My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3355
>
1600 - Food Program
>
PR0515486
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2020 3:43:04 PM
Creation date
8/25/2020 3:06:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0515486
PE
1625
FACILITY_ID
FA0012181
FACILITY_NAME
MCDONALDS #20612
STREET_NUMBER
3355
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
12618007
CURRENT_STATUS
01
SITE_LOCATION
3355 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
JCastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL PLUMBING NOTES ABBREVIATIONS <br /> GENERAL: ACM AREA CONSTRUCTION MANAGER <br /> 1 . ALL WORK PERFORMED SHALL BE IN ACCORDANCE WITH ALL LOCAL CODES 5. THE GREASE INTERCEPTOR SHALL BE VENTED IN ACCORDANCE WITH THE <br /> AND ACCEPTABLE TO THE AUTHORITY HAVING JURISDICTION. LOCAL CODE OR THE MANUFACTURER'S REQUIREMENTS. <br /> 2. ALL PLUMBING WORK SHALL BE PERFORMED BY A LICENSED PLUMBER. 6. ACCESS TO THE GREASE INTERCEPTOR SHALL BE PROVIDED WITH TWO (2) AVB ATMOSPHERIC VACUUM BREAKER <br /> 24IN. MANHOLES. ALL SURFACE WATER MUST DRAIN AWAY FROM MANHOLES. <br /> 3. ALL DIMENSIONS, CLEARANCES AND TOLERANCES SHALL BE VERIFIED PRIOR <br /> TO INSTALLATION. ALL ROUGH-IN LOCATIONS SHALL BE COORDINATED WITH 7. PIPING INLET AND OUTLET SIDES SHALL BE CLEARLY LABELED ON THE TOP BSI BEVERAGE SYSTEM INSTALLER <br /> THE MANUFACTURER'S SUBMITTAL INFORMATION. OF THE GREASE INTERCEPTOR TO INSURE PROPER INSTALLATION. <br /> 4. ALL DIMENSIONAL INFORMATION IS AS FOLLOWS (UNLESS NOTED OTHERWISE): DOMESTIC SUPPLY SYSTEMS: CO CLEAN-OUT <br /> A. UNDERGROUND PIPE IS TO FOUNDATION 1 . THE INCOMING WATER SERVICE PIPE SHALL BE LOCATED A MINIMUM OF 5 FT. z <br /> 0 <br /> B. OVERHEAD PIPE IS TO FINISHED WALL FROM THE EXITING SANITARY PIPE. WHERE A 5 FT. SEPARATION IS NOT o <br /> C. ELEVATIONS ARE TO FINISHED FLOOR POSSIBLE, THE BOTTOM OF THE WATER SERVICE PIPE SHALL BE A MINIMUM DC DOWNSPOUT COVER <br /> OF 12 IN. ABOVE THE TOP OF THE HIGHEST POINT OF THE SANITARY PIPE. o <br /> 5. ALL MATERIALS, FIXTURES AND EQUIPMENT USED SHALL BE IN ACCORDANCE cn <br /> WITH McDONALD'S SPECIFICATIONS. SPECIFICATIONS ARE CONTAINED WITHIN 2. ALL UNDERGROUND SITE PLUMBING SHALL CONFORM TO NSF 61 , SHALL BE DFU DRAINAGE FIXTURE UNIT(S) <br /> THESE DRAWINGS AND THE McDONALD'S PROJECT MANUAL. ANY CONTRACTOR TYPE K COPPER TUBING OR COPPER PIPE, POLYETHYLENE (PE) OR CPVC. <br /> IN NEED OF A