Laserfiche WebLink
on <br /> � N <br /> N FOOTING SCHEDULE WOOD SHEARWALL SCHEDULE KEYNOTES FOUNDATION PLAN NOTES <br /> � COMPRESSION POST SCHEDULE U <br /> MARK THICKNESS WIDTH FOOTING LENGTH FOOTING REINFORCING LEVEL SHEAR TYPE BY BUILDING LEVEL • <br /> - STRAPIHOLDOWN MARK S37 POUR FOOTING TO EXTENTS SHOWN. REINFORCING PER F3.0. EMBEDMENT: W <br /> F2.0 18" 2'-0" 2'-0" #5 AT 12"O.C. EA WAY BOT 3 2 1 <br /> ROOF 3RD 2ND A. MIN EMBEDMENT DEPTH: 18".ALL FTGS SHALL EXTEND BELOW GRADE THE MIN EMBEDMENT <br /> F3.0 18" 3-0" 3-0" #5 AT 12"O.C. EA WAY BOT ST1 46 46 46 SW-1 A A A S45 F5.0 AT THIS LOCATION SHALL MATCH THE DEPTH AND REINFORCING OF THE F8.0 DEPTH AS NOTED.GRADE SHALL BE DEFINED AS T.O.LOWEST ADJACENT COMPACTED <br /> F4.0 18" 4'-0" 4'-0" #5 AT 12"O.C. EA WAY BOT ST2 6SW-2 C CC DD FOOTING. SUBGRADE. <br /> O x6 6x6 6x6 r 1 N F5.0 18" 5'-0" 5' D `.! <br /> 6x6 6x6 6x6 S46 PROVIDE(4)#5 BARS T&B FOR THIS FOOTING. <br /> F6.0 18" 6'-0" 6'-0" #5 AT 12"O.C. EA WAY T&B ST3 SW-5 A C D CONCRETE: <br /> MF7.0 24" T-0" 7-0" #5 AT 12"O.C. EA WAY T&B ST4 6x6 6x6 6x6 SW-6 B BB CC A. TYP T.O. FTG=0'-10"UNO; <br /> F8.0 24" 8'-0" 8'-0" #6 AT 10"O.C. EA WAY T&B ST5 6x8 6x8 6x8 SW-7 A C BB <br /> 0 <br /> 1`145.0 24" 5'-0" 14'-0" #5 BARS AT 12"O.C. EA WAY T&B HDU2 46 46 46 SW-8 B D D B. T.O.FTG AT INTERIOR STEEL COL=-10"BELOW FINISHED FLOOR. RED INC ARCHITECTS <br /> 2F2.0 18" 2'-0" CONT (2)#5 BARS CONT T&B HDU8 6x6 6x6 6x6 SW-9 A B B 1217 J STREET,MODESTO,CA 95354 <br /> WF2.5 24" 2'-6" CONT (3)#5 BARS CONT T&B HDU11 6x6 6x6 6x6 C. TYP SLAB ON GRADE SHALL BE 4"THICK MIN CONC W/#4 BARS AT 18"O.C. EW,CENTERED IN zo9.5zz.ssoo <br /> 1NF3.0 18" 3' 0" CONT (3)#5 BARS CONT T&B HDU14 6x6 6x6 6x6 SLAB THICKNESS.SLAB SHALL BE UNDERLAIN W/AN OPTIONAL 2"SAND LAYER PER GEOTECH <br /> WF3.OA 24" 3'-0" CONT (4)#5 BARS CONT T&B (2)HDU11 6x8 6x8 6x8 REPORT OVER A MIN 3"OF COMPACTED,CLEAN GRAVEL OF 3/4"MAX SIZE.A MIN 10MIL VAPOR SEAL: <br /> WF3.5 36" 3'-6" CONT (5)#5 BARS CONT T&B BARRIER SHOULD BE PLACED DIRECTLY ON TOP OF THE GRAVEL/CRUSHED ROCK. <br /> J WF4.0 36" 4'-0" CONT (2)HDU14 5.25x5.25 PSL 5.25x5.25 PSL 5.25x5.25 PSL <br /> z (6)#5 BARS CONT T&B (2)HD19 (2)5.25x5.25 PSL (2)5.25x5.25 PSL (2)5.25x5.25 PSL D. PROVIDE CONTROL JOINTS IN CONC SLAB ON GRADE PER"TYPICAL CONTROL JOINT IN oFESSio <br /> CONCRETE SLAB ON GRADE"DETAIL.OPTIMIZE LOCATIONS W/ARCH DWGS. a eR Nq� <br /> o NOTES: ��� �OSEpy <br /> STEEL COLUMN SCHEDULE A. SCHEDULE APPLIES LINO ON PLAN co <br /> �� - <br /> B. INSTALL(1)HD19 INTO EA COMPRESSION POST W/PAB10 EMBEDDED E. CONTINUE WALL AND FTG REINF INTO WALLS AND FTGS THAT ARE PERPENDICULAR TO EA w n m <br /> W MARK COLUMN SIZE BASE PLATE TYPE MIN 15"BELOW COLD JOINT INTO FTG. PROVIDE 2"GAP BETWEEN OTHER PER TYP DETAILS. S4634 = A <br /> JPOSTS FOR INSTALLATION. EXP- 12/31/2 <br /> C3.5 HSS3-1/2X3-1/2X3/8 10"SQUARE x 1"PL W/(4)3/4"DIA x 9"EMBED AB <br /> C4.5 HSS4-1/2X4-1/2X1/2 11"SQUARE x 1"PL W/(4)3/4"DIA x 9"EMBED AB F. SEE"TYP STEPPED FTG"DETAIL FOR FDN STEP. R CT� <br /> C6 HSS6XO.500 12"SQUARE x 1"PL W/(4)3/4"DIA x 16"EMBED HEADED STUD ANCHORS TF OF CAL�F�� <br /> o C44 HSS4X4X1/2 10"SQUARE x 1"PL W/(4)3/4"DIA x 9"EMBED AB G. ALL WALL FOOTINGS SHALL BE WF2.0 UNO. 04/17/2019 <br /> C55 HSS5X5X1/2 11"SQUARE x 1"PL W/(4)3/4"DIAx 9"EMBED AB CONCRETE WALL SCHEDULE <br /> o C75 HSS7X5X1/2 13"x11"x1"PL W/ 4 3/4"DIA x 9"EMBED AB MARK WIDTH VERTICAL REINFORCING HORIZONTAL REINFORCING COMMENTS ANCHORAGE: <br /> C77 HSS7X7X5/8 3" UE 1" W 4 x "E E B CW1 8" #5 VERTS AT 12"O.C. #5 AT 12"O.C. A. "LSTHD8"...,"LSTHD8RJ"...,"HDU5"...,"HDU8"... INDICATE HOLDOWNS AT FDN PER TYP SHARED <br /> C88A HSS8X8X1/2 1 1/16"x14"SQUARE PL W/(4) 1"DIA X'16"EMBED HEADED STUD ANCHORS 4 HOLDOWN DETAIL, LINO. <br /> CONSULTANT: <br /> C88B HSS8X8X5/8 1/1 "x1 "S AR PL W/ 1" IA 16" MB D H AD D S UD NCHOR <br /> X C93 HSS9X3X1/2 15"x9"x1"PL W/(4)3/4"DIA x 9"EMBED AB B. ALL HOLDOWNS AND MISC HARDWARE AT ENDS OF SHEARWALLS WHERE INDICATED ON THE <br /> C95 HSS9X5X5/8 15"x11"x1"PL W/(4)3/4"DIA x 9"EMBED AB PLAN ARE SIMPSON TYPE HOLDOWNS.ATTACHMENT REQUIREMENTS TO WALL AND FDN ARE <br /> co PER MFR SPECS. <br /> 0 <br /> z <br /> U) C. FOR HOLDOWN AB, SIZE,AND EMBEDMENT REFER TO HOLDOWN SCHED IN TYP DETAILS. <br /> w <br /> w -T <br /> w 10 11 11.9 12 13 14 15 16 17 1818.1 Tj <br /> c=n D. FOR AB SIZE AND EMBEDMENT OF METAL BUILDING REFER TO"TYPICAL ANCHOR BOLT <br /> momomi <br /> 233' 10" T SCHEDULE"DETAIL. <br /> LL 91-101. 