I m
<br /> 'I' II
<br /> III III III III o
<br /> II II II II
<br /> U
<br /> cn
<br /> Li
<br /> 0
<br /> O
<br /> CREW 0 O m
<br /> ER ORDER
<br /> 109 0 107
<br /> SUPPORT O
<br /> 104 KITCHEN KITCHEN & BOH NOTES 6
<br /> 105 NO WORK IN THIS AREA;
<br /> EXISTING TO REMAIN, U.N.O. 5
<br /> FF� I
<br /> 1 O I1I 2
<br /> FIB11 w
<br /> �J I I o
<br /> ❑
<br /> OFFICE
<br /> I�072&ai] ti 1 1 10 I �
<br /> 108
<br /> P ARCHITECT OF RECORD:
<br /> ��S�D ARC/,,
<br /> 11- 11COOLER CUSTOMER CRAIG S.
<br /> 110 SERVICE DINING
<br /> E�l — 100 , C ] 3 ` 101 * N . -31661
<br /> REN.3/31/2021 co
<br /> MENS 8 �b0 �O
<br /> 103 — 9
<br /> F ] — t/� r z
<br /> I°I • �I
<br /> 14 L-� 1'-5�„ ► o ro, — — W , w
<br /> 2 � _ — � o
<br /> FREEZER 13 4 4 a
<br /> 111
<br /> DINING
<br /> � 1 � 1] V♦
<br /> r
<br /> W
<br /> �■
<br /> E
<br /> m O O O
<br /> � r o
<br /> 14 �
<br /> 12 w a�
<br /> L U� �
<br /> `N U
<br /> CL U
<br /> w O N O a
<br /> °
<br /> WOMENS � o�°
<br /> 102
<br /> o 4) d :5 o
<br /> U N
<br /> Oo
<br /> U O L
<br /> o 0 O
<br /> p oLaveL ov
<br /> N J L .� o
<br /> II II II �� o
<br /> a a
<br /> III III III � _ �III pus� a E�_ o
<br /> II II II I�II II I�II� I o0.6
<br /> RESTROOM NOTES �'� �� ��� � �� �� 0 0 °0 3 c s
<br /> c L o--:05�
<br /> • NO WORK IN THIS AREA; �, o U o o - o
<br /> EXISTING TO REMAIN, U.N.O.
<br /> /w t L++ 6 O c
<br /> V, Ncc+% ayv
<br /> "O O-'tA E U c
<br /> O COU oc Xt O
<br /> N y U c N= N
<br /> cot d L U U
<br /> 'yo-, J~ c o o v 2
<br /> U v U-0 a0 0
<br /> Q
<br /> Wit)/ _o'yvc
<br /> a N o coir
<br /> Ul O•V 2
<br /> LEGEND a z w5
<br /> aL)
<br /> vm mL o0
<br /> C — — EXISTING CONSTRUCTION TO �'� a`i o'
<br /> BE REMOVED o 3 w` c°'3
<br /> w voLo. vov
<br /> EXTENT OF EXISTING o ® ° �` N+'v m c
<br /> CONSTRUCTION TO BE REMOVED a a'o N
<br /> DEMO PLAN EXISTING CONSTRUCTION af H a 3 °c of
<br /> TO REMAIN w
<br /> D1 .1 1/4 = 1 -0 w
<br /> r [If o 0) m z o 0)_ U N
<br /> w
<br /> m w w 0 O J cin \ oc(oo
<br /> GENERAL NOTES DEMOLITION KEYNOTES of
<br /> Q w
<br /> cn z w \
<br /> Lu U
<br /> 1. REFER TO A1.1 FOR NEW PLAN CONFIGURATION. VERIFY ALL DIMENSIONS OF REBAR INTO EXISTING SLAB W/ EPDXY GROUT. REPLACE OR REPAIR ANY 18. GC TO VERIFY EXISTING MCCAFE SYSTEM INSTALLATION PER THE FOLLOWING O REMOVE EXISTING MENU BOARDS. 13 RELOCATE EXISTING TRASH RECEPTACLE. U) c5
<br /> DEMOLITION WITH A1.1 VAPOR BARRIERS DISTURBED DURING EXCAVATIONS. CRITERIA REQUIRED BY THE ORANGE COUNTY HEALTH DEPARTMENT-
<br /> 2. DIMENSIONS ARE TO FACE OF FINISH AND/OR TO COLUMN REFERENCE LINES, 9. CONTRACTOR SHALL PROVIDE ALL TEMPORARY BRACING AS REQUIRED TO 18.1. MILK TUBING OUT OF TEMPERATURE CONTROL SHALL NOT EXCEED 18 REMOVE EXISTING McCAFE COUNTER AND WALL SYSTEM.
