My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 4:36:01 PM
Creation date
8/25/2020 11:10:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231320
PE
2361
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
01
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEMP1200 -� -- - ---- - --- --- -- -- -- - — — _._ ,. - _ - - --- - --- <br /> NOTE: To do this , direct the fluid flow into a NOTE The ELLD may cycle the pump on/ <br /> graduated cylinder while timing for 60 seconds. off several times before alarming or shutting <br /> down the pump . <br /> 9. Continue to adjust the size of the test appa- _- - - <br /> ratus leak orifice until the desired volume is 13 . Record the number of test cycles observed <br /> achieved . To expedite calibration , make coarse before alarm/shut down occurs . <br /> adjustments by measuring the volume of fluid <br /> that corresponds to the 15-second time interval NOTE: When required, perform a 0.2 gph or <br /> indicated in Table 9- 1 . The final calibration 0. 1 gph simulated leak test on ELLDs . Follow <br /> of the test apparatus leak orifice must be con- the manufacturer 's test parameters . The ELLD <br /> ducted by measuring the appropriate volume of safety and test set up procedures for 3 .0 gph <br /> fluid over the full 60-second timeframe, simulated leak test should be followed. <br /> 10. Without adjusting the test apparatus leak ori- <br /> fice after it has been properly calibrated in Step ti9. 2. 7 Pass/Fail Criteria. If the ELLD has iden- <br /> 9 , hang up the dispenser nozzle, allowing the fied the simulated leak by generating an alarm <br /> pump to turn off. and, if applicable, shutting down the STP, the <br /> ELLD passes the test. <br /> 11. While directing the fluid flow from the leak <br /> test apparatus into the test can, observe that the If the ELLD has not identified the simulated leak <br /> ELLD turns the pump on and pressurizes the by generating an alarm and, if applicable , shutting <br /> line. down the STP, the ELLD fails the test. <br /> 12. Confirm that the simulated leak condition If the STP does not properly cycle on/off under <br /> causes the electronic line leak detector to alarm normal fuel system operating conditions, the ELLD <br /> and/or shut down the pump. fails the test. <br /> NOTE: If the leak detector initially fails the <br /> � . test, repeat the test procedure before declaring <br /> the test result as "fail . " <br /> 9 . 2, 8 Restore the System to Operational Con- <br /> dition . Upon completion of the test: <br /> • Shut off power to the STP and perform lockout/ <br /> tagout procedures on the circuit breakers . Allow <br /> 4' line pressure to bleed off to zero and close the <br /> shear valve. <br /> 7 Remove the test apparatus from the shear valve <br /> body and properly reinstall the plug into the <br /> shear valve test port. <br /> Reestablish power to the STP, tum dispenser <br /> r on and confirm that no leaks are present in the <br /> system. <br /> Dispense product into the test can to remove any <br /> �t! air from the line and confirm that full product <br /> flow is achieved . <br /> >1 <br /> FIGURE 943 . The test port on the shear valve under the <br /> dispenser provides a location to simulate a leak in the <br /> underground piping system. <br /> pei .org <br />
The URL can be used to link to this page
Your browser does not support the video tag.