COPY OF THE McDONALD'S PROJECT MANUAL SHALL CONTACT IF CPVC IS USED, FOAM INSULATION SHALL BE INSTALLED AT ALL CHANGES <br /> THE McDONALD'S AREA CONSTRUCTION MANAGER. ANY VARIANCE FROM THE OF DIRECTION TO ACCOUNT FOR EXPANSION AND CONTRACTION. EC ELECTRICAL CONTRACTOR <br /> McDONALD'S SPECIFICATIONS SHALL BE REVIEWED AND APPROVED BY THE 3. INCOMING WATER SERVICE PRESSURE SHOULD BE BETWEEN 45 AND 55 PSI <br /> ENGINEER-OF-RECORD. STATIC. WHERE WATER PRESSURE SERVICE EXCEEDS 80 PSI STATIC, AN <br /> APPROVED WATER-PRESSURE REDUCING VALVE WITH STRAINER CONFORMING FAC FIRE ALARM CONTRACTOR <br /> 6. SEE COORDINATION SCHEDULE FOR ADDITIONAL SCOPE OF WORK. TO ASSE 1003 SHALL BE INSTALLED. WHERE INCOMING WATER PRESSURE IS <br /> 7. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH ITS LISTING BELOW 45 PSI STATIC, A PRESSURE BOOSTER SYSTEM SHALL BE INSTALLED. <br /> FCO FLOOR CLEAN-OUT <br /> AND/OR THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. 4. IF THE RESTAURANT HAS A COMBINED WATER AND FIRE SPRINKLER SERVICE, <br /> i <br /> 8. WHERE POOR SOIL CONDITIONS EXIST OR WHERE SUBSTANTIAL SETTLEMENT THE INCOMING WATER SERVICE SHALL BE SIZED BASED ON THE FIRE BACKFLOW PREVENTER SCHEDULE <br /> OF EITHER THE PIPING, THE BUILDING OR ADJACENT WALKS, PLANTERS, ETC., SPRINKLER CONTRACTOR'S HYDRAULIC CALCULATIONS. ED FLOOR DRAIN <br /> LLJ <br /> MAY OCCUR, THE CONTRACTOR SHALL PROVIDE ADEQUATE UNDERSLAB <br /> STAINLESS STEEL PIPE HANGERS OR APPROVED OTHER SUPPORT. 5. PROVIDE A MINIMUM Y2" ANNULAR CLEARANCE AROUND ALL PIPE SLAB o <br /> PENETRATIONS. ASSE FPC FIRE PROTECTION CONTRACTOR <br /> 9. ALL PIPE SLEEVES SHALL BE PROPERLY SEALED AND INSULATED TO PREVENT TYPE MFR. t MODEL LISTING SERVES LOCATION <br /> HEAT LOSS AND SEEPAGE. 6. A REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER (RPZ) SHALL BE Ap FURN. WITH CHEM. SYS. 1055B CHEMICAL SYSTEM DIN. RM.-MOP SINK w <br /> INSTALLED AT THE INCOMING SERVICE WHERE REQUIRED BY CODE. A URN. WITH CHEM. SYS. 1055B CHEMICAL SYSTEM KITCHEN-MOP SINK FS FLOOR SINK <br /> 10. ALL PIPE INSULATION SHALL BE PROTECTED FROM DAMAGE FROM PIPE AVB URN. WITH CHEM. SYS. 1001 CHEMICAL SYSTEM SUPP. RM.