Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 2 of 6) <br /> V. TANK SECONDARY CONTAINMENT INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Owens Corning A © B I C ✓❑ D ❑ <br /> A ❑ B ❑ I C ❑ I D <br /> Test Method Used : ❑ Manufacturer Guidelines (Specify) : <br /> ® Industry Code or Engineering Standard (Specify): Vacuum <br /> ❑ Engineered Method (Specify): <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Tank Containment Testing Training and Certifications (List applicable certifications) Expiration Date <br /> ICC UST Certification # 8819839 10/ 15/2021 <br /> VI . COMMENTS <br /> Provide any additional comments here. <br /> Started 87 annular at 11 : 00 am at 10 hg test ended at 12 : 00 pm at 10 hg <br /> Started 91 annular at 11 : 15 am at 10 hg test ended at 12 : 15 pm at 10 hg <br /> Started Diesel annular at 11 : 30 am at 10 hg test ended at 12 : 30 pm at 10 hg . <br /> " No inspector on site . <br /> VII . PRODUCT PIPING CONTAINMENT TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Smith A © 1 B W1 C D ❑ <br /> A ❑ I B ❑ C ❑ I D ❑ <br /> Test Method Used : ❑ Manufacturer Guidelines (Specify) : <br /> ® Industry Code or Engineering Standard (Specify): Pressure <br /> ❑ Engineered Method (Specify): <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Product Piping Containment Testing Training and Certifications (List applicable certifications) Expiration Date <br /> ICC UST Certification # 8819839 10/25/2019 <br /> Interstitial Communication Verification Method Used : <br /> VIII . COMMENTS <br /> Provide any additional comments here. <br /> Started 87 product at 12 : 00 pm at 5 psi test ended at 1 : 00 pm at 5 psi . <br /> Started 91 product at 12 : 15 pm at 5 psi test ended at 1 : 15 pm at 5 psi <br /> Started Diesel product at 12 : 30 pm at 5 psi test ended at 1 : 30 pm at 5 psi . <br /> ID = Identification <br /> j6 <br /> C <br />