Laserfiche WebLink
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address : 35 N . Cherokee Ln . , Lodi <br /> . TLS • . , CAS • • Piping Runs are estimated . : . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> L <br /> ESO . 87 Sum{ <br /> 2 420 . <br /> . Itd LI., D ATG • 1 , V. ) .t ?' . / . <br /> g. 4 4 4 . 4 0 9 0 0 9 . <br /> 91 ,Sgmp <br /> Float & . . . . =dFloat 205 . .ATG V T . .• tains • LD 2000 � .� . <br /> C r <br /> . . . . a 9 . . 6 S 3. . . , <br /> 6 . . . . 2 V . • DSL 4 4 4 q . . . . <br /> Float & 1 1 1 Float & V W , Sump , D20 <br /> . . 208 ATG : 000 <br /> Chains . . . . Chains LD 2000 <br /> : : : : 1 : : : : : : Nt. Cherokee• Ln . : : : : : : : : : <br /> Date map was drawn: 01 /24/ 19 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring <br /> System Certification . On your site plan, show the general layout of tanks and piping. Clearly identify locations of the following <br /> equipment, if installed : monitoring system control panels ; sensors monitoring tank annular spaces , sumps, dispenser pans , spill <br /> containers, or other secondary containment areas ; mechanical or electronic line leak detectors ; and in-tank liquid level probes (if used <br /> for leak detection) . In the space provided, note the date this Site Plan was prepared. Page 1 of 1 05/00 <br />