-3-COMP <br /> HANGERS. PROTECTION SHALL BE LIGHT GAUGE GALVANIZED STEEL OR 7. AN EXPANSION TANK SHALL BE INSTALLED ON THE COLD WATER LINE INLET <br /> EQUAL. TO THE WATER HEATER. SEE EXPANSION TANK SCHEDULE. AVB FURN. WITH FAUCET - MOP SINK FAUCET SEE DRAWINGS GC GENERAL CONTRACTOR <br /> V13 FURN. WITH HB 1011 WALL HYDRANT SEE DRAWINGS QaoFEsso <br /> 11 . ALL PENETRATIONS OF FIRE-RATED WALLS SHALL BE FIRESTOPPED WITH AN 8. ALL WATER SUPPLY PIPE WITHIN 5 FT. OF THE BUILDING AND INSIDE THE DCV FURN. WITH HB 1052 YARD HYDRANT TRASH CORRAL <br /> APPROVED AND LISTED FIRESTOPPING SYSTEM. BUILDING SHALL COMPLY WITH NSF 61 AND SHALL BE TYPE L COPPER DCV FURN. WITH HB 1052 ROOF HYDRANT ROOF GI GREASE INTERCEPTOR <br /> TUBING, COPPER PIPE OR CPVC PIPE. DCV WATTS SD-3 1022 SODA TOWERS AND SPEC. COFFEE 9 X <br /> SANITARY AND VENT SYSTEMS: <br /> 1 . THE BUILDING SANITARY PIPE SHALL BE LOCATED A MINIMUM OF 5 FT. FROM 9. CPVC PIPE SHALL BE FLOWGUARD GOLD OR FLOWGUARD BENDABLE AS RPZ WILKINS 375XL-SXL-AG 1013 INCOMING WATER SUPPORT ROOM *N, �* <br /> THE INCOMING WATER SERVICE. WHERE A 5 FT. SEPARATION IS NOT MANUFACTURED BY LUBRIZOL. RPZ WILKINS 375XL-AG 1013 FILTRATION SYSTEM SUPPORT ROOM GPF GALLONS PER FLUSH �i�oHA LV A <br /> POSSIBLE, THE BOTTOM OF THE WATER SERVICE PIPE SHALL BE A MINIMUM O(o <br /> OF 12 IN. ABOVE THE TOP OF THE HIGHEST POINT OF THE SANITARY PIPE. 10. CPVC PIPE SHALL BE CONNECTED WITH FLOWGUARD GOLD YELLOW LOW-VOC VALVE SCHEDULE 0 <br /> SOLVENT CEMENT AS MANUFACTURED BY IPS WELD-ON OR OATEY. GPM GALLONS PER MINUTE <br /> 2. ALL SANITARY AND VENT PIPE SHALL BE PVC TYPE DWV, ABS OR CAST-IRON d v <br /> WHERE REQUIRED BY CODE. 1 1 . ALL CPVC PIPE SHALL BE INSULATED TO PREVENT EXPOSURE TO GREASE. o <br /> , = <br /> TEMP. GW GREASE WASTE Lu O a <br /> 3. ALL HORIZONTAL SANITARY PIPE SHALL BE INSTALLED WITH A MINIMUM PITCH 12. ALL SUSPENDED PIPE SHALL BE SUPPORTED AS FOLLOWS: MANUFACTURER MODEL SETTING LISTING SERVES � , i U <br /> AS FOLLOWS: MATERIAL MAX. HORIZ. SPACING MAX. VERT. SPACING WATTS LFMMV 110 E ASSE 1017,1069,1070 CHEMICAL SYSTEM MIXING ° <br /> PIPE SIZE MIN. SLOPE COPPER PIPE 12 FT. 10 FT. WATTS LFMMV 104°F ASSE 1017,1069,1070 LAVE & HAND SINKS MIXING HS HAND SINK <br /> 2Y2" OR LESS )/4" PER FT. COPPER TUBING <1Y4" 6 FT. 10 FT. ZURN ZW3870XLT 1047 loomm <br /> 3" TO 6" %8" PER FT. COPPER TUBING >1Y2" 10 FT. 10 FT. WATTS LFUSG-B 110°F ASSE 1016, 1070 VEGETABLE PREP. SINK MIXING <br /> 8" OR LARGER %6" PER FT. CPVC <1 " 3 FT. 10 FT. B & G CB-1/2 - - RECIRC. SYSTEM BALANCING VALVE I.P.S. IRON PIPE SIZE (ALSO NPS) <br /> CPVC _>V/4" 4 FT. 10 FT. NIBCO 585-70-HC - - CHEMICAL SYSTEM SHUT-OFF 'kin4. CLEANOUTS SHALL BE INSTALLED IN ALL HORIZONTAL DRAINAGE PIPE AND NIBCO S-FP-600A-LF - - RESTROOM SHUT-OFF KEI KITCHEN EQUIPMENT INSTALLER W <br /> SHALL BE LOCATED NOT MORE THAN 100 FT. APART. 