My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 4:36:01 PM
Creation date
8/25/2020 11:10:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231320
PE
2361
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
01
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEURP1200_17 — -- -- _ - - --- ------ - ----- <br /> 13 . With the STP on and full pump pressure If the leak detector does not reset (trip ) when the <br /> indicated, slowly open the test apparatus leak line pressure is bled off to zero , the MLLD fails <br /> orifice and direct the fuel flow into a test can . the test . <br /> 14. Ensure that fluid flow is passing through the If the STP does not properly cycle on/off under nor- <br /> pressure regulator to the leak orifice . With the mal fuel system operating conditions, the MLLD <br /> pressure regulator, adjust the line pressure to fails the test. <br /> 10 psig. Direct the fluid flow into a graduated _— <br /> cylinder and time for 60 seconds . Adjust the NOTE : If the leak detector initially fails , the <br /> size of the test apparatus leak orifice until the test procedure should be repeated to confirm <br /> desired leak rate of 189 ml/min is achieved the initial result. <br /> while maintaining a line pressure of 10 psig. It -- —may be necessary to readjust the pressure regu- 9, 1,8 Restore System to Operational Condi- <br /> lator and/or the test apparatus leak orifice sev- tion . Upon completion of the test: <br /> eral times in order to correctly set the leak rate <br /> at 189 ml/min at a line pressure of 10 psig. To Shut off power to the STP and perform lockout/ <br /> expedite calibration, make coarse adjustments tagout procedures on the circuit breakers . Allow <br /> by measuring the volume of fluid that corre- line pressure to bleed off to zero and close the <br /> sponds to 15 seconds (47 ml). The final calibra- shear valve. <br /> tion of the test apparatus leak orifice must be Remove the test apparatus from the shear valve <br /> conducted by measuring a fluid volume of 189 body and properly reinstall the plug into the <br /> ml over the full 60-second time frame . shear valve test port. <br /> 15. Turn the pump off and allow the line pressure Reestablish power to the STP, tum dispenser <br /> to bleed off completely (0 psig) through the on and confirm that no leaks are present in the <br /> test apparatus leak orifice. This should cause system* <br /> the leak detector to "trip" (move into the leak <br /> Dispense product into the test can to remove any <br /> sensing position) . Do not change the size of <br /> the test apparatus leak orifice after it has been air from the line and confirm that full product <br /> properly calibrated in Step 14 . flow is achieved. <br /> I.G . Redirect fluid flow to bypass the pressure 9 .2 Electronic Line Leak Detectors ( ELLDs) . ELLDs <br /> regulator, and turn the pump on to allow the are commonly installed at the STP and can detect a leak <br /> simulated leak to occur through the calibrated in product piping between the ELLD and the solenoid <br /> test apparatus leak orifice . valve inside product dispensers . ELLDs trigger an alarm <br /> 17 . Observe that the line pressure rises to the and may shut down the STP if a leak is detected . <br /> metering pressure determined in Step 11 and 9 .2. 1 General. Use this test procedure in con- <br /> remains there indefinitely with the pump junction with the ELLD manufacturer ' s installation <br /> running and the simulated leak occurring and maintenance instructions . <br /> through the calibrated test apparatus leak <br /> orifice. The metering pressure must remain for 9 . 2.2 Purpose . This test method is used to <br /> a minimum of 60 seconds . If the line pressure determine if an ELLD can detect a product line <br /> rises to the full pump pressure at any time leak equivalent to 3 gph at 10 psig. <br /> during the test, this indicates that the leak 9 .2x3 Description of Test. A test apparatus is <br /> detector has fully opened and fails the test. typically connected to the test port on the shear <br /> 9 . 1. 7 Pass/Fail Criteria. If line pressure does valve inside a dispenser to simulate a leak in the <br /> not increase above the metering pressure for the product line equivalent to 3 gph at 10 psig . The <br /> duration of the test with the simulated leak occur- performance of the line leak detector is observed <br /> ring , then the MLLD passes the test, to see if it detects the simulated leak. <br /> If the line pressure increases to full pump pressure 9. 2.4 Test Equipment. Test equipment shall <br /> while the simulated leak is occurring, the MLLD include: <br /> fails the test. a test apparatus that includes a pressure gauge <br /> ®i pei .org <br /> i <br /> i <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.