13-13/4" 13-13/4" 13-13/4" 13-13/4" 13-13/4" 13-13/4" 15'-0 3/4" 13-1 3/4" 13'-1 3/4" 111-51/81, 1 - 5P" 13'-1 3/4" 13'-1 3/4" 13'-1 3/4" 13'-1 3/4" 13'-1 3/4" 13'-1 3/4" 9'-3" 6" ENGINEERING SYSTEM SOLUTIONS <br /> of of of of o1 f1 WALLS: STRUCTURAL•MEP•BUILDING COMMISSIONING <br /> A. APPROXIMATE LOCATIONS OF NON-STRUCTURAL, INTERIOR PARTITION WALLS ARE SHOWN BUILDING RELATIONSHIPS <br /> FOR REFERENCE ONLY.SEE ARCH DWGS FOR EXACT LOCATIONS. EXCEEDING EXPECTATIONS <br /> www.es2eng.com <br /> 4943 NORTH 29TH EAST,STE A <br /> MISC: IDAHO FALLS,IDAHO 83401 <br /> PHONE:(208)552-9874 <br /> A. TYP DETAILS AND NOTES SHALL APPLY,THOUGH NOT NECESSARILY INDICATED AT A SPECIFIC <br /> LOCATION ON PLANS. JOB NUMBER: 17.1019 <br /> r�EPEA","A'DGS END DES111S RRI,THE EXCLUSIR 1,PFC)PERTY OF ENGINEERING <br /> sYS�SOSIT ILL N(IT- <br /> F4.0� I ro���a R�"�=�R� ,�,�r�oA "ME,=,=T s��T,�Es <br /> WRITTEN <br /> B. CONTRACTOR TO VERIFY ALL DIMS PRIOR TO CONSTRUCTION. RESOLVE ANY DISCREPENCIES <br /> J L -� WI THE ARCHITECT. <br /> F - - -C6- -C6-C6- - - ulo <br /> C. CONTRACTOR TO VERIFY LOCATION OF ALL INSERTS IN SLAB W/APPROVED MECH, PLUMBING, <br /> I 7 F8 0 I I AND ELECTRICAL DWGS PRIOR TO CONSTRUCTION.SEE ARCH FOR DRAIN LOCATIONS. <br /> (�0� F14x5.0�1 C88A 8" - - - - - - <br /> L1_31L4' - - S10.1 <br /> 7 1/2" � D. ITEMS NOT SPECIFICALLY DIMENSIONED ON THE PLANS SUCH AS INTERIOR SHEARWALLS, • (70 <br /> L POSTS, HOLDOWNS, ETC.SHALL BE LOCATED BY COORDINATION BETWEEN APPROVEDn(( R d <br /> STRUCTURAL AND ARCH PLANS AND DETAILS. �c <br /> E. ADEQUATE DRAINAGE AWAY FROM BLDG SHALL BE PROVIDED.SEE APPROVED ARCH/CIVIL -su � T E -s <br /> DWGS. BY MARRIOTT <br /> F. BACKFILL AT UTILITY TRENCHES SHALL BE PLACED AND COMPACTED PER THE GEOTECHNICAL <br /> REPORT. <br /> I <br /> 1 Q <br /> S10.1 F8.0 F8.0 O <br /> 81/2" L - - - - - - - - - - - 4 U <br /> S10.1 <br /> N � - - - - - - - - - - - - F 07C88B � - I <br /> o = (2)HDU14 (2L DU 1 - L- J L - C�B <br /> co 1 to o - - - - - Z _) -F3.0 rJ 1 <br /> S10.1 1� I L_ - - - - - - C3.5 <br /> 2 2 � I3 i 1� 1 2 s1o1 2 <br /> WF2.5 WF2.5 - - - WF2.5 L - - J C4.5 WF2.5 WF2.5 <br /> - - SW_ (8' 1") - - - SW5 (5' 6"� SW5 (8' 9"� - - - SW5 (7' 2)L - - - -- 1 I (2)HDU11 = 1 r - - - - - SW5 (7' 2")- SW5 (7' 2") - - - - SW5 (7' 2")- - - - � <br /> 0 <br /> S10.1 F5.0 S10.1 <br /> 2 HDU1El <br /> 1, N I HDU14 (2)HDU11 C44 (2 HDU11 (2)HDU11 C44 (2)HDU11(2)HDU11 C44 (2 HDU -(2)HDU C44 (2)HDU11 2 i �F4.0 (2)HDU14 2 I HDU2 (2)HDU11-1 F_(2)HDU11- (2)HDU11 � L(2)HDU11- -(2)HDU11-1 F_(2)HDU11 <br /> ( ) J - WF2.5 - J 1 2)HDU11 <br /> SW-5 (9'-2")- ,(2)HDU11 / / = 1 WF2.5 HDU8 1 I I SW-5 (8'-T <br /> F5.0 F5.0 - -F5.0 - F5.0 I L __ C44 <br /> 1 HDU2 � WF2.5 � I N �� - - - - - � (2)HDU14 (2)HDU11 (2)HDU11-�- _ <br /> 1 - - - I I I I I F WF2.5 <br /> 1 F4.0 C3.5 I (I)HDU14 I 1 (2)HDU11 -I �2)HDU11 I I I I I O° <br /> s1o1 0l o o �, IM 2 I I 1 1 I I 1 2 <br /> I <br /> - o I U- 4"CONCRETE SLAB WI#4 AT 18"O.C. S10.1 1 o I 4 <br /> EACH WAY OVER COMPACTED FILL T.O. i I I �I I U- I I Eo <br /> 1 HDU21 a <br /> I I �� �I I I <br /> _ I I _ , N I o _ U I N I <br /> SLAB-0-0(FIELD VERIFY SLOPE AND N N I� <br /> ELEVATION WITH ARCH) �o I - - 1 <br /> 1 - TYP 4 HDU2 <br /> N <br /> L;== �(2>HDu14 S46 I I � � I I � I III � � 1 I- <br /> _ _ _ <br /> I <br /> N HDu2� - 1 - - -1 6 cwt I �D <br /> F6.o F6.o I I I I I I 1 1 N o <br /> s10.1 (2)HDU11 - - 1 1 1 1 I I <br /> 01 C4.5 1 r - 1 - � r I I I I I c`o <br /> 1 2 S45 1 -C44 c44� 6' 61/8 I C4.5 C55 1 1 I 1 1 2 �I I 10 1 z <br /> S10.1 - - - � EF 4' 73/4" L - - J _ i� = y �, 5 F4.0 I 1 10.1 • <br /> C77 � � - - - - � r - -C75� \ M 1U U � C44 Eo S10.1 I S10.1 1 I I <br /> a� 14 '2 2 r F5.0 N - -CW1 - - 'n I� I o L M - J N I I I I - - - - � HDU2 <br /> - IHDU14 F8.0�1 N I F5.0 = I = X /F6.0 i� -- - - - - - - r- �F4.0 L -- - J -- ti - - - - - -1 L - -(2)HD19- J HDU2-(2)HD19 -J (2)HD19- - J (HDU8 -(2)HD19 L -(2)HD19- 2 HD 9 - - O <br /> F3.0 E3 C55 - O U <br /> - - - - - - - - - - - - SW-2 (18'-2")- - - - - - - - - - - - - - - - SW2 (18'-2")- - - - - - - SW-2 (8 1 <br /> C3.5 S37 L -� I�F8.0 L I I 1 2 HDU14 4 <br /> p J I I L - - L C55 I o f WF3.OA WF3.OA WF3.OA a O _ <br /> � ,�, 4' I.� I I - F6.0 1 1 U- 1 LWF3.OA L - -WF3.OA- L - L z p <br /> HDU14 5 -1 r - I I 3: - - - - - - SW-2 (9'-4")- - - - - - - SW-2 (18'-2") - - - SW-2 (18'-2")- - - - - - J <br /> 0 - <br /> O -_ ' r - - _ I I _ _ HDU8 - I <br /> C3.U) co � I i S10.1 M �C44 1 C93 I I - - <br /> I F4.0 � C4.5 - - - (2)HD19 - - - F_ - - - 7 r - - I <br /> E _ J \C44 1 1 7t I -' _// �;r, [� 1 (2)HD19 I 1 HDU2 (2)HD19 i (2)HD19 (2)HD19 1 1 (2)HD1 1 1 1 <br /> Q M k� <br /> I <br /> HDU2 I I I I L � _ J � C44 � I I FS.o �F7.o IIT I�FS.o I I I I I I I I I I t l I I <br /> 1 I 1 1 I I C4.5 