My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 4:36:01 PM
Creation date
8/25/2020 11:10:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231320
PE
2361
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
01
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEI/RP1200 - 17 <br /> APPENDIX Cw11 <br /> EMERGENCYSTOP SWITCH <br /> OPERATION <br /> Facility Name: Owner: <br /> Address: Address: <br /> City, State, Zip Code: City, State, Zip Code: <br /> Facility LD. #: Phone #: <br /> Testing Company: Phone #: Date: <br /> This procedure is to verify the operation of all emergency stop switches/buttons (Emstops). Each Estop must disconnect power to dis- <br /> pensers, submersible turbine pumps (STPs) and all non-intrinsically safe electrical equipment in classed areas. Test each Estop sepa- <br /> rately. See PEI/RP1200 Section 11 for the inspection procedure. <br /> Estop Number or ID <br /> Location <br /> L E-stops labeled and located ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No [] Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No <br /> where easily accessible? <br /> 2. System fully powered and in ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No FEI Yes ❑ No ❑ Yes ❑ No <br /> normal operating condition? <br /> 3. After activating Estop, power disconnected from : <br /> 3a, All dispensing devices p Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No <br /> on all islands? <br /> 3b. All STPs for all fuel ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No [] Yes ❑ NO ❑ Yes ❑ NO <br /> grades? <br /> 3c. All power, control and <br /> signal circuits associat- ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No <br /> ed with the dispensing <br /> devices and the STPs? <br /> 3d. All other non-Intrin- <br /> sically safe electrical <br /> equipment in classified ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes [] No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No <br /> areas surrounding fuel <br /> dispensing devices? <br /> 4. All intrinsically safe electri- <br /> cal equipment remains ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No <br /> energized after E-stop acti- <br /> vation? <br /> 5 . After testing, E-stop has <br /> been reset and power rees- ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No <br /> tablished to normal operat- <br /> ing condition? <br /> A " No" to lines 3a-3d indicates a test failure, <br /> Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail [] Pass fJ Fail <br /> Comments: <br /> Tester's Name (print) Tester's Signature <br /> pei.org <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.