Laserfiche WebLink
PEI/RP1 200 - 1 7 <br /> Use this test procedure in conjunction with the as designed , flow restriction occurs when the tank <br /> manufacturer ' s installation and maintenance is no more than 90 percent full , and the tank-top <br /> instructions . fittings are vapor-tight. <br /> Visually verify that all tank-top fittings are leak- If any of the following configurations exist, the <br /> free and vapor-tight before starting the test proce- overfill prevention system fails the inspection . <br /> dure. If any fittings are loose, the ball float valve . ball float valves are installed in storage systems <br /> will not restrict flow. that are equipped with suction pumps and air <br /> Inspect the drop tube to ensure that it does not have eliminators ; <br /> an automatic shut off device. • the ball is cracked or damaged ; <br /> 7. 2 . 6 Inspection Procedure. • the ball float cannot be removed ; <br /> 1. Remove the ball float valve assembly from the • the orifice is not at the top of the assembly, or is <br /> tank, clogged with debris or corroded, which would <br /> 2. Visually inspect the ball float and cage. Remove prevent proper air flow after activation; <br /> any debris or foreign objects . ball float valves are installed with coaxial Stage <br /> 3 . Check the ball for holes and cracks . It should I vapor recovery ; <br /> move freely in the cage. Check for corrosion ball float valves are used on tanks equipped with <br /> that affects the operation of the ball float. remote-fill pipes and gauge openings without <br /> 4 . Check the vent orifice in the vent-restriction the use of "trap door" devices ; or <br /> pipe. It must be open and located near the top of ball float valves are installed in storage systems <br /> the tank, that also are equipped with automatic shutoff <br /> s. Use the ball float valve manufacturer ' s devices and the ball float valve is set to restrict <br /> installation procedure to determine if vapor flow flow before the tank is 95 percent full . <br /> will be restricted when the tank is no more than If the ball float valve does not function as designed, <br /> 90 percent full . flow restriction does not occur until the tank is <br /> 6 . After inspection of the ball float valve assembly, more than 90 percent full, or the tank-top fittings <br /> reinstall it following the manufacturer ' s installa- are not vapor-tight, the ball float valve fails the <br /> Lion instructions . inspection. <br /> 7. 2. 7 Pass/Fall Criteria. The ball float valve NOTE : When permanently removing a ball <br /> passes the inspection if the ball float valve functions float, ensure that the entire assembly is <br /> removed so as not to interfere with other <br /> methods of overfill prevention . <br /> 7.3 Overfill Alarms. <br /> 7 .3 .1.. General . Overfill alarms provide an audi- <br /> ble and/or visible warning to the fuel delivery <br /> ---�` driver if the product level in the UST reaches the <br /> 90 percent level during a delivery. They are often <br /> an integral part of the automatic tank gauge (ATG) <br /> system. An overfill alarm does not stop or restrict <br /> product flow. <br /> 1 66666 d7.3 .2 Purpose . The purpose of this inspection <br /> is to verify that the overfill alarm is operating cor- <br /> rectly and is set to provide a warning when the tank <br /> FIGURE 7-3 . To avoid damage when removing or reln- is no more than 90 percent full . <br /> stalling the ball float, use an extractor tool recommend- <br /> ed by the ball float manufacturer. <br /> pei.org <br />