<br /> U.N.O. MAINTAIN STRUCTURAL STABILITY OF THE EXISTING STRUCTURE DURING ALL INCHES. O 14 EXISTING COLUMN TO REMAIN. rn
<br /> 3. THESE DRAWINGS WERE PREPARED BASED ON INFORMATION ATTAINED FROM A PHASES OF CONSTRUCTION. 18.2. THE UNIT DRAINS DIRECTLY TO A FLOOR SINK VIA A RIGID LINE.
<br /> ALL HOLES AND GAPS THROUGHOUT THE UNIT MUST BE SEALED WITHIN REMOVE EXISTING COUNTER SYSTEM.3.
<br /> SITE SURVEY. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS IN FIELD 10. PROTECT FROM DAMAGE DURING CONSTRUCTION ALL EXISTING WALLS, FLOORS, 18. AS PLASTIC,SUCH O
<br /> PRIOR TO DEMOLITION & NOTIFY THE ARCHITECT IN CASE OF DISCREPANCIES CEILINGS, ETC. THAT ARE TO REMAIN. CONTRACTOR TO PATCH & REPAIR ANY AN EIGHTH OF AN INCH WITH APPROVED MATERIALS ( o
<br /> IMMEDIATELY. DEMOLITION IS TO BE EXECUTED SO AS NOT TO DISTURB DAMAGED PORTIONS OF THE EXISTING BUILDING AS REQUIRED TO MATCH THE FOOD-GRADE SILICONE, AND/OR STAINLESS STEEL). o
<br /> EXISTING STRUCTURAL & ROOFING SYSTEMS, AND OTHER AREAS THAT ARE EXISTING ADJACENT CONSTRUCTION & FINISHES. 18.4. ALL TUBING MUST BE TRANSPARENT. REMOVE EXISTING INTERIOR WALL PARTITION. PATCH/REPAIR
<br /> INTENDED TO REMAIN INTACT. VERIFY ALL CONSTRUCTION TO BE REMOVED 11. ADJACENT FLOOR AND WALLS IN KIND.
<br /> THIS PLAN INDICATES A GENERAL SCOPE OF WORK TO BE PERFORMED AND O
<br /> THAT IS NOT INTEGRAL TO STRUCTURAL SYSTEM PRIOR TO DEMOLITION UNLESS DOES NOT RELIEVE THE CONTRACTOR TO COMPLETE THE BUILDING
<br /> NOTED. MODIFICATIONS AS SHOWN AND REQUIRED BY THE CONTRACT DOCUMENTS, O EXISTING SSBB TO REMAIN; PROTECT DURING CONSTRUCTION.
<br /> 4. ALL DIMENSIONS SHOWN AS EXISTING SHOULD BE FIELD VERIFIED BY INCLUDING BUT NOT LIMITED TO PLUMBING, ELECTRICAL & HVAC WORK.
