My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2019 AS BUILT PLAN
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
2300 - Underground Storage Tank Program
>
PR0231349
>
INSTALL_2019 AS BUILT PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2020 2:15:43 PM
Creation date
8/25/2020 1:41:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2019 AS BUILT PLAN
RECORD_ID
PR0231349
PE
2351
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
01
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RED THREAD° IIA Installation Checklist <br /> Instructions for Underground Petroleum Piping for Motor Vehicle, <br /> Concentrated, High Blend, Aviation and Marine Fuels <br /> (Review the "Important Notice Section" on page 2 before completing) <br /> HeO I hreada pnmary arid secondary piping systems are rated o the Tollowing maximumopera ing ra ngs: <br /> PRIMARY. 2" Q 250 psig, 3" ® 175 psig, 411- ® 125 psig SECONDARY: 3"-4" Q 50 psig; 6" Q 20 prig <br /> neroperator (please print sign name) / <br /> Job Site Address 00 &, /GC rl L4 ' t r <br /> Job Site Roprosontativo ' Ctrs(/ eta /�, n �f 'hi( <br /> (signature) " <br /> Installation Contractor/Foreman ICtI C IOL4C, (signature) � � �I <br /> ) o � —G <br /> Installation Dete(s) b — dJ 7 � - L,p — o� <br /> To be initialized by: <br /> Installer's Foreman Owner/Operator Rep. <br /> PRE-INSTALLATION CHECKLIST (indicate date verified after each Item.) <br /> Installer shall show evidence that he/she is: � <br /> 1 . Licensed or certified by the state Implementing agency, or v ' L� <br /> 2. Trained by the pipe manufacturer. +L <br /> Installer has current manufacturer's Installation Instructions: <br /> 1 . Instructions dated <br /> 2. Installation manual number C <br /> Pipe & Fittings have UL (Underwriters' Laboratories) or ULC (Canada) label: <br /> Proper Tools and adhesive available per manufacturer's Instructions: <br /> Pipe & Fittings Inspection: <br /> 1 . Impact or puncture....Cut out. See Footnote 1 for repairs. �^ <br /> 2. Damaged tapers. ..Cut off and retaper, <br /> 3. Check bonding surfaces for ultraviolet weathering degradation. <br /> Trench: <br /> 1 . Allow for minimum of 6" bedding material <br /> 2. Have required slope per owners specification. <br /> 3. Width: Allow for 4" minimum separation between pipes and <br /> 6" minimum from trench walls. <br /> Approved backfill (NO native soil) <br /> 1 . Clean wahed sand, or, C "' <br /> 2. Pea gravel - 1 /6" to 3/4" particle size, or <br /> 3. Refer to Footnote 1 for other backfill materials. <br /> INSTALLATION PROCEDURES (Indicate date verified after each Item.i <br /> 1 . 6" of approved bedding material . <br /> 2. Dry fit system prior to adhesive bonding, see Footnote 1 . <br /> 3. Heat assist required for adhesive curing when temperature <br /> Is below 50"F (1 ( "C). See Footnote 1 . <br /> 4. A minimum separation of 4" between pipe runs and 2%" on crossovers. <br /> 5. Bedding/backfill supports pipe completely on runs and crossovers. /A <br /> 6. Minimum of 6" approved backfill cover material or more as /" <br /> required by local authorities. <br /> 7. It surface Is unpaved, a minimum of 17" of approved backflll Is required. <br /> INSPECTION AND TESTING (Indicate date verified after each Item.) <br /> 1 , Cocked joints (misaligned tapers). Soe Footnote 2. <br /> 2. Joint Back off, See Footnote 2. G <br /> 3. Check for proper cure of adhesive bond. See kit Instructions. i� / <br /> 4. Test system in accordance with NFPA 30 or local requirements, <br /> See Footnote 3, <br /> 5. Secondary containment piping, See Footnote 1 , <br /> www./g sptpe"com <br /> 2700 West 65th Street <br /> Lillie Rock, NW Fiber Glass Systems <br /> alansas 12209 <br /> Phone: 1 (501) 6684010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.