Laserfiche WebLink
UNDERGROUND STORAGETANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page 6 of 6) <br /> NOWNEWEEN <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment,' 10) <br /> line leak detectors, and 11) devices monitoring any other secondary containment areas. <br /> SiteAddrens= KET LEALANCHEVRON601KETTLEAMNLANELODICA'95240 <br /> *PIPL1G } <br /> (ARROWS) 1 . 7. 9 _ <br /> Drawing of piping <br /> exit of sump and s _ <br /> LDC's. \o <br /> tntda eround . _ . I . _ . . <br /> draamtg is &Wja tRV <br /> tvecannot . . . . . . <br /> speculata blue <br /> prints. <br /> . 3 . ,---4. 5. m 11 . 1) 2. - <br /> T KE <br /> . _ <br /> 91 T A = NNUTARSensor <br /> `/ �] 87 87 a F = FILLS <br /> o DIE P = PROSE <br /> n L = Turbine l Leak Detector <br /> w x / X = SVXIP SENSOR <br /> B = Brine Sensor <br /> NEW Cs a x _ S = Smart Semor <br /> C = Floats & Chains <br /> 0 0 0 E = E Stop <br /> . . . . OVERFILL ALARfd. . . . A . . . . . . <br /> C-STORE <br /> Any items underground that are not risible to the certifying technician are a <br /> professional opinion only and are solely for informational purposes. Draning not to <br /> scale. <br /> Date map was drawn: 7/16119 <br /> Instructions <br /> If you already have a diagram thatshows all required information, you may include_ it, rather than this page, with your Monitoring System Certification. On your site plan , <br /> show the general layout of tanks and piping. Clearly identify locations of the following equ-:pment, if installed: monitoring system control panels: sensors monitoring tank <br /> annular spaces, sumps , dispenser pans, spill containers, or dither secondary containment areas: mechanical or e:euronio line leak detectors; and in-tank liquid level <br /> probes (if used for leak detection). In the spans• provided, note the date this SRe Plan was prepared. <br /> LEGEND <br />