My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 4:36:01 PM
Creation date
8/25/2020 11:10:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231320
PE
2361
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
01
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WALTON � — <br /> ENGINEERING , INC , <br /> Overfill Prevention Inspection - OPW 61 and 71 Series Devices <br /> Date : 1 /25/2019 <br /> Owner: Tesoro <br /> Facility : #68151 <br /> OPW Overfill Model Number: 71 -SO <br /> Part 1 - Proper Height Setting Calculation <br /> Tank 1 Tank 2 Tank 3 Tank 4 <br /> Maximum Tank Volume Per: A Gallons 10056 <br /> Max shut off requirement for flapper is 95 % B 95% 95 % <br /> Multiply Max tank volume by 95 % C Gallons 9553 <br /> Use tank chart or ATG to determine height of D Inches 85 . 750 <br /> calculated volume <br /> Measure top of fill riser threads, or face seal E Inches 48 <br /> adapter <br /> Tank diameter (From Tank Chart) F Inches 95 <br /> Upper Tube in Tank (G) F-D = G G Inches 9 . 25 <br /> Subtract 2 " from upper tube in tank G-2 "= K K Inches 7 . 25 <br /> Calculated minimum upper tube length (I) I Inches 55 . 25 <br /> K+E=I <br /> Actual measured upper tube length (Without <br /> fill adapter) J s Inches 55 . 50 <br /> Part 2 - Device Certification Criteria Evaluation <br /> Does the overfill prevention device meet the 95% YES <br /> requirement? <br /> Is the actual measured upper tube length 6 .5 inches or YES <br /> more than the fill riser? (J must be 6 . 5 " or more than E) <br /> Does the overfill prevention device function as required? <br /> (Inspect the device for damage, contamination, freedom of YES <br /> movement, weakening due to wear and corrosion <br /> Device Overfill Certification PASS / FAIL PASS <br /> Drop Tube Testing PASS / FAIL PASS <br /> Technician certifies that the device is operationally compliant. <br /> Signature of Technician : / �c2r.� �� Date : 1 /25/19 <br /> Technician's Name : Rey Hernandez <br />
The URL can be used to link to this page
Your browser does not support the video tag.