID
FA0006674
FACILITY_NAME
OWENS-BROCKWAY GLASS CONTAINER INC
STREET_NUMBER
14700
Direction
W
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
209-240-24
CURRENT_STATUS
01
SITE_LOCATION
14700 W SCHULTE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tracy, CA 0-1 Glass, Inc. Maintenance <br /> MAINTENANCE <br /> Revision History <br /> Rev. # Description of Change Date Revised By <br /> 0 Initial issue 9/10/2020 PSM RMP <br /> Solutions <br /> Purpose <br /> To prevent or minimize the consequences of catastrophic releases of aqueous ammonia 19% or <br /> anhydrous ammonia, it is important to ensure system equipment is maintained properly. The <br /> purpose of a mechanical integrity program is to maintain system equipment so that a <br /> catastrophic release of aqueous ammonia 19%or anhydrous ammonia is avoided. The emphasis <br /> should be on preventive and predictive maintenance rather than breakdown maintenance. <br /> This document summarizes how 0-1 Glass, Inc. complies with the mechanical integrity requirements <br /> for the aqueous ammonia (19%) SCR process for NOx reduction and the anhydrous ammonia <br /> neutralization process. 0-1 Glass, Inc. has established this mechanical integrity plan for all <br /> equipment and system components that contain aqueous ammonia 19% and anhydrous <br /> ammonia, plus those key support or utility systems and equipment which are considered critical <br /> to the safety and reliability of the system. <br /> References <br /> 1) 19 CCR 2755.5, California Accidental Release Prevention Program, Maintenance. <br /> Components of the Mechanical Integrity Plan <br /> This plan consists of six components and they are desribed as follows. <br /> 1) Ammonia Equipment and Instrumentation Documentation <br /> The following steps were taken to identify the aqueous ammonia and anhydrous ammonia <br /> equipment and instrumentation included in the mechanical integrity program: <br /> 1) A thorough review was conducted of the system drawings such as piping and instrument <br /> Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.