My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 4:36:01 PM
Creation date
8/25/2020 11:10:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231320
PE
2361
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
01
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERM 200 "17 <br /> ELECTRONICAPPENDIX Ca9 <br /> WECHANICAL AND O - <br /> � �PERFORMANCE TESTS <br /> Facility Name: Owner. <br /> Address: Address: <br /> City, State, Zip Code: City, State , Zip Code: <br /> Facility I .D. #: Phone #: <br /> Testing Company: Phone #: Date: <br /> This data sheet can be used to test mechanical line leak detectors (MLLD) and electronic line leak detectors (ELLD) with submersible <br /> turbine pump (STP) systems. See PEVRP1200 Sections 9.1 and 9 .2 for test procedures. <br /> Line Number <br /> Product Stored <br /> Leak Detector Manufacturer <br /> Leak Detector Model <br /> Type of Leak Detector ❑ MLLD ❑ MLLD ❑ MLLD ❑ MLLD ❑ MLLD ❑ MLLD <br /> GI ELLD 1 ❑ ELLD ❑ ELLD ❑ ELLD ❑ ELLD ❑ ELLD <br /> MLLD (ALL PRESSURE MEASUREMENTS ARE MADE IN PSIG) <br /> STP Full Operating Pressure <br /> Check Valve Holding Pressure <br /> Line Resiliency (ml) (line bleed back vol- <br /> ume as measured from check valve hold- <br /> ing pressure to 0 psig) <br /> Step Through Time in Seconds (time the <br /> MLLD hesitates at metering pressure <br /> before going to full operating pressure <br /> as measured from 0 psig with no leak <br /> induced on the line) <br /> Metering Pressure (STP pressure when <br /> simulated leak rate 3 gph at 10 psig) <br /> Opening Time in Seconds (the time the <br /> MLLD opens to allow full pressure after <br /> simulated leak is stopped) <br /> Does the STP pressure remain at or <br /> below the metering pressure for at least ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No <br /> 60 seconds when the simulated leak is <br /> Induced? <br /> Does the leak detector reset (trip) when ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No <br /> the line pressure is bled off to zero psig? <br /> Does the STP properly cycle on/off under ❑ Yes ❑ No ❑ Yes ❑ No [] Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No <br /> normal fuel system operation conditions? <br /> A " No " answer to either of the above questions indicates the MLLD falls the test <br /> ELLD (ALL PRESSURE MEASUREMENTS ARE MADE IN PSIG) <br /> STP Full Operating Pressure <br /> j How many test cycles are observed <br /> before alarm/shutdown occurs? <br /> Does the simulated leak cause an alarm? ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No <br /> A " No" answer to the above question in& <br /> cates the ELLD falls the test. <br /> Does the simulated leak cause an STP ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No [] Yes ❑ No ❑ Yes ❑ No <br /> shutdown? ❑ NA ❑ NA ❑ NA [INA ❑ NA ❑ NA <br /> Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments: <br /> Tester's Name (print) Tester's Signature <br /> pei .org <br /> E <br /> t <br /> E€ <br />
The URL can be used to link to this page
Your browser does not support the video tag.