c95 C93 I I I I I I I I I I <br /> o _ I I -1 I I I I I HDU2 REVISIONS: <br /> S10.1 I l 0 1 F_ -1 F_ -1 / L - 1 (2i HDU14 LF5.0 L - - - J I I I I t <br /> I I �F5.0 I/F5.0 F3.0 C44 1 2 �, I o '^ 1 I = I - 1 11 .1 <br /> LD CDI I I I' I o s10 1 5 `- <br /> I �' I I I s o <br /> o co a, I F .0 I I� I� I I �- <br /> �, �, I o I C55 C4.5 L J C44 U- I I 2IL <br /> I � I L _ _J L _ _J L _ _J ;r, I� S10.1 I I s1o.1 <br /> I I I I co c N N I I I I I 5 I I II IIS I I <br /> I <br /> � o �I 5 0 � 1 1 1� I I � I I I I III s1o.1 I I I I cn I � � �Iir 1 � 4 OWNER REV. 04/03/19 <br /> I I I I 2 N "' S1o.1 �" ��„ I I I I I I I I I 2 11 2 I 2 PLAN CHECK 2 11/12/18 <br /> HDU14 I 2)HDU11 C44 15° 2 I I HDU2 1 1 S10.1 I I I 1 BLDG DEPT 10/12/18 <br /> I L - WF2.5 I I I � WF2_5 � <br /> I HDU2 2 I I I I 2 �.��� F4.0 C551 �- (2)HDU111 - (2)HDU11- - J (2)HDU11 HDU2 REV DESCRIPTION DATE <br /> (G.9 - I I i i = I ,(2)HDU14 Ste ' F5.0Al - - - = I I SW-5)(9'-2")- <br /> I WF2.5 (2)HDU111 L __ � - - - -- - N - <br /> 0 H - _ <br /> �,I � - - - SW-5 (T-2") � HDU8 I I I I `(2)HDU11 <br /> �, I 1 ( N [\F4.0 _ L O BA PROJECT# 161010 <br /> (2)HDU11 I F5.0 F5.0 F5.0 F5.0 F5.0 F5.0 I -- J 1 � L- - - _(2)HDU11J (2)HDU11--(2)HDU11I L _(2)HDU11- - - - <br /> E �, SW-5 (8'-3") C44 C44 C44 C44 C4.5 I I I PLN PROJECT# 17077 <br /> � I r r 4 - - �- -L C3.5 F4.0 S10.1 <br /> _(2)HDU11 LO <br /> - (2)HDU11_ _(2)HDU11 (2)HDU11_ _(2)HDU11 (2)HDU11_ _(2)HDU11 j�(2)HDU11_(2)HDU11 C44��2)HDU11� - - - - I I - - - - - - SW-5 (T-2")- WF2 5 - SW 5 (8'-1")- - - - - - - - <br /> 1 L - - - -- - 1 1 MARRIOTT# 4476 <br /> WF2.5 SW 5 ("f' 2")- - - - SW 5 (7 -2)- - - - SW-5 (7'-2") - - - - SW 5 (7 -2")- - SW-5 (9'-9") <br /> - <br /> M - - � - - J - - J - - J WF2.5 - -6 41/2" � � � L - - - - J L - - - - - J PERMIT# <br /> (2)HDU11 F4.0 M <br /> 1 2 \ - - - - APN# 058-66-012 <br /> c- L F5.0 1 <br /> Q ao <br /> �, '� 1 DATE: 11/13/2018 <br /> M C&5 C3.5 S10.1 <br /> p DRAWN: JK <br /> Lu <br /> v CHECKED: JM <br /> o M <br /> P6 P6 <br /> 0 <br /> _ <br /> - - - -- - - WF2.0- - - - <br /> - - LE: <br /> P6 FOUNDATION <br /> Q 22' PLAN <br /> 0 <br /> U <br /> N <br /> N <br /> N <br /> N <br /> O <br /> L <br /> FOUNDATION PLAN SCALE: 8"=1'-0" <br /> L <br /> 0i <br /> SHEET NO.: <br /> c <br /> co <br /> L <br /> Simi <br />