My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 4:36:01 PM
Creation date
8/25/2020 11:10:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231320
PE
2361
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
01
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 5 of s) <br /> XVII . FILL RISER SUMP TESTING INFORMATION <br /> Manufacturer tify Tank ID from Section III for each Manufacturer <br /> A I B ❑ I C ❑ D ❑ <br /> A ❑ I B 1 C ❑ I D ❑ <br /> Test Method Used : ❑ Manufacturer Guidelines (Specify) : <br /> ® Industry Code or Engineering Standard (Specify): Hydrostatic <br /> ❑ Engineered Method (Specify): <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Fill Riser Sump Testing Training and Certifications (List applicable certifications.) Expiration Date <br /> ICC UST Certification # 8819839 10/15/2021 <br /> INCON TS-STS L4 - Certification # 1019623710 9/24/2020 <br /> XVIII . COMMENTS <br /> Provide any additional comments here. <br /> Direct burys - N/A <br /> XIX. VENT / TRANSITION SUMP TESTING INFORMATION <br /> Manufacturer Identify Vent / Transition Sump ID from Section III for each Manufacturer <br /> a ❑ I b I c ❑ I d ❑ <br /> a ❑ I b ❑ I c ❑ 1 d <br /> Test Method Used : ❑ Manufacturer Guidelines (Specify): <br /> ❑ Industry Code or Engineering Standard (Specify) : <br /> ❑ Engineered Method (Specify): <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Vent / Transition Sump Testing Training and Certifications (List applicable certifications.) Expiration Date <br /> XX. COMMENTS <br /> Provide any additional comments here. <br /> N/A <br /> ID = Identification <br /> i <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.