13. A REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER (RPZ) SHALL BE NIBCO S-FP-600A-LF - - COMBI OVEN WATER SHUT OFF Q) E <br /> INSTALLED AT THE INLET TO THE WATER FILTRATION SYSTEM. ALL PIPING WATTS LFFBV-PEX - - COMBI OVEN RO WATER SHUT OFF m , o <br /> Cb <br /> 5. CLEANOUTS SHALL BE INSTALLED AT ALL CHANGES OF DIRECTION GREATER DOWNSTREAM OF THE RPZ SHALL BE COPPER OR CROSS-LINKED <br /> THAN 45 DEGREES. WHERE MORE THAN ONE CHANGE OF DIRECTION OCCURS POLYETHYLENE (REX). KES KITCHEN EQUIPMENT SUPPLIER < O a6 o <br /> IN A SINGLE PIPE RUN, ONLY ONE (1 ) CLEANOUT SHALL BE REQUIRED FOR �m U <br /> COORDINATION SCHEDULE w <br /> EVERY 40 FEET OF DEVELOPED LENGTH. 14. ALL DEVICES, APPLIANCES, AND APPARATUS INTENDED TO SERVE SOME � � ol <br /> SPECIAL FUNCTION SHALL BE PROVIDED WITH PROTECTION AGAINST BACKFLOW LAV LAVATORY <br /> 6. CLEANOUTS SHALL BE INSTALLED ON PIPES PRIOR TO ANY SLAB AND CONTAMINATION OF THE WATER SUPPLY SYSTEM. ALL BACKFLOW FINAL NOTES: 0 <br /> PENETRATION. PREVENTION DEVICES SHALL BE ASSE LISTED AND APPROVED FOR THE DEVICE 1 . THIS SCHEDULE IS INTENDED AS A GUIDE FOR THE WORK TO BE � i u a °Q) <br /> OR APPLIANCE THEY SERVE. GENERAL REQUIREMENTS FURNISH INSTALL CONNECTION NOTES PERFORMED. ALL WORK SHALL BE COORDINATED BETWEEN THE MC MECHANICAL CONTRACTOR o 0 0 o � o'" <br /> 7. WHERE PIPING IS LOCATED WITHIN WALL CAVITIES, ACCESS TO THE CLEANOUTS MECHANICAL PERMIT MC 1 -3 McDONALD'S AREA CONSTRUCTION MANAGER AND ALL GC AND o Q 0 6 <br /> SHALL BE PROVIDED. 15. ALL WATER SUPPLY LINES SHALL BE PROVIDED WITH A QUARTER-TURN <br /> HOT WORK (WELDING) PERMIT (IF APPLICABLE) KFS 1 3 0/0 SUBCONTRACTORS. <br /> SHUT-OFF VALVE BEFORE FINAL CONNECTION TO EQUIPMENT. MHT MALE HOSE THREADS J O <br /> 8. CLEANOUTS ON 6-IN. AND SMALLER PIPES SHALL BE PROVIDED WITH A PLUMBING PERMIT PC 1 -3 a QO <br /> CLEARANCE OF NOT LESS THAN 18 IN. CLEANOUTS ON 8-IN. AND LARGER 16. QUARTER-TURN SHUT-OFF VALVES SHALL BE INSTALLED UPSTREAM OF ANY ELECTRICAL PERMIT EC 1 -3 2. ONE (1) COPY OF THE DECOR PACKAGE DRAWINGS SHALL BE 0 � o Q� N. <br /> PIPE SHALL BE PROVIDED WITH A CLEARANCE OF NOT LESS THAN 36 IN. INLINE BACKFLOW PREVENTION DEVICE. SUPPLIED TO THE GENERAL CONTRACTOR AND EACH OF THE o O ,N L <br /> FIRE SPRINKLER PERMIT (IF APPLICABLE) FPC 1 -3 SUBCONTRACTORS. IT SHALL BE THE RESPONSIBILITY OF THE MS MOP SINK Q w u) Q) ° Q) <br /> 9. ALL SUSPENDED SANITARY AND VENT PIPE SHALL BE SUPPORTED AS 17. ALL VALVES AND BACKFLOW PREVENTION DEVICES SHALL BE INSTALLED WITH FIRE ALARM PERMIT (IF APPLICABLE) FAC 1 -3 GENERAL CONTRACTOR AND THE SUBCONTRACTORS TO INSURE � � u - o <br /> THAT THEY HAVE RECEIVED THE DECOR PACKAGE DRAWINGS. oN o 0 o a <br /> FOLLOWS: FITTINGS THAT FACILITATE REMOVAL IN CASE OF FAILURE. CONTRACTOR COORDINATION REQUIREMENTS NPS NATIONAL PIPE THREAD STANDARD c: -u ° <br /> MAX. HORIZ. MAX. VERT. PLUMBING SYSTEMS 3. FOR ANY WORK NOT CLARIFIED IN THIS SCHEDULE OR IN THE ° 0 0 0 ° a o <br /> 18. ALL OVERHEAD WATER LINES SHALL BE INSULATED WITH 1 " THICK EXTERNAL _c ° � Q) ° C <br /> MATERIAL SPACING SPACING WATER HEATERS PC PC PC 1 -4 NOTES AND SPECIFICATIONS, PLEASE CONSULT THE McDONALD'S <br /> JACKETED INSULATION AND A MINIMUM INSTALLED R-VALUE OF 3.7. . o o c) 0- ° <br /> ABS 4 FT. 10 FT. HOT AND COLD WATER PIPE PC PC PC 1 -4 AREA CONSTRUCTION MANAGER FOR SCOPE OF WORK. NPT NATIONAL PIPE THREAD TAPERED a ° '�_ ° O <br /> PVC (TYPE DWV) 4 FT. 10 FT. 19. PRIOR TO BUILDING TURNOVER, THE DOMESTIC WATER SUPPLY SYSTEM SHALL VENTS AND INTAKES PC PC PC 1 -4 c ° ° 0 -c O <br /> CAST-IRON (<10 FT. PIPE SECTIONS) 5 FT. 15 FT. BE PURGED OF DELETERIOUS MATERIAL AND DISINFECTED. DISINFECTION THERMOSTATIC MIXING VALVE PC PC PC 1 -4 4. SEE PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION. 0 J 0 0 <br /> CAST-IRON 10 FT. PIPE SECTIONS 10 FT. 15 FT. SHALL BE DONE IN ACCORDANCE WITH THE LOCAL HEALTH CODE, PLUMBING POWER AND CONTROL WIRING EC EC EC 1 -5 0/0 OWNER/OPERATOR .� < a 0 <br /> ( ) 5. SEE ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION. <br /> CODE OR IN ACCORDANCE WITH AWWA C651 OR AWWA C652. D ° <br /> 10. ALL PLUMBING FIXTURES SHALL BE VENTED AND THE MAXIMUM DISTANCE O ° .°" o� °° <br /> FROM THE FIXTURE TRAP TO THE VENT SHALL BE AS FOLLOWS: 1 OH OVERHEAD Q N , <br /> PLUMBING FIXTURE SCHEDULE C, C:) U) � ° Qo <br /> TRAP SIZE SLOPE DISTANCE ° ° ° <br /> 1Y4" %4" PER FT. 2' 6" ° ° o) a <br /> TAG DESCRIPTION MANUFACTURER MODEL WATER USE ACCESSORIES/COMMENTS P PUMP 0 ' <br /> 1Y2" %4" PER FT. 3'-6" o ' � " 0.3 ° <br /> TOTO TEL1 01 -D1 OE#C 1 .0 GPM FAUCET OPERATION: SENSOR a ° 3 ° ° ° a <br /> 2" /4" PER FT. 5'-0' o a T ° <br /> 3" %8" PER FT. 6' 0" F-1 