Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : 3/26/2019 <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment;. 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> Monitoring System Certification <br /> MAY `� 4 ? Qly <br /> UST Monitoring Site Plan n ' ! _ <br /> Site Address- PLAZA LIQDUR #1300 S CHEROKEE LANE LODI CA 95240 Ei ` VVI RO N M ENTAL HEALTH <br /> DER42TRAPKIT <br /> F <br /> V r <br /> X <br /> *PIPING <br /> (ARROWS) F <br /> DTatrvteof CAS ocA . MITS. <br /> piping exit of `. STORE <br /> and UDC's. k • I • I • . . <br /> IATo uudereround <br /> cuwg L ❑ TV-1 acaccurate, evecannot speculate <br /> blue prints. <br /> KEY <br /> ?� = xNNUAx Sensor <br /> F = FELLS <br /> P = PROBE <br /> L = Turbine f Leak Detector <br /> R = SLnIP SENSOR <br /> B = Brine Sensor . . <br /> S = Smart Sensor <br /> C = Floats & Chains C 2 _ _ . . . . . . . <br /> E = £ Stop - - . _ . . . . . . . . . . . <br /> Any items underground that are not visdrle to the certifying technician aze a <br /> professional opinion only and are =solely for infomtational purposes. Drawing not to <br /> Beale. <br /> Date map was drawn 3126119 <br /> LEGEND <br />