<br /> CONTRACTOR PRIOR TO DEMOLITION. VERIFY ALL DEMOLITION WORK W/ NEW 12. IF CONTRACTOR ENCOUNTERS ANY HAZARDOUS MATERIALS DURING DEMOLITION EXISTING BULKHEAD TO REMAIN. (n Q
<br /> CONSTRUCTION & INSTALLATION DRAWINGS PRIOR TO BEGINNING O
<br /> OR CONSTRUCTION, HE SHALL IMMEDIATELY SUSPEND WORK & NOTIFY THE Q z
<br /> CONSTRUCTION. U o z cn
<br /> MCDONALD'S AREA CONSTRUCTION MANAGER BEFORE PROCEEDING. (D � –
<br /> EXISTING KITCHEN EQUIPMENT (COFFEE, CREAMER AND ICE TEA, ETC) TO a
<br /> 5. DEMOLITION CONTRACTOR TO COORDINATE & REVIEW ALL CONSTRUCTION 7 rr w w
<br /> 13. ALL DEMOLITION SHALL BE CARRIED OUT IN A SAFE MANNER & IN STRICT BE REMOVED AND RELOCATED, CONFIRM WITH ACM z w rr z
<br /> DOCUMENTS & DETERMINE THE EXTENT OF DEMOLITION WORK & BECOME � � z
<br /> FAMILIAR WITH THEM THOROUGHLY BEFORE PERFORMING ANY DEMOLITION ACCORDANCE WITH OSHA REGULATIONS. U 0 a N m
<br /> EXISTING SHAKE MACHINE TO BE RELOCATED. REFER TO A1.1
<br /> WORK. BY THE ACT OF STARTING DEMOLITION, THE CONTRACTOR WILL BE 14. THE SUB—CONTRACTOR SHALL FIELD VERIFY THE EXTENT OF DEMOLITION. THE 8 FOR NEW LOCATION. Of �` a
<br /> DEEMED TO HAVE COMPLIED WITH THE FOREGOING, TO HAVE ACCEPTED SUCH WORK INCLUDES, BUT IS NOT LIMITED TO THE DEMOLITION AND REMOVAL OF m o w o uj
<br /> N
<br /> CONDITIONS, AND TO HAVE MADE THE NECESSARY ALLOWANCES IN PREPARING ANY WALLS, COUNTERS, FURNITURE, BULKHEADS, DOORS, PLUMBING, O EXISTING KIOSK TO BE RELOCATED. REFER TO A1.1 m w � a �
<br /> HIS BID. MECHANICAL AND ELECTRICAL ITEMS INCLUDING CONDUITS AND DUCTWORK AS 9 z_ w
<br /> 6. ELECTRICAL DEMOLITION NOTE: REFER TO ELECTRICAL DRAWINGS FOR DETAILED SHOWN ON THE DRAWINGS OR AS REQUIRED TO COMPLETE THE INSTALLATION Q o V)
<br /> ELECTRICAL DEMOLITION NOTES. OF THE NEW WORK FOR A COMPLETE JOB. 10 DEMO EXISTING SOFFIT AND PREPARE FOR NEW CEILING GRID. (n z z a
<br /> REFER TO A1.2 FOR EXTENT OF NEW CONSTRUCTION. o u z
<br /> 7. VERIFY DISPOSITION OF ALL FURNISHINGS, MILLWORK, LIGHTING FIXTURES, ETC. 15. REMOVE ANY SINKS, WATER CLOSETS, URINALS, LAVATORIES, FLOOR DRAINS, w b co
<br /> NOTED ON DRAWINGS AS WELL AS ALL ASSOCIATED PLUMBING ACCESSORIES. (n
<br /> TO BE REMOVED W/ OWNER. ALL ITEMS TO BE DISPOSED SHALL BE — � o N
<br /> DISPOSED OF OFF-SITE AND IN AN EXPEDITIOUS MANNER. CAP, PLUG ALL ABANDONED SUPPLY & WASTE LINES. PATCH & SEAL ALL 11 EXISTING CEILING AND GRID TO REMAIN ABOVE. J O X 0 o x w 1
<br /> FLOOR PENETRATIONS. SEE MECHANICAL & PLUMBING DRAWINGS FOR PATCH, REPAIR AND REPLACE DAMAGED AREAS OF CEILING AS N W o o w N o
<br /> 8. SAWCUT & REMOVE EXISTING SLABS AS REQUIRED FOR UNDERGROUND DETAILED DEMOLITION NOTES. REQUIRED FROM DEMOLITION OF GYP BOARD SOFFIT.
<br /> ELECTRICAL & PLUMBING LINES. REFER PLUMBING, ELECTRICAL & KITCHEN
<br /> DRAWINGS FOR ALL SAWCUTS & TRENCHING WORK REQUIRED. ALL CONCRETE 16. WHEN UTILITIES ARE REMOVED, CAP & SEAL A MINIMUM OF 8" BELOW FINISH RELOCATE EXISTING FURNITURE AS REQUIRED TO
<br /> IN
<br /> FLOOR WORK TO BE FINISHED FLUSH WITH EXISTING FLOOR. DOWEL NEW FLOOR OR A MINIMUM OF 6" ABOVE FINISH CEILING. 12 ACCOMMODATE KIOSK RELOCATION. o
<br /> SLABS TO EXISTING W/ #4 REBAR ® 24" O.C. EACH SIDE (STAGGERED). 17. SEE D2.1 DEMOLITION ELEVATIONS, IF REQUIRED, FOR EXTENT OF EXTERIOR w •
<br /> REBAR TO EXTEND 6" INTO EXISTING SLAB & ACROSS CUT OPENING. SECURE DEMOLITION.
<br /> rn DEMO PLAN
<br />
|