FAUCET FOR LAV-1 0.17 GAL/1 Q Q� D N � j ° <br /> W 0 7 N O <br /> 4" & LARGER %g" PER FT. 10' 0" SEC CYCLE) PC PLUMBING CONTRACTOR w o <br /> ZURN Z1400-SZ ° ° c ° <br /> Q'�° I <br /> 11 . ALL PLUMBING VENTS THROUGH THE ROOF SHALL TERMINATE A MINIMUM OF FCO 6x6 FLOOR CLEAN OUT JAY R. SMITH 4040 SEE NOTE 8 <br /> 18 INCHES ABOVE THE ROOF AND SHALL BE LOCATED A MINIMUM OF 8 FT. RC REFRIGERATION CONTRACTOR o � <br /> FROM ANY PARAPET WALL. WHERE A VENT TERMINATES WITHIN 8 FT. OF A FD-2 6x6 FLOOR DRAIN ZURN 2415-SZ PIPE SIZE: 3 FUNNEL: NONE Q u Q0 <br /> PARAPET WALL, THE VENT SHALL TERMINATE A MINIMUM OF 6 INCHES ABOVE JAY R. SMITH 2005 STRAINER SIZE: 6" NICKEL BRONZE SEE NOTE 8 m N o L oN <br /> THE PARAPET. FAUCET: F-1 SEE NOTE 10 RPZ o � <br /> KOHLER K-2882-0 � o <br /> REDUCED PRESSURE PRINCIPLE z = w 0 N <br /> LAV-1 LAVATORY TRUEBRO LAVGUARD2 MODEL #102-E-Z SEE DETAIL 2 ON P1 .6 BACKFLOW PREVENTER n z J (_0 <br /> 0 <br /> LEGEND CORIAN COUNTER BY G.C. � o <br /> 12. ALL PLUMBING VENTS SHALL TERMINATE A MINIMUM OF 10 FT. HORIZONTALLY �„ o o � � <br /> FROM ANY OUTDOOR AIR INTAKE. WHERE A PLUMBING VENT IS LOCATED TOTO CT705ELN#01 FLUSH VALVE: TOTO TET1 LA32#CP FLUSH VALVE OPERATION: SENSOR SS SANITARY SEWER <br /> WITHIN 10 FT. OF AN INTAKE, THE VENT SHALL TERMINATE A MINIMUM OF 2 WC-2 ADA WATER CLOSET ZURN Z5665 1 .28 GPF ZURN ZTR6200EV-LL SEAT: BEMIS MODEL 21 55C <br /> FT. ABOVE THE INTAKE. COLD WATER PIPING <br /> 1 " I.P.S., 1Y2" TOP SPUD Q <br /> ST STORM SEWER u <br /> 13. ALL SIDE WALL VENT TERMINATIONS SHALL BE PROTECTED TO PREVENT BIRDS TOTO UT445U#01 FLUSH VALVE: TOTO TEU1 UA1 2#CP FLUSH VALVE OPERATION: SENSOR z <br /> OR RODENTS FROM ENTERING OR BLOCKING THE VENT OPENING. - - - - - - - TEMPERED WATER PIPING (1 107) UR-1 ADA WALL-HUNG URINAL ZURN Z5755 0.125 GPF ZURN ZTR6203-ULF-LL SEE NOTE 2 0 <br /> 3/4" I.P.S., 1 " TOP SPUD ANTI-SIPHON, SPILL RESISTANT 0 <br /> 14. ALL FLOOR DRAINS THAT DO NOT SERVE EQUIPMENT SHALL BE PROTECTED SVB VACUUM BREAKER o <br /> AGAINST DRYING OUT EITHER THROUGH THE INSTALLATION OF A TRAP PRIMER, HOT WATER PIPING (1407) <br /> DEEP SEAL TRAP OR PROSET TRAP GUARD. <br /> TAB TEST AND BALANACE CONTRACTOR <br /> 15. ALL APPLIANCES SHALL DRAIN TO AN APPROVED SANITARY WASTE RECEPTOR UNDERGROUND WASTE PIPING w <br /> (FLOOR SINK OR FLOOR DRAIN WITH FUNNEL). INDIRECT DRAINAGE FROM AN <br /> APPLIANCE SHALL MAINTAIN AN AIR GAP BETWEEN THE PIPE OUTLET AND THE UG UNDERGROUND z fQ z <br /> TOP OF THE RECEPTOR. THE MINIMUM DISTANCE BETWEEN THE PIPE OUTLET _ _ _ _ _ _ _ u o z <br /> VENT PIPING CD <br /> AND THE TOP OF THE RECEPTOR SHALL BE TWICE THE DIAMETER OF THE z w <br /> APPLIANCE DRAIN PIPE. UR URINAL w <br /> GREASE INTERCEPTORS: EXISTING UNDERGROUND WASTE PIPING O 6� <br /> Q <br /> 1 . SEE SITE PLAN FOR THE SIZE AND LOCATION OF THE GREASE INTERCEPTOR. V VENT m Fy � a w <br /> z wui Ln <br /> 2. THE GREASE INTERCEPTOR SHALL BE INSTALLED IN A LOCATION THAT IS IR THERMOSTATIC MIXING VALVE 0 (D o <br /> ACCESSIBLE FOR PUMPING. 1z Q w <br /> NOTES: WC WATER CLOSET Z zo U z co <br /> 1 . SEE McDONALD'S PROJECT MANUAL FOR ADDITIONAL MANUFACTURERS TO ORDER PLUMBING FIXTURES, F7 � wco <br /> 3. THE GREASE INTERCEPTOR SHALL BE CONSTRUCTED OF FIBERGLASS OR ® CLEAN-OUT (FLOOR OR YARD) 2. PLUMBING CONTRACTOR SHALL COORDINATE WITH G.C. TO PROVIDE BLOCKING FOR PROPER URINAL SUPPORT CONTACT HD SUPPLY: Ir � w _o 0 <br /> PRECAST CONCRETE. GREASE INTERCEPTOR CONSTRUCTION SHALL CONFORM 3. PLUMBING CONTRACTOR SHALL COORDINATE WITH G.C. TO PROVIDE INTERIOR BLOCKING ON W W BUILDING FOR WALL CLAMP PHONE: 866 310-3576 w CD X � o a w 't <br /> TO ALL LOCAL CODES. / WCO WALL CLEAN-OUT <br /> 4. YARD HYDRANT IS FOR TRASH CORRAL - SEE SITE PLAN FOR LOCATION E-MAIL: MCDCOORD@HDSUPPLY.COM N LTJ w c o <br /> 4. PRECAST CONCRETE INTERCEPTORS SHALL BE CAPABLE OF 3,000 PSI ® FLOOR DRAIN 5. PLUMBING CONTRACTOR SHALL ROUTE Y$" DRAIN PIPE FROM HOSE BIBB TO NEAREST FLOOR DRAIN OR FLOOR SINK <br /> COMPRESSIVE STRENGTH AT 28 DAYS, SHALL BE REINFORCED WITH BAR OR 6. PLUMBING CONTRACTOR SHALL COORDINATE WITH G.C. TO PROVIDE BLOCKING FOR PROPER SINK SUPPORT WSFU WATER SUPPLY FIXTURE UNIT(S) <br /> WIRE MESH AND SHALL BE COATED WITH A MINIMUM OF TWO (2) LAYERS OF 7. SEE KITCHEN DRAWINGS FOR ADDITIONAL INFORMATION - PLUMBING CONTRACTOR SHALL COORDINATE INSTALLATION WITH K.E.S. o <br /> NOVOLAC EPDXY ON THE INTERIOR. NOVOLAC EPDXY SHALL BE FLOOR SINK 8. PLUMBING CONTRACTOR SHALL SPECIFY CONNECTION MATERIAL/TYPE WHEN ORDERING w P4 * O <br /> SHERWIN WILLIAMS NOVA-PLATE UHS (OR EQUAL). 9. PLUMBING CONTRACTOR SHALL SPECIFY BURY DEPTH WHEN ORDERING YC YARD CLEAN-OUT N <br /> 10. PLUMBING CONTRACTOR SHALL PROVIDE GRID DRAIN, P-TRAP AND VALVE STOPS FOR ALL SINKS & LAVS GENERAL NOTES <br />
The URL can be used to link to this page
Your browser does not support the video tag.