My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROCKY
>
262
>
1600 - Food Program
>
PR0545763
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2020 6:12:58 PM
Creation date
8/25/2020 2:50:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0545763
PE
1624
FACILITY_ID
FA0025909
FACILITY_NAME
FAIRFIELD INN & SUITES LODI
STREET_NUMBER
262
STREET_NAME
ROCKY
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
262 ROCKY LN
P_LOCATION
02
QC Status
Approved
Scanner
JCastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N , ^ <br /> vI-J <br /> VERTICAL FURRING STRIPS TO SECURE CARRIER SYSTEM METAL STUD BULKHEAD • <br /> FRAMING WITH GYP. <br /> . LLI <br /> BOARD SHEATHING, <br /> SECURED AND BRACED TO <br /> STRUCTURE ABOVE AS <br /> REQUIRED LINEAR DIFFUSER (WHERE OCCURS) <br /> 04 1 1 1 1 1 1 1 1v <br /> SUPPORT A5-REQUIRED d <br /> TO STRUCTURE <br /> C) V ��,y <br /> �y ray ' LINEAR CEILING FRED ING ARGHITEGTS <br /> EXTERIOR <br /> J CARRIERS ON RIR WA _ _ _ 1211 J STREET,MODESTO,GA 95354 <br /> HANGAR WIRE TO <br /> CONSTRUCTION 209.522.8900 <br /> z SUPPORT WOOD ,- <br /> p <br /> d d d y d <br /> PLANK CEILING GYP. BOARD FRAMING AS <br /> w <br /> " <br /> REQURED TO SUPPORT <br /> SEAL: <br /> O ACOUSTICAL CEILING INVERTED CEILING TRACK <br /> TILE SYSTEM4 N ppV <br /> vv TEXTURED, REGYGLIG CABINET <br /> J N N - - - - - - - - - - - - LINEAR CEILING CARRIERS ED ARCy/ <br /> TEMPERED GLASS �`� <br /> SUPPORT WOOD PLANK J Fj <br /> O PANEL �� �� ���A� ����� G�' VO c. UR/f C' <br /> ON HANGAR WIRE TO <br /> � d ,d d ,d y y d SOLAR SHADES B � <br /> INSTALLED <br /> PLANK SYSTEMD VERTICALLY %%%%%%%/ / / / / / CEILING OP <br /> WOOD FRAME, WOOD VENEER FRAME �� �� �� ---- ° °--° - ° °- <br /> G ILING MOUNTED <br /> z STEEL COLUMN WITH STOP OPP. PROVIDE GLASS STOP <br /> SIDE THIS SIDE 5/8" GYP. BOARD 5HADOWLINE ACG OUSTIGAL GEILINWITH LINEAR GAY2RIEfZt, 711 , <br /> p <br /> SYSTEM <br /> 'G � . \, <br /> TINDON OR <br /> PERIMETERTIL SYSTEM BULKHEAD CONST. SOREO <br /> REN. <br /> ���� LINEAR CLIP 03-31- <br /> 21MOLDING <br /> WOOD VENEER PANELS �P <br /> ATF <br /> VERTICAL PLANKS TO <br /> TO ENCLOSE COLUMN � ,� � � � � � � � � � � � � � ' <br /> p WHERE GUT ENDS OF ALIGN WITH WOOD PLANK WOOD PLANK GEILING;SHOWN GUT �FCA�- <br /> Lu ON SHIMS OR <br /> BLOCKING AS <br /> PLANKS ARE EXPOSED, i i i i i i i i i i i GEILING ON ITS LONG AXIS; EDGE SUPPORT <br /> / <br /> Q REQUIRED OO cp PROVIDE APPLIED PROVIDED BY INVERTED GEILING <br /> FINISH TAPE TO MATCH TRACK SECURED TO METAL STUD <br /> FINISH OF WOOD FRAMING. <br /> ~ J PLANKS, TYP. <br /> N <br /> x CONSULTANT: <br /> Q STEEL BASE PLATE <br /> m AND BOLTS BELOW 01 11" 01 1'--1 1/2" 2" <br /> ° <br /> z T"rP I GAL GORRI DOR GE I L I NO- 0`rP. TO SUSPENDED 5D SOFFIT BULKHEAD AT BREAKFAST RM SOLAR SHADE POGKET AT BRKFST RM GLO <br /> SCALE: 1 112"=I'-O" SCALE: I I/2"=I'-O" 4 SCALE: I <br /> W I � <br /> BOOTH WALL <br /> N SCALE: 1 1/2"=1'-O" ACCESS PANEL ASSEMBLY- <br /> FIELD GUT AS REQUIRED <br /> LINEAR CARRIERS, FIELD GUT <br /> H AND FASTENED TO SUPPORT <br /> ACCESS PANEL AS REQUIRED <br /> HANGER WIRE AT 4'-0" O.G. <br /> MAX. OR A5REGUIRED BY <br /> FRAMING TO SPAN FROM CODE <br /> LINEAR CARRIER TO LINEAR <br /> CARRIER (SUPPLIED BY FRAMING AS REQUIRED GYPSUM BOARD <br /> 71 <br /> INSTALLER) I <br /> FRAMING TO STRUCTURE <br /> ASREQUFRED VERTICAL FURRING STRIPS <br /> I I TO SECURE CARRIER SYSTEM <br /> 0 <br /> ASSEMBLY FOR-RECESS <br /> METAL WALK-OFF MAT LINEAR COVE LIGHT, <br /> LOCATE ASREQUFRED GYPSUM BOARD AND METAL <br /> TO WASH WALL STUD FRAMING TO PROVIDE O <br /> TRANSITION TRIM SEE `� SUPPORT FOR VERTICAL WOOD namRd <br /> INTERIOR FINISH MANUAL I AGOUSTIGAL PLANK SYSTEM AND INVERTED ISI I I <br /> GEILICEILING TRACK BELOW <br /> REVEAL I 5CHED. PARTITION SYSTEM <br /> NG, 'f o <br /> Is <br /> TILE FLOORISEE SHEET VV VV u � r E Is <br /> A402 FOR FINISHES f A <br /> YPSUM BOARD AND METAL <br /> FRAMING AS-REGUIRED N Gp D D <br /> LINEA <br /> BLOCKING R GEILING CARRIERS ON �� Q 0� <br /> HANGAR WIRE TO SUPPORT D <br /> LINEAR WOOD PLAN PERIMETER WOOD PLANK GEILING <br /> LINEAR CARRIERS SPACED GYP. BOARD GEILING 4 6 BLOGKING A5-REGUIRED MOLDING <br /> L 4TFROM ACCESS PANELAX. vv <br /> OR <br /> LINEAR FLEECE STABILITY (2) LAYERS OF 5/8" ®® <br /> AA <br /> GYP. BOARD <br /> S _ <br /> WOOD PLANK GEILING, SHOWN GUT <br /> WOOD PLANK SYSTEM INSTALLED <br /> ON ITS LONG AXIS; EDGE SUPPORT <br /> 4 ''4� >i PROVIDED BY INVERTED GEILING <br /> J , CARRIER SYSTEM 5E6URED TO <br /> >? s s s 4 s TRACK SECURED TO METAL STUD <br /> WALL AND CLIP ANGLE TO WOOD <br /> c <br /> MELEVATOR DOOR AND <br /> MOOD PLANK GE I L I NO SOFF I T- AGGESS I PLANK GEILING BY INSTALLER; FRAMING. <br /> FRAME PLANKS TO ALIGN WITH WOOD WHERE GUT EN05 OF PLANKS ARE EXPOSED, Q <br /> SGALE: 3/4"=1'-O" PLANK GEILING PROVIDE APPLIED FINISH TAPE TO MATCH FINISH z <br /> 8, <br /> OF WOOD PLANKS, TYP. n n n z <br /> COORDINATE SLABREGESS TO <br /> PROVIDE FLUSH TRANSITION TO TILE HANGER WIRE AT 4'-0" O.G. <br /> LINEAR GARRIERS SPACED MAX. OR A5-REGUIRED BY • <br /> 24" O.G. (APPROX.) MAX. 4" CODE <br /> FROM ACCESS PANEL FOR L 10HT GOVE SOFFIT AT ELEVATOR MOOD PLANK SOFFIT AT BREAKFAST RM <br /> - <br /> INTERIOR WALK-OFF FLOOR MAT TO TILE STABILITY <br /> SGALE: 6"=1'-O" SCALE: I I/2"=1'-O" SCALE: I <br /> I IM <br /> v <br /> s <br /> D <br /> LINEAR FLEECE I <br /> v <br /> � I <br /> Ij <br /> O BEYOND GEILING o <br /> WOOD PLANK GUT IN HALF ON ITS REVEAL ' — — — — — <br /> LONG AXIS; INSTALLED CONT. ALONG WHERE GUT ENDS OF PLANKS — — — — — — — <br /> EDGE OF GEILING FOR LENGTH OF M <br /> GEILING, EACH SIDE. FINISHED EDGE LINEAR WOOD PLANK ARE EXPOSED, PROVIDE <br /> � APPLIED FINISH TAPE TO MATCH <br /> TO FACE DOWN, TYP. PLANKS TO BE <br /> FINISH OF WOOD PLANKS, TYP. I/4" <br /> JOINED PER RECOMMENDATIONS TO <br /> s MINIMIZE JOINTS VISUALLY. SEE <br /> DETAIL 1/405 THIS SHEET BLOCKING <br /> O l� <br /> Z 1( <br /> FRAMING AS REQUIRED K <br /> 7 o WOOD PLANK GE I L I NO SOFFIT TO STRUCTURE o <br /> O O w - - _ _ WOOD PLANK GEILING SYSTEM • <br /> SCALE. 3/4"=1'-O" FRAMING AS REQUISED PROVIDE BLOCKING IN �n SECURED TO LINEAR GEILING <br /> WALL AS REQUIREDm GARRIERS ON HANGAR WIRE <br /> O — — WOOD PLANK SYSTEM AS WALL ~ <br /> 75 FINISH; FULL PLANK AT TOP; <br /> Lu SECURE TO WALL ON LINEAR CLIPS <br /> SECURED TO LINEAR BLOGKING ks) <br /> FLOOR STRUCTUREZ <br /> 4 I/2" I/2" AND SECURED TO WALL. O n <br /> O � ABOVE, VERIFY 10 <br /> 5/8" GYP. BD. v <br /> 8 IF GUT ENDS OF PLANKS ARE <br /> EXPOSED, PROVIDE APPLIED FINISH <br /> TSUPPORT A5-R5 <br /> O STRUCTURE EGUIRED TPAANK , YAPTGH FINISH OF WOOD <br /> 4J <br /> REVISIONS: <br /> BULKHEAD FRAMIN& AS <br /> C7 -REQUIRED. PROVIDE SUPPORT <br /> 1 BLDG DEPT. 10/12/18 <br /> FOR PENDANT LIGHT FIXTURES <br /> AND ASSOCIATED JUNCTION 2 BLDG DEPT. 10/31/18 <br /> 5D VIEW- GE I L I NO EDO X BOXES AS REQUIRED SOFFIT AT OYPSUM BOARD GE I L I NOS WOOD PLANK SOFFIT AT WELGOME DESK 3 MARRIOTT 03/20/Iq <br /> 3 Q 4 OWNERREV. 03/2O/IG <br /> 6 SGALE: NTS Z SGALE: 1 1/2"-I'-O" SCALE; 1 1/2"-I'-O" <br /> — — — — r-�r-- - - 5 ASI #002 03/20/IG <br /> N — — — — — <br /> N <br /> ACOUSTICAL ACOUSTICAL <br /> CEILING TILE CEILING TILE <br /> SYSTEM SYSTEM <br /> v <br /> 5/8" GYPSUM BOARD <br /> I-) <br /> REQUIRED ON FRAMING AS <br /> BA PROJECT # 161010 <br /> PLN PROJECT <br /> MARRIOTT # 44-76 <br /> D <br /> GROUP OF PENDANT FIXTURES AT GYP. BOARD CEILING ON <br /> r/ COMMUNAL o TABLE. EACH FIXTURE HUNG FRAMING A5-REOUIRED PERMIT #FRAMING AS REQUIRED - <br /> - SEPARATELY WITH INDIVIDUAL JUNCTION <br /> = BOXES. VERIFY INSTALLATION WITH APN # 055-66-012 <br /> GYP. BOARD ON <br /> MANUFACTURER'S RECOMMENDATIONS. AS REQUIRED TO <br /> +� 5/8" GYP. BOARD METAL STUD FRAMING <br /> SUPPORT INVERTED <br /> CEILING TRACK <br /> DATE: 11/13/2018 <br /> DRAWN: G.GUAJARDO <br /> 8' <br /> CHECKED: D. BURKETT <br /> D- LINEAR Q 1 <br /> LINO <br /> d) CARRIERS ON HANGAR <br /> OLu <br /> m WIRE TO SUPPORT <br /> N WOOD PLAN CEILING <br /> s <br /> SHEET TITLE: <br /> LINEAR CLIP <br /> LOBBY AREA <br /> ACOUSTICAL GEILING TILE ® ® e O e e e e O O DETAILS <br /> SYSTEM- CORRIDOR SIDE � <br /> s <br /> 0 5HADOWLINE PERIMETER <br /> MOLDINGLINEAR COVE LED LIGHT <br /> O X11 WOOD PLANK GUT IN HALF ON ITS LONG FLUSH FIXTURE AS SCHEDULED; <br /> 7:5 ]' <br /> AXIS; INSTALLED CONT. ALONG EDGE OF SECURED TO COVE WALL, SEE <br /> GEILING FOR LENGTH OF GEILING. SECURE SGP <br /> WITH CLIP ANGLES PROVIDED BY <br /> INSTALLER TO WOOD PLANK. FINISHED LONG AXISCEILINO PROVIDED BY <br /> ITS <br /> EDGE TO FACE DOWN, TYP. PLANKS TO BE <br /> INVERTED GEILING TRACK SECURED TO <br /> JOINED PER MANUF.RECOMMENDATION5 TO METAL STUD FRAMING. <br /> SEE RCP FOR FIXTURE MARK NOS. AND MINIMIZE JOINTS VISUALLY. SHEET NO.: <br /> .3 <br /> FOR LAYOUT DIMENSIONS - TYPICAL <br /> O <br /> s I 5D VIEW- BULKHEAD AT BANGUETT BULKHEAD AT GOMMUNAL TABLE FIRST FLOOR GE I L I NO GORR I DOR WOOD PLANK SOFFIT AT BREAKFAST RM A405 <br /> SGALE: NTS SCALE: 11/2"=1'-O" SGALE: 1 1/2"=1'-O" SGALE: 3"=1'-O" <br />
The URL can be used to link to this page
Your browser